1AMS-02 Crates mechanical designStatus
ReportM. Molina
2Thermal interface filler
- Chotherm (electrically insulating)
- Keratherm (electrically conductive, but with
adhesive properties TBD). - Sigraflex was discarded because too brittle.
- Dry contact (aluminum to aluminum) was discarded
for thermal reasons because we need an high
thermal conductance
3Alodine 1200, class 3
4(No Transcript)
5Conclusions
- Keratherm adhesive looks to be electrically
insulating. - Final selection is therefore Chotherm.
- Crate-radiator contact is not the main electrical
interface of the crates to the radiator - each crate wall is grounded via a dedicated
strap. - Chotherm with PSA (self-adhesive) proposed
6Â Â Â Â Â Â CSIST-CGS Procedure for mechanical
parts drawings delivery, check and production
for AMS-02. 2nd November 2004
7CGS declares how long will take to implement the
comments
START
A. Drawing delivery (dxf, pdf) B. Purpose for
release (1st issue or ECO implementation) C.
Model (QM, FM ...) D. ECO applicable to the
drawing (including location of the change) E.
Disposition of each individual comment received
1
CSIST/AMS provides comments
3
CSIST acknowledges the receipt How long is it
needed for final reviewing
CSIST Manufacturing drawing check
2
CSIST - announces production cannot start -
States how long the review will take
CSIST Drawing OK?
NO
YES
DRAWING IS DELIVEREDto AMS (M. Capell)
8E. Cortina M. Menichelli G. Ambrosi J. Marin D.
Casadei F. Spinella
M. Capell acknowledges the receipt How long is it
needed for final reviewing
AMS Manufacturing drawing check
4
AMS collaboration approval ? (M. Capell)
NO
CSIST announces manufacturing (re)start Specify
drawing revision Expected production
date Quantity Delivers CSIST production drawings
to CGS and AMS
YES
CGS stamp FOR PRODUCTION on the drawing
5
9NO
CSIST Return to print? i.e.rebuild?
YES
NO
PRODUCTION
CSIST Does manufacturing conform to design?
NO
NC programming Approval at CSIST
6
YES
YES
END CSIST Certificate of Conformance
END
10ECO to close the NCR
NEW ISSUE START AGAIN
CGS (with AMS) dispositions NCR and collects all
NCRs
Return to print
Use As Is
END CSIST Certificate of Conformance
END
7
CSIST generates an NCR (Non Conformance Report)
11For production (STEP 5) (issued 20th Dec 2004)
12FOR PRODUCTION
13Example drawing re-issued (STEP 3) Upper T crate
right wall (3D view missing)
14UpperT_CRATE main walls paper size A0
15Upper T crate assembly ANY COMMENTS ?
16ANY COMMENTS ?Drawings sent 20th December 2004
17DRAWING SENT BEFORE PROCEDURE
DRAWINGS NOT CONSIDERED BY CSIST
18LowerT_CRATE main walls PRODUCTION COMPLETED ?
19FILL this FORM for all drawings that are OK for
production
20XPD assembly
- A. Assenza, E. Cortina, F. Hauler
21Reissue of XPD ASSEMBLY NEW COPPER SPACER
- USE OF COPPER SPACER ONLY WHERE NEEDED (quantity
in part list as required) - The BUS BAR location is the same of EM model
- Integration procedure to be written
Florian, Eduardo, Mike, Mauro (?) agree with
Antonella
22COPPER SPACER 1 2 DIA 8.5mm
- The copper spacer can be used only when are
needed.
Fm copper spacer 1 Fm copper spacer 2
23COPPER SPACER 1 2 drawings delivered 28/2/2005
24XPD FM CONCLUSIONS
- Assembly drawings will be updated and the
sections views will we enclosed in the drawings. - The number of bolts used to mount the busbar will
be reduced - (e.G. FROM 9 to 4 FOR THE TPD)
- Updated of partlist with correct lenght and qty
of bolts
25I-frames for DC/DC BOARDS
- I-frames will have a local chamfer to avoid
contact with the board - REISSUE OF DRAWINGS NEEDED
26DC/DC BOARDS assy
- A cho-term foil will be added between the board
and the I-frame ( it will be also included on
assembly drawing and partlist)
27XPD thermal modelM. Cova
28TMM and GMM delivery
- TPD, T-crate , UPD and U-crate Thermal models
have been delivered to NSPO. - NSPO is now reviewing them.
29TPD Assembly
30Small I-frame
31Medium I-frame
32Large I-frame
33Controller I-frame
34Frame selection
35Thermal Model
- 3 different conductive thermal model, one for
each kind of frame
36 Results
Q
37Requirements
- Operative -20C ? 50C
- Non Operative -40C ? 80C
38TPD
39TPD Flight Design
40TPD location
41UPD Flight Design
42UPD location
43 TPD Analysis ResultsRadiator Temperature 45C