informatica itm training - PowerPoint PPT Presentation

About This Presentation
Title:

informatica itm training

Description:

global online training's provides best informatica ilm training by top most trainers. – PowerPoint PPT presentation

Number of Views:20
Slides: 11
Provided by: global6969
Tags:

less

Transcript and Presenter's Notes

Title: informatica itm training


1
Informatica ILM TRAINING
For More Details Email info_at_globalonlinetrain
ings.com IND 914060501418 UK 44(0) 203 371 00
77 What's app 1 516 8586242 Visit
www.globalonlinetrainings.com

2
GLOBAL ONLINE TRAININGS
  • Global Online Trainings has proven track record
    of delivering successful trainings on various
    technologies globally to improve the bottom line
    of the business for competencies of the corporate
    and careers growth of the individuals
    consultants.
  • We are providing best online training center that
    provides you training on all modules of SAP,
    Oracle, SAS, PHP and Testing Tools, Data
    Warehousing, PLSQL and SQL. our professional and
    efficient team of trainers brings out their years
    of expertise to let their students understand the
    complexities of the technology that they are
    training on.

3
  • Global Online Trainings provide online training
    through virtual classes but at no time during our
    training program will you feel that you are not
    connected to us physically.
  • Global Online Trainings subject matters experts
    will provide you online tutorials in such an
    engaging and engrossing way that you will never
    feel you are not in a physical classroom.
  • Global Online Trainings application sharing,
    remote desktop support, chat to clear doubts,
    virtual white board sharing and question/answer
    sessions are some of our prominent features that
    truly sets us apart from other online training
    provider.

4
ILM
  • ILM stands for Information Lifecycle Management,
    in business point of view, it stores capacity
    limited, in this data is unlimited and ILM is a
    tool and processes.
  • Implementing ILM requires a series of complex and
    time consuming steps. The process begins with a
    laborious inventory of all of data and IT
    administrator annually completes this inventory
    which can take at least two to three weeks if not
    longer following inventory multiple meetings
    between business and IT are required to establish
    the business priorities of different kinds of
    data.

5
  • ILM Enterprise Data Manager (EDM)
  • EDM is a tool provided by ILM in order to mine
    the data and also it used to define the business
    rules on the data. That is going to be archived
    from the source into the target.
  • ILM Data Archive
  • ILM data archive tool is used to archive none
    frequently used production data to other online
    data base or to optimize file system to improve
    the performance and for better space management
    of the production data base.

6
Informatica ILM Smart Partitioning Manager
  • Installing Informatica ILM smart partitioning
    manager based on an Oracle data base instance.
  • After have received the executable from
    Informatica go ahead run the installer.
  • If running the installer on windows and make sure
    to run its administer the administrator
    privileges, will go ahead and click on the
    executable and select run as administrator.

7
  • This will to prevent any conflicting issues with
    the windows sign securities.
  • Informatica data archive and this window there
    are three install options that we could choose
    from typical we will go ahead and solve all the
    features including jobs the Meta data and the
    country.
  • The second option the client only option will
    only install the code tree of the smart
    positioning manager on the environment running
    the installation from and third option install
    all policy dimensions.

8
ILM FILE ARCHIVE SERVICE (FAS)
  • First step is to create an ODBC DSN in the ODBC
    administrator. Go to the system DSN and if have
    to create a new DSN, you would add the DSN.
  • The created DSN have different parameters they
    are, the data source name is any name that could
    use to identify the archive folder them the
    server on which the ILM file server is running
    the port number on which the ODBC is running and
    the user name and password and by default the
    sequel parts of the sequel 92 and,
  • When click on update it would look for the
    archive folder and going to select the archive
    folder that are going to create a report against
    and then say ok create the DSN.

9
  • Using this DSN in high report designer to create
    a data source connection. So the first step to
    create a data source connection would use a data
    base JDBC connection and click next to select the
    driver as the JDBC ODBC Bridge and this is the
    DSN name that is specified in the ODBC DSN which
    should be arc DSN.
  • So here specify a RC DSN and specify the user
    name and password. When test the connection,
    connection successful so specify any name here
    and save the data source.

10
THANK YOU!
www.globalonlinetrainings.comm
Write a Comment
User Comments (0)
About PowerShow.com