Tega Corporate Presentation - PowerPoint PPT Presentation

About This Presentation
Title:

Tega Corporate Presentation

Description:

Headquartered in Kolkata, Tega was promoted in 1976 by the Mohanka family in a technical & financial collaboration with Skega AB, Sweden; In 1998, Mohanka family acquired 100% equity stake in the Company. – PowerPoint PPT presentation

Number of Views:25
Updated: 14 December 2016
Slides: 29
Provided by: Tegaindustry

less

Transcript and Presenter's Notes

Title: Tega Corporate Presentation


1
Tega Industries
  • A Global Wear Solution Provider

2
Company Overview
3
Introduction to Tega
  • Headquartered in Kolkata, Tega was promoted in
    1976 by the Mohanka family in a technical
    financial collaboration with Skega AB, Sweden In
    1998, Mohanka family acquired 100 equity stake
    in the Company
  • The Company specializes in manufacturing and
    distribution
  • Wear resistant lining components required for
    grinding, sizing and beneficiation of minerals
  • Downstream equipment such as hydro-cyclones and
    flotation columns, fluid transportation and
    filtration systems used in mineral processing,
    bulk material handling and slurry transportation
    industry

4
Facilities All Over the World
  • Over the years, the Company has set up a large
    export market for its products in more than 72
    countries
  • It has 3 manufacturing plants in India,1 in South
    Africa, 2 in Chile and 1 in Australia supported
    by a highly experienced RD team
  • 32 patents worldwide

5
A Truly Global Workforce
  • A truly multinational with sales and distribution
    network around 16 countries and 1600 employees
    worldwide

6
Group of Companies
7
Significant Partnerships
  • Tega has developed lasting and rewarding
    partnerships in mining and processing operations
    worldwide. We believe in long term mutually
    beneficial relationships and strive to build
    partnerships.


8
CSR Activities
  • Bhavishya Asha A scholarship programme for the
    meritorious
  • AHEAD a model school for mentally challenged
    and autistic children
  • Tega Industrial Technical Training Center (TITTC)
    aims to improve skills of shop floor workers
  • School for Civil Construction Workers children
  • Integrated village development programmes

9
Our Philosophy
10
VisionCommitted to engineering flawless
solutions that enrich the future of mining  
Mission To distinguish ourselves in providing
lasting solutions to the complex problems of
material handling, wear and separation of ores
found in mining and mineral processing
industries  
11
What is Partnerships in Practice ?
  •  For 40 years at Tega we have lived by this
    philosophy.
  • To work together with our clients.
  • To understand complex problems, engineer flawless
    solutions and deliver them on time.
  • To leave a strong impact on the productivity and
    performance of more than 700 esteemed clients
    across the world.
  • Because we believe Working Together Can Create
    Wonders

12
The 4 Step Process
  • At Tega, we create value for our customers
    globally, by bringing them innovative
    technologies, products and services. We have a
    simple 4 step process of creating delivering
    value
  • Step 1 - Audit We study the process and
    operational parameters along with design of the
    existing equipment
  • Step 2 - Analysis We analyse the data collected
    in the Audit stage, using our proprietary
    software programmes like DEM, FEM ,CFD etc
  • Step 3 - Customised Solution Our RD and
    engineering excellence use the Analysis as an
    input to unearth a trailblazing, innovative,
    flawless solution.
  • Step 4 - Solution Delivery We provide on-time
    delivery and installation, after sales support
    and training to customer personnel.

13
Adding Edge to Partnerships
  • Engineering Expertise
  • Leading Edge R D
  • Superior Quality
  • Total Solution Approach
  • Knowledge , People Expertise
  • Proactive
  • Unmatched Services

14
Solution Driven Approach
  • Capacity Enhancement
  • Optimized operation
  • Installation Time Reduction
  • Liner Life Increase
  • Mill Hydrocyclone
  • Customer Needs
  • Enhanced Performance
  • Maximizing Asset Life
  • Less Downtime
  • Increasing Profit
  • Tega
  • R D
  • Engineering
  • Product
  • Service
  • Ownership
  • Improvement in Screening Efficiency
  • Lifetime Optimization
  • Downtime Reduction
  • Smart Wear Management
  • Screen Trommel
  • Efficient Material Transfer
  • Spillage and Maintenance Free Operation
    Optimization
  • Reduced Degeneration
  • Bulk Storage and Transfer Point
  • Efficient Material Transfer
  • Spillage Free
  • Maintenance Free
  • Power Optimization
  • Conveyor

15
Our Engineering Excellence
16
Engineering Excellence
Product Design
17
Engineering Activities
  • Design Calculations
  • Simulations
  • DEM
  • FEM
  • CFD
  • Prototyping/Testing

18
Basic Design Calculation in Mill
19
DEM Application in WP
EXISTING
Avg. K.E 1.59 J
Avg. K.E 1.59 J
PROPOSAL
Proposed modification at this zone
Avg. K.E 1.56 J
Avg. K.E 1.56 J
20
FEM Applications in Mill
38
21
CFD Application in Hydrocyclone
Trajectories of particle sizes starting 20
microns range are showing higher residence time
than the 10 and 15 microns, depicting the cut
size of the design lies above 20 micron.
22
Testing
Lifter Bar Testing
23
Product Range
24
Product Range
25
Wear Products
26
Separation
27
Conveyance
Fri Flo
28
  • Thank You
Write a Comment
User Comments (0)
About PowerShow.com