CMRP Study Guide - PowerPoint PPT Presentation

About This Presentation
Title:

CMRP Study Guide

Description:

Here you can easily find the latest exam questions of CMRP. We ensure you that you will pass your exam in first attempt. We provide 100% accurate and verified CMRP Dumps. Don’t spend a lot of money on different fake sites. Visit us and we fulfill your dreams. Follow the link for latest real exam questions. – PowerPoint PPT presentation

Number of Views:86

less

Transcript and Presenter's Notes

Title: CMRP Study Guide


1
Pass CMRP - Certified Maintenance Reliability
Professional exam in just 24 HOURS! 100 REAL
EXAM QUESTIONS ANSWERS CMRP - Certified
Maintenance Reliability Professional Buy
Complete Questions Answers File
from http//www.exams4sure.net/smrp/cmrp-exam-ques
tions-dumps.html 100 Exam Passing Guarantee
Money Back Assurance
2
  • Sample Questions
  • Question No 1
  • Which of the following statements about
    reliability is true?
  • Reliability of a system or equipment can be
    improved as a result of administration or
    legislation
  • A reliable system can be designed from unreliable
    components if enough redundancy is used.
  • Reliability of a system or equipment can be
    improved as a result of testing.
  • Increasing the amount of maintenance cannot
    improve reliability above the level established
    by the design of a system.
  • Answer D Question No 2
  • What is a standard methodology to reduce or
    increase the frequency of a PM inspection?
  • Risk Based Inspection (RBI)
  • American National Standards Institute (ANSI)
  • American Petroleum Institute (API)
  • American Society of Mechanical Engineers (ASME)
  • Answer A Question No 3
  • What is the statistical average and the
    population standard deviation of the following
    series of numbers?
  • 1.30, 1.25, 1.50, 1.12, 1.35, 1.38
  • Statistical average 1.32 standard deviation
    0.128
  • Statistical average 1.50 standard deviation
    0.25
  • Statistical average 1.32 standard deviation
    1.50

3
  • Question No 4
  • Using predictive technologies, approximately what
    percent of failures in rotating equipment can be
    found?
  • A. 80
  • B. 60
  • C. 40
  • D. 20
  • Answer B Question No 5
  • Key performance indicators can be classified as
    leading or lagging indicators. An example of a
    lagging indicator for manufacturing is?
  • Mean Time Between Failures (MTBF).
  • Mean Time To Repair (MTTR).
  • Overall Equipment Effectiveness.
  • Operating Costs.
  • Answer D
  • Question No 6
  • In 'which of the following circumstances might it
    be appropriate to conduct a Failure Modes and
    Effects Analysis?
  • A custom-made production machine, critical to
    meeting production requirements, has failed for
    a third time in six months. The Maintenance
    Department has carefully inspected the machine
    after each failure, and each failure has been
    attributed to a loss of lubrication of the
    machine's bearings.
  • Corporate downsizing has reduced the staff of the
    Maintenance Department to two Reliability
    Technicians and two foremen for each craft
    (trade). These foremen will now manage contracted
    maintenance crews for all plant (facility)
    maintenance activities.
  • The Maintenance Department has assumed
    responsibility for maintenance of the equipment
    in a small production line acquired after buyout
    of a

4
  • smaller competitor. The competitor uses equipment
    that is different from the company's existing
    equipment.
  • D. The Production Department has added a third
    production shift to meet increased sales. The
    new shift will be staffed mostly of new employees
  • whose training consists of two weeks working with
    the day shift. Adding the third shift also
    increases equipment operating hours by 50.
  • Answer C Question No 7
  • The primary purpose of operations involvement in
    the maintenance program is to
  • Increase the skill levels of operations.
  • Reduce maintenance workforce staffing and
    maintenance costs.
  • Increase stakeholder contributions to asset
    maintenance.
  • Improve plant (facility) housekeeping and
    decrease contractors.
  • Answer B Question No 8
  • As the maintenance manager for a manufacturing
    company, you have conducted a study that reveals
    the mechanics, on average, spend four hours per
    ten hour shift on wrench time (tool turning
    time). Your first action should be
  • Improve planning and scheduling to increase
    wrench time (tool turning time).
  • Encourage your planners to develop more
    aggressive job estimates.
  • Inform management that four hours wrench time
    (tool turning time) per day is considered good.
  • Investigate the barriers causing loss of wrench
    time (tool turning time).
  • Answer A

5
  • Buy Complete Questions Answers File from
  • PDF Version Test Engine Software Version
  • 90 Days Free Updates Service
  • Valid for All Countries

http//www.exams4sure.net/smrp/cmrp-exam-questions
-dumps.html
Write a Comment
User Comments (0)
About PowerShow.com