2Water-proofing
- Building water-proofing is a process which is
designed to prevent water from penetrating a
building. - Usually extensive waterproofing measures are
added to a building at the time of construction,
to provide moisture control from the start - Waterproofing may also be done after a building
is built, to address problems as they emerge or
as part of a building retrofit. - Water proofing is done in various parts of the
building.
3Water proofing is done in various parts of the
buildingwhich include 1.WC 2.Bathrooms 3.Terrace
4.Basement 5.Swimming pools 6.underground
Ducts. 7.under ground and overhead water
tanks Water-proofing maintains the appearance of
the building and increases the life of the
structure.
4Terrace Waterproofing
5Procedure For Terrace Waterproofing
SURFACE PREPARATION
- Rake the construction joints to remove loose
concrete from the joint. - Drill holes and fixing nozzles in construction
Joints and patching the joint with cement sand
mortar. - Clean the RCC Substrate of all oil, grease and
loosely adhering particles.
6- Spread cement mortar in 14 along with
water-proofing compound over the - brick bat coba.
- Press the cement mortar with a ruler of length of
2m. - Level the surface with a wooden float, keeping
25mm thickness. - Apply thick cement slurry over the levelled
surface, along with the water- proofing compound
for a smooth finish. - Polish the surface with metal float
- Make vertical and horizontal lines at an intervel
of 300mmX300mm, using a cotton line dori of
minimum 3mm thick so as to avoid cracking of the
top layer. - Clean and cure the final coat for 21days with
atleast 150mm water standing - on the water proofing.
FFinal coat for terrace water-proofing
- Spread cement mortar in 14 along with
water-proofing compound over the - brick bat coba.
- Press the cement mortar with a ruler of length of
2m. - Level the surface with a wooden float, keeping
25mm thickness. - Apply thick cement slurry over the levelled
surface, along with the water- proofing compound
for a smooth finish. - Polish the surface with metal float
- Make vertical and horizontal lines at an intervel
of 300mmX300mm, using a cotton line dori of
minimum 3mm thick so as to avoid cracking of the
top layer. - Clean and cure the final coat for 21days with
atleast 150mm water standing - on the water proofing.
7BRICK BAT COBA TREATMENT
- All existing treatment, coatings on roof slab top
is to be removed and surface cleaned by hard wire
brush and washed with water. - The surface should be free from any oil, grease,
dust etc. - Remedial measured by provided to all structural
cracks.
8REACH US
Address C/o Raja Raja Group of
Companies 1/12. Shashtri Nagar, 90 Feet Road, Opp
Pant Nagar Police Station Corner, Ghatkopar (E),
Mumbai - 400 075. CALL US t 022-250 80
101 EMAIL US mail_at_raja-n-raja.com Website http
//raja-n-raja.com/
9Thank You!