DEVELOP A STAKEHOLDER MANAGEMENT PLAN / TUTORIALOUTLET DOT COM

Description:

develop a stakeholder management plan for a c o n s t r u c t i o n project in the centre of Sligo Town. The project comprises of the demolition of existing sheds and outbuildings and erection of a five-storey mixed use – PowerPoint PPT presentation

Number of Views:14
Slides: 4
Provided by: albert0053

less

Transcript and Presenter's Notes

Title: DEVELOP A STAKEHOLDER MANAGEMENT PLAN / TUTORIALOUTLET DOT COM


1
DEVELOP A STAKEHOLDER MANAGEMENT PLAN /
TUTORIALOUTLET DOT COM
2
DEVELOP A STAKEHOLDER MANAGEMENT PLAN /
TUTORIALOUTLET DOT COM
  • Develop a stakeholder management plan 
  • FOR MORE CLASSES VISIT
  • www.tutorialoutlet.com
  • develop a stakeholder management plan for a c o n
    s t r u c t i o n project in the centre of Sligo
    Town. The project comprises of the demolition of
    existing sheds and outbuildings and erection of a
    five-storey mixed use development to the rear of
    an existing listed building. It is proposed that
    the extension will cover the entire site area.
    (See enclosed maps). The existing listed building
    is three-storey in height and is semi-detached.
    All maps are orientated to north (being the top)
    and south (being the bottom). To the south is an
    existing Dunnes Stores shop and car-park. To the
    east (right) is the rear yard and outbuildings of
    the house next door. The site is bounded by
    public roads to the north and west. On the
    opposite side of the road to the west is a bus
    Eireann depot. Existing offices (dentist,
    solicitor, etc) are located to the north of the
    site.The task consists of two stages the
    planning stage and the construction stage. In
    this example we will presume we eventually get
    through the planning stage Identify ALL possible
    project stakeholders for both stages Plot all
    stakeholders on an Interest v. Influence
    graph/table Analyse the findings and discuss the
    risks proposed by each stakeholder to the success
    of the project Formulate a brief Stakeholder
    Management Plan (including a preliminary
    communication plan for each)

3
DEVELOP A STAKEHOLDER MANAGEMENT PLAN /
TUTORIALOUTLET DOT COM