AMS-02 Crates mechanical designStatus
ReportM. Molina
2
Thermal interface filler
  • Chotherm (electrically insulating)
  • Keratherm (electrically conductive, but with
    adhesive properties TBD).
  • Sigraflex was discarded because too brittle.
  • Dry contact (aluminum to aluminum) was discarded
    for thermal reasons because we need an high
    thermal conductance

3
Alodine 1200, class 3
4
(No Transcript)
5
Conclusions
  • Keratherm adhesive looks to be electrically
    insulating.
  • Final selection is therefore Chotherm.
  • Crate-radiator contact is not the main electrical
    interface of the crates to the radiator
  • each crate wall is grounded via a dedicated
    strap.
  • Chotherm with PSA (self-adhesive) proposed

6
            CSIST-CGS Procedure for mechanical
parts drawings delivery, check and production
for AMS-02. 2nd November 2004
7
CGS declares how long will take to implement the
comments
START
A. Drawing delivery (dxf, pdf) B. Purpose for
release (1st issue or ECO implementation) C.
Model (QM, FM ...) D. ECO applicable to the
drawing (including location of the change) E.
Disposition of each individual comment received
1
CSIST/AMS provides comments
3
CSIST acknowledges the receipt How long is it
needed for final reviewing
CSIST Manufacturing drawing check
2
CSIST - announces production cannot start -
States how long the review will take
CSIST Drawing OK?
NO
YES
DRAWING IS DELIVEREDto AMS (M. Capell)
8
E. Cortina M. Menichelli G. Ambrosi J. Marin D.
Casadei F. Spinella
M. Capell acknowledges the receipt How long is it
needed for final reviewing
AMS Manufacturing drawing check
4
AMS collaboration approval ? (M. Capell)
NO
CSIST announces manufacturing (re)start Specify
drawing revision Expected production
date Quantity Delivers CSIST production drawings
to CGS and AMS
YES
CGS stamp FOR PRODUCTION on the drawing
5
9
NO
CSIST Return to print? i.e.rebuild?
YES
NO
PRODUCTION
CSIST Does manufacturing conform to design?
NO
NC programming Approval at CSIST
6
YES
YES
END CSIST Certificate of Conformance
END
10
ECO to close the NCR
NEW ISSUE START AGAIN
CGS (with AMS) dispositions NCR and collects all
NCRs
Return to print
Use As Is
END CSIST Certificate of Conformance
END
7
CSIST generates an NCR (Non Conformance Report)
11
For production (STEP 5) (issued 20th Dec 2004)
12
FOR PRODUCTION
13
Example drawing re-issued (STEP 3) Upper T crate
right wall (3D view missing)
14
UpperT_CRATE main walls paper size A0
15
Upper T crate assembly ANY COMMENTS ?
16
ANY COMMENTS ?Drawings sent 20th December 2004
17
DRAWING SENT BEFORE PROCEDURE
DRAWINGS NOT CONSIDERED BY CSIST
18
LowerT_CRATE main walls PRODUCTION COMPLETED ?
19
FILL this FORM for all drawings that are OK for
production
20
XPD assembly
  • A. Assenza, E. Cortina, F. Hauler

21
Reissue of XPD ASSEMBLY NEW COPPER SPACER
  • USE OF COPPER SPACER ONLY WHERE NEEDED (quantity
    in part list as required)
  • The BUS BAR location is the same of EM model
  • Integration procedure to be written

Florian, Eduardo, Mike, Mauro (?) agree with
Antonella
22
COPPER SPACER 1 2 DIA 8.5mm
  • The copper spacer can be used only when are
    needed.

Fm copper spacer 1 Fm copper spacer 2
23
COPPER SPACER 1 2 drawings delivered 28/2/2005
24
XPD FM CONCLUSIONS
  • Assembly drawings will be updated and the
    sections views will we enclosed in the drawings.
  • The number of bolts used to mount the busbar will
    be reduced
  • (e.G. FROM 9 to 4 FOR THE TPD)
  • Updated of partlist with correct lenght and qty
    of bolts

25
I-frames for DC/DC BOARDS
  • I-frames will have a local chamfer to avoid
    contact with the board
  • REISSUE OF DRAWINGS NEEDED

26
DC/DC BOARDS assy
  • A cho-term foil will be added between the board
    and the I-frame ( it will be also included on
    assembly drawing and partlist)

27
XPD thermal modelM. Cova
28
TMM and GMM delivery
  • TPD, T-crate , UPD and U-crate Thermal models
    have been delivered to NSPO.
  • NSPO is now reviewing them.

29
TPD Assembly
30
Small I-frame
31
Medium I-frame
32
Large I-frame
33
Controller I-frame
34
Frame selection
35
Thermal Model
  • 3 different conductive thermal model, one for
    each kind of frame

36
Results
Q
37
Requirements
  • Operative -20C ? 50C
  • Non Operative -40C ? 80C

38
TPD
39
TPD Flight Design
40
TPD location
41
UPD Flight Design
42
UPD location
43
TPD Analysis ResultsRadiator Temperature 45C
Write a Comment
User Comments (0)
About PowerShow.com