Simmons Cabin - PowerPoint PPT Presentation

About This Presentation
Title:

Simmons Cabin

Description:

Pictures from July 2014 - May 2015 – PowerPoint PPT presentation

Number of Views:37
Slides: 84
Provided by: jmsimmons
Category: Other
Tags:

less

Transcript and Presenter's Notes

Title: Simmons Cabin


1
- Simmons Cabin - Moved in May 28, 2015CoO
received August 18, 2015
2
Outside Bedroom Door
3
Front Entrance with Full Moon
4
W Danby Entrance before Driveway - 2008
5
House Site - 1st Excavation Attempt for Driveway
6
Driveway Entrance Culvert Work
7
A lot of Driveway Work!
8
Driveway Coming Along
9
(No Transcript)
10
Excavation for Basement July 2014
11
Superior Foundation Basement (9)
12
Basement Foundation ready to backfill
13
Basement Ceiling
14
Trusses
15
Northeast View from future greatroom
16
First Logs Are Up!
17
Logs w/window framing side and front
18
Logs w/window framing side and back
19
Logs were cut on site
20
So much clay and sand
21
Log stacks cut for window spaces
22
Inspector on site
23
Indoor Outdoor Work Zones
24
First Floor Logs Complete
25
Gables ready to attach
26
Kitchen Nook, Gables Roofing On
27
Cabin North Side Greatroom/Kitchen/Nook
28
Kitchen Nook Bench Table
29
Here Truss, There Truss, Everywhere a Truss Truss
30
Up High!
31
East Front/South Side/Southwest Back Deckready
for Shingles.
32
Both Shed Porches w/ TG Soffit Love it!!
33
Shingles finished on Roof East Back Deck
34
Shingles Finished on Roof - West Front Porch
35
TG Soffit on Gable Overhangs
36
Inside Trusses Up, Up, and Away!
37
Great View When Finished
38
Family Outing in Sept 14
39
Ready for Gable Siding Soffits West Deck -
9/20/14
40
Ready for Gable Siding Soffits East Deck -
9/20/14
41
(No Transcript)
42
Duralife Decking better than Trex and greener
materials
43
Ready for Decking, Doors, More Inside Work
44
(No Transcript)
45
(No Transcript)
46
Front Entrance - Porch Overhang and inside foyer
behind plastic
47
Front Wall Entrance Greatroom Area
48
Framing Between Master BR Kitchen
49
1st Pic - Front Entry, ½ Entry, Pantry Frame2nd
Pic Greatroom Door to Deck and Nook
50
Greatroom insulation
51
Greatroom Gable w/start of TG, Fan Fixture
52
East Gable and Ceiling gables required foam
insulation for greater R value (a changed
requirement by code official and performed by a
separate contractor)
53
Greatroom East Gable before and after TG
54
Greatroom and Remote Fans
55
Stairway Construction (4 x 10 opening)
56
Stairway Completed
57
½ Bath Corner Toilet
58
Master BR (inside blind mounts)
59
Masterbath
60
Front Entrance Foyer, Light, Hall Bench
61
Framing of Island and Cabinets
62
Hood Fan
63
Molding Almost Complete
64
Tile on Wall
65
Cut out decorative copper pieces to match top
w/bottom strip
66
Kitchen Island Wine Holder (extra length for
inside chair)
67
Granite Supports on Island - Cardboard on New
Flooring and major work area.ugh!
68
Kitchen Island Countertop and Sink
69
Kitchen Island Backsplash Tile
70
Rt 34/96 Municipal Water and Utility Trench
71
Geo Zones and Water Pressure Pump
72
Water at Long Last!
73
Garage Pad Mar 2016
74
Fall 2015 Remnants of June Flood (erosion and
mud lawn washed away)
75
Sept 13
76
Bluebird Park
77
Fall at its best
78
First Bluebirds
79
Gazebo
80
August 2012
81
Aug Sept 2012
82
Shelbys First Visit to Vet
83
Shelby Christmas 2012
Write a Comment
User Comments (0)
About PowerShow.com