Title: sap qm online training tutorial (1)
1SAP Quality Management (QM) When to Leverage It,
How to Set It Up, and How to Integrate It with
Your Current Production Planning Processes
Online classroom Corporate Training
certifications placements support
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
2What This Session Will Cover, and Why!
- Due to regulations put forth by the Food Drug
Administration (FDA), the Federal Aviation
Association (FAA), Sarbanes-Oxley (SOX), and
others, SAP customers are compelled to use the
Quality Management (QM) component more than ever
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
3What This Session Will Cover, and Why! (cont.)
- QM is increasingly viewed as a business advantage
(as with Motorola Six Sigma plan Statistical
Process Control SPC) - This session will introduce the Quality
Management component (QM), and describe its main
uses relevant to SAP Production Planning (PP)
processes
Visit www.Magnifictraining.Com
4What Well Cover
- What is QM?
- How different manufacturing strategies
discrete, repetitive, and Process Industry
(PP-PI) change the ways to integrate QM - What are the differences between QM during
production and QM at the end of production? - Main customizing tasks to integrate QM with PP
- Master data requirements to integrate QM with PP
- Demo Process order with and without QM
- Wrap-up
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
5A Definition of QM
- Quality Management (QM) is a component of mySAP
PLM used to plan, check, verify, and document the
quality of products and processes - Three main requirements for a QM system
- Total Quality Management (TQM)
- Industry-specific standards FDA and Good
Manufacturing Practice (GMP) - Standards for QM systems (ISO 9000)
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
6Evolution of QM
- Lets see a brief look at the history of software
development in the quality management area - SAP R/3 QM Planned and event-controlled
processes in quality management for purchasing
and production, with little functionality
(compared to todays) - mySAP PLM QM Functional area of mySAP PLM,
encompassing quality engineering, quality
improvement, and quality assurance and control - mySAP ERP QM All QM-relevant processes
(quality planning, quality inspection, quality
certificate, quality notification, quality
control, test equipment management, stability
study)
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
7What Does QM Include?
- Quality Management is integrated in the SAP
system and uses basic and cross-application
functions, such as - Document Management System (DMS)
- Engineering Change Management (ECM)
- Classification System
- Audit Management
- Workflow
- ArchiveLink
- SAPoffice
- Example QM documents may be managed with DMS
(txn CC04) and/or SAPoffice (txn SBWP)
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
8Functions of the Quality Management Area
- Quality planning create and manage the master
data that is required to plan and execute quality
inspections - Quality inspection identify whether the
inspected units fulfill the predefined quality
requirements - Quality certificate certify the quality of a
material (contains texts, specification values,
and inspection results) - Quality notification record and process
internal and external problems that are primarily
caused by poor-quality goods or services
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
9Functions of the Quality Management Area (cont.)
- Quality control implement various preventive,
monitoring, and corrective activities - Specifications from quality planning and
evaluations from quality inspections and quality
notifications, form the basis for quality control
- Test equipment management manage master data,
as well as plan and process calibration
inspections for test equipment - Stability study manage basic data, as well as
the planning and execution of stability studies
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
10Quality Management (QM) in Production Planning
(PP)
- QM in PP covers the following areas
- Integrating inspection planning/production
operations - Inspection operations can be directly included in
routines (discrete manufacturing and repetitive
manufacturing) or Master Recipes (process
industry) - Controlling inspections during production
- Inspection lot origin 03 (during production)
- Inspection lot origin 04 (Goods Receipt GR
from production) - Statistical Process Control (SPC)
- For example, control chart with mean value and
standard deviation for an inspection
characteristic - Processing internal problem notifications
notification type Q3
Visit www.Magnifictraining.Com
11What Well Cover
- What is QM?
- How different manufacturing strategies
discrete, repetitive, and Process Industry
(PP-PI) change the ways to integrate QM - What are the differences between QM during
production and QM at the end of production? - Main customizing tasks to integrate QM with PP
- Master data requirements to integrate QM with PP
- Demo Process order with and without QM
- Wrap-up
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
12QM Changes According to Production Method
- QM uses different blocks (customizing, master
data, etc.) according to the production method
(discrete, process, and repetitive). Here are
some examples - When process order is used inspection planning
may reside in the Master Recipe - When production order is used inspection
planning may reside in the routine (txn CA03) - When PP-PI is used inspection results shall be
recorded in the PI sheet (txn CO60) - When discrete or repetitive is used inspection
results shall be recorded in the inspection lot
(txn QE51N)
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
13What Well Cover
- What is QM?
- How different manufacturing strategies
discrete, repetitive, and Process Industry
(PP-PI) change the ways to integrate QM - What are the differences between QM during
production and QM at the end of production? - Main customizing tasks to integrate QM with PP
- Master data requirements to integrate QM with PP
- Demo Process order with and without QM
- Wrap-up
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
14Process Order with QM
- When production is complete, enter the following
- Inspection results (through characteristics)
- Usage decision
- Only then, enter Goods Receipt of the material
into stock - The transactions
- CO60 maintain PI sheet
- QE51N find inspection lot per material
- QA11 enter usage decision
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
15DEMO Process Order with QM (cont.)
167 Key Points to Take Home (cont.)
- Focus on the main customizing and master data
tasks - Do not try to achieve everything right at the
beginning - Use notification wisely. It is very powerful.
- Make sure you allow production to continue
working after QM implementation - Do not sacrifice production on the altar of QM
USA 1-6786933994,16786933475 India-
91-9052666559 ,info_at_magnifictraining.com
Visit www.magnifictraining.com
17Contact Us
Most Trusted Website for all Learning Needs by
Students, Graduates and Working Professionals
You can also Find us on
http//www.magnifictraining.com
18 Thank you !
http//www.magnifictraining.com