Title: Simmons Cabin
1- Simmons Cabin - Moved in May 28, 2015CoO
received August 18, 2015
2Outside Bedroom Door
3Front Entrance with Full Moon
4W Danby Entrance before Driveway - 2008
5House Site - 1st Excavation Attempt for Driveway
6Driveway Entrance Culvert Work
7A lot of Driveway Work!
8Driveway Coming Along
9(No Transcript)
10Excavation for Basement July 2014
11Superior Foundation Basement (9)
12Basement Foundation ready to backfill
13Basement Ceiling
14Trusses
15Northeast View from future greatroom
16First Logs Are Up!
17Logs w/window framing side and front
18Logs w/window framing side and back
19Logs were cut on site
20So much clay and sand
21Log stacks cut for window spaces
22Inspector on site
23Indoor Outdoor Work Zones
24First Floor Logs Complete
25Gables ready to attach
26Kitchen Nook, Gables Roofing On
27Cabin North Side Greatroom/Kitchen/Nook
28Kitchen Nook Bench Table
29Here Truss, There Truss, Everywhere a Truss Truss
30Up High!
31East Front/South Side/Southwest Back Deckready
for Shingles.
32Both Shed Porches w/ TG Soffit Love it!!
33Shingles finished on Roof East Back Deck
34Shingles Finished on Roof - West Front Porch
35TG Soffit on Gable Overhangs
36Inside Trusses Up, Up, and Away!
37Great View When Finished
38Family Outing in Sept 14
39Ready for Gable Siding Soffits West Deck -
9/20/14
40Ready for Gable Siding Soffits East Deck -
9/20/14
41(No Transcript)
42Duralife Decking better than Trex and greener
materials
43Ready for Decking, Doors, More Inside Work
44(No Transcript)
45(No Transcript)
46Front Entrance - Porch Overhang and inside foyer
behind plastic
47Front Wall Entrance Greatroom Area
48Framing Between Master BR Kitchen
491st Pic - Front Entry, ½ Entry, Pantry Frame2nd
Pic Greatroom Door to Deck and Nook
50Greatroom insulation
51Greatroom Gable w/start of TG, Fan Fixture
52East Gable and Ceiling gables required foam
insulation for greater R value (a changed
requirement by code official and performed by a
separate contractor)
53Greatroom East Gable before and after TG
54Greatroom and Remote Fans
55Stairway Construction (4 x 10 opening)
56Stairway Completed
57½ Bath Corner Toilet
58Master BR (inside blind mounts)
59Masterbath
60Front Entrance Foyer, Light, Hall Bench
61Framing of Island and Cabinets
62Hood Fan
63Molding Almost Complete
64Tile on Wall
65Cut out decorative copper pieces to match top
w/bottom strip
66Kitchen Island Wine Holder (extra length for
inside chair)
67Granite Supports on Island - Cardboard on New
Flooring and major work area.ugh!
68Kitchen Island Countertop and Sink
69Kitchen Island Backsplash Tile
70Rt 34/96 Municipal Water and Utility Trench
71Geo Zones and Water Pressure Pump
72Water at Long Last!
73Garage Pad Mar 2016
74Fall 2015 Remnants of June Flood (erosion and