Title: Perfect Interior Concrete Flooring
1www.Ltfsolutions.co.in
Power Troweling Aid and Curing Agent Its like
having an extra
Features Advantage Lythic DAY1 offers a
multitude of advanced features and benefits for
freshly placed concrete, and provides long-term
high performance properties to treated concrete
surfaces.
finisher on the job.
- (a)Finishing Aid
- Lubricates for more efficient closing of surface
- Speeds finishing
- Extends surface workability time by 15 to 30
minutes - Helps finishing under hot, dry, sunny windy
conditions - Reduces operator fatigue and trowel wear
- Easier application of shake-on hardeners for
concrete with high air content / low bleed water
environments
- Reduces efflorescence on both colored standard
concrete
- Minimizes checking, crazing scaling
- Decreases potential for alkali silica reaction -
(ASR)
- (e)Curling Reduction
- Reduces potential for slab curling
- Use It For
- ALL trowelable surfaces
- Interior exterior
- From warehouses to parking decks
- (b)Concrete Curing
- Reduces Water Vapor Transmission Per ASTM F1869 -
(MVER) - Mitigates Volume of Water Vapors Per ASTM D 4263
- (c) Hardening Densification
- Increases abrasion resistance
- Creates a denser, less permeable surface for
resistance to liquid penetration, staining - Increases impact resistance
- Increases surface compressive strength
approximately 20 - 30
Dont Lose The Slab
Finish better and easier with DAY1 from Lythic
Solutions. This
new type of troweling aid meets your most
different finishing
challenges.
- Extends finishing time from 15 to 45 minutes
- Lubricates trowel - less wear on blades, less
fatigue for
operator
- (d)Efflorescence Surface Defects
- Colloidal silica chemical reaction reduces
Ca(OH)2 migration
- Slows surface drying - closes better, finishing
smoother
2Better Concrete Happens on DAY1
DAY1 Troweling Aid and Curing Agent improves
concrete during finishing.
- Application is simple
- Spray on a modest amount and trowel into surface
- The power-trowel may speed up, because
drag on the blades is reduced by DAY1 - It begins reacting instantly, and can slow
down the drying effects of wind, heat, low
humidity and similar adverse - conditions
Contractors describe DAY1 like having an extra
finisher on the job. TESTIMONIAL Testing at
Middle Tennessee State University (MTSU) of DAY1
as a Troweling Aid Curing Agent RESULTS The
concrete with DAY1 was finished last, yet it came
out the best, and I believed I could have even
worked on it longer if I had needed to. There was
very little resistance, and the concrete was
still workable. I was able to use the power
trowel with a lower pitch. All holes and low
spots filled easily. There was no tearing of the
fine aggregates, so the slab was easier to get on
earlier and stay later without issues. I believed
I could have troweled DAY1 sections only three
times instead of four with the same results. And
I could have waited longer before final
finish if I wished, but that was
unnecessary. Ed Kowalski, Quality Concrete
Conscapes
Improve Concrete During Finishing Now, you can
improve the quality of your concrete right from
the beginning. DAY1 gets troweled in during
finishing and becomes a permanent part of the
concrete, strengthening the slab and reducing
water vapor transmission. DAY1 helps cure
the slab, like a liquid membrane-forming
curing compound, even though DAY1 does not form
a membrane, lm or residue, and there is
nothing to remove afterwards. DAY1 closes the
pore structure near the surface, so water stays
in the concrete longer, allowing for improved
curing. To give your customers better concrete,
DAY1 should be part of every troweled slab.
Dont Add Water With DAY1, you dont need to
bless the slab with excess water to keep it
workable. Water weakens the concrete and causes
dusting. DAY1 strengthens the surface and
prevents dusting.
Details DAY1 is shipped as a concentrate to
reduce environmental impacts and shipping costs.
It's easily mixed with water in a 41 ratio.
Spray on and continue to finish the slab
normally, but with less sweat. Working solution
covers for Finishing Aid 6-17 m2 / L
Performance Concrete ..6-7.5 m2 / L
Finished with Lythics DAY1 Finished with water
Important Note Lythic Day 1 is designed to be
floated or trowelled into the concrete surface.
DO NOT Spray on the
Note When applying multiple times or using
in combination with other colloidal silica
treatments, total combined applications should
not exceed (3.7L/m2) NEXT
Concrete surface after troweling. Lythic Day1 is
NOT a film forming cure for concrete.
For Application
For materiel Information
GENERATION C O N C R E T E S Y S T E M S
Next Generation Concrete Systems Pvt. Ltd. S-9,
Second Floor, Malik Buildcon Plaza-II, Pocket -
5, Plot No.6, Sector- 12, Dwarka, New Delhi -
110075 M 91 84 708 54405 T 011 42804024 E
info_at_ngcs.co.in W www.ngcs.co.in
Lamba Techno Flooring Solutions Pvt. Ltd. Q-27,
Phase-I, Extn. New Palam Vihar, Gurgaon M 91
97 178 54400, 84 708 54401 E LTFSPL_at_gmail.com,
info_at_Ltfsolutions.co.in W www.Ltfsolutions.co.in
Branch Offices Delhi Haryana Rajasthan
Karnataka Maharashtra Gujrat
3For making Jointless floor we have adopted large
area construction method as against conventional
long strip casting, by this method large floors
up to several thousand square metres in area was
laid in a continuous operation. Fixed forms were
used only at the edges of the construction at
intervals of typically 30 X 24 m. Concrete was
discharged into the floor area and spread by
laser Screed machines. Levels were controlled
both manually using a target staff in conjunction
with a laser level transmitter and by direct
control of laser-guided spreading machines
constructing free-movement areas,
4By definition Jointless floors are floors
constructed in large panels typically 50 m square
without intermediate joints.
5http//ltfsolutions.co.in/