Passcert new updated Dell EMC E22-285 dumps , you can use online Passcert latest Dell EMC E22-285 dumps for your help and support in your E22-285 test. We regularly updated Dell EMC E22-285 dumps to help you save your time and money both and you can get good marks in your E22-285 certification.With Dell EMC E22-285 dumps you can attain your goals very easily by passing exams. – PowerPoint PPT presentation

Number of Views:28

less

Transcript and Presenter's Notes

Title: VxRail Appliance 4.x E22-285 dumps free


1
EMC E22-285
  • VxRail Appliance 4.x Deployment and
    Implementation Exam

https//www.passcert.com/E22-285.html
2
  • E22-285 Sample Questions From Real Test

Back to school
https//www.passcert.com/E22-285.html
3
  • 1. Which user provided block of IP addresses to
    the VxRail initialization wizard may contain
    non-contiguous addresses?
  • A. VMware Virtual SAN
  • B. ESXi host
  • C. vSphere vMotion
  • D. NTP Servers
  • Answer D

https//www.passcert.com/E22-285.html
4
  • 2. A company wants to deploy VxRail on V Series
    nodes as a proof-of-concept (POC). Only one Top
    of Rack (ToR) switch has been provided for the
    POC.
  • What is the Dell EMC best practice recommendation
    in this situation?
  • A. Connect the first host NIC to the ToR switch.
    Leave the second host NIC un-cabled.
  • B. Connect each host NIC to a port on a different
    switch packet buffer bank on the ToRswitch.
    Balance the ports across two packet buffer banks.
  • C. Inform the company that the POC cannot proceed
    without a second ToR switch.
  • D. Connect the first host NIC to the TOR switch.
    Daisy chain the second NIC between hosts.
  • Answer B

https//www.passcert.com/E22-285.html
5
  • 3. When preparing for a VxRail deployment, which
    components require forward and reserve DNS
    records?
  • A. ESXi hosts, vRealize Log Insight, and Platform
    Services Controller
  • B. Platform Services Controller. vCenter, and
    ESRS/VE
  • C. ESXi hosts, vCenter, and vRealize Operations
  • D. ESXi Hosts, vCenter, and ESRS/VE
  • Answer A

https//www.passcert.com/E22-285.html
6
  • 4. What is the correct command to restart the
    Loudmouth process on a VxRail node?
  • A. /usr/lib/vmware-loudmouth/bin/loudmouthc
    restart
  • B. systemctl restart vmware-loudmouth
  • C. /etc/init.d/loudmouth restart
  • D. /sbin/service loudmouth restart
  • Answer B

https//www.passcert.com/E22-285.html
7
  • 5. When adding a VxRail node the validation
    fails.
  • What could be the cause of this problem?
  • A. IPv6 multicasting is not enabled
  • B. Only one network interface online
  • C. Time on the node was not set correctly
  • D. DNS record was not created
  • Answer B

https//www.passcert.com/E22-285.html
8
  • 6. You are asked to cable up a VxRail G Series
    cluster to a redundant pair of 1/10G switches.
  • What is the cabling best practice for this
    configuration?
  • A. Cable ports 1 and 2 to oneswitch. Cable ports
    3 and 4 to the other switch.
  • B. Cable ports 1 and 2 to one switch. Cable ports
    3 and 4 to the other switch. Cable BMC from node
    1 and 2 to one switch. Cable BMC from node 3 and
    4 to the other switch.
  • C. Cable ports 1 and 3 to one switch. Cable ports
    2 and 4 to the other switch.
  • D. Cable ports 1 and 3 to one switch. Cable ports
    2 and 4 to the other switch. Cable BMC from node
    1 and 3 to one switch. Cable BMC from node 2 and
    4 to the other switch.
  • Answer D

https//www.passcert.com/E22-285.html
9
  • 7. A company is in the process of configuring
    their Top of Rack (ToR) switches as a single rack
    that replicates to a secondary data center with
    vSphere Replication.
  • What is a consideration for this configuration?
  • A. IPv6 and IPv4 multi-cast should be layer-3
    routed between data centers
  • B. IPv6 and IPv4 multi-cast should span the
    entire network in each data center
  • C. IPv6 and IPv4 multi-cast traffic does not need
    to leave the ToR switches
  • D. IPv6 and IPv4 multi-cast traffic should span
    layer-2 between data centers
  • Answer B

https//www.passcert.com/E22-285.html
10
  • 8. In a VxRail external vCenter deployment, which
    component(s) are automatically licensed?
  • A. vCenter only
  • B. vCenter and vSAN
  • C. None
  • D. vSAN only
  • Answer B

https//www.passcert.com/E22-285.html
11
  • 9. When using vSphere Web Client, what is the
    source of information that can help validate good
    VxRail system post-deployment status?
  • A. MARVIN-Virtual-SAN-Cluster gt Monitor gt Health
    Logical View
  • B. MARVIN-Virtual-SAN-Cluster gt Monitor gt Virtual
    SAN gt Health
  • C. Last Heartbeat, Last Configuration Sent,
    Network Environment Settings, Cluster Monitor
  • D. System Diagnostic, Events, Health Logical
    View, Health Physical View, Log Bundle
  • Answer D

https//www.passcert.com/E22-285.html
12
  • 10. A planned VxRail deployment will use an
    External vCenter Server and syslog server.
  • Which ping connectivity tests should succeed and
    which should fail before the deployment?
  • A. Succeed ESXi hosts and syslogFail VxRail
    Manager and vCenter
  • B. Succeed VxRail Manager and ESXi hostsFail
    vCenter and syslog server
  • C. Succeed vCenter and syslog serverFail VxRail
    Manager and ESXi hosts
  • D. Succeed VxRail Manager and syslogFail
    vCenter and ESXi hosts
  • Answer A

https//www.passcert.com/E22-285.html
13
PPT????www.1ppt.com/moban/
??PPT??www.1ppt.com/hangye/ ??PPT??www.1ppt.com
/jieri/ PPT????www.1ppt.com/sucai/ PPT?
???www.1ppt.com/beijing/ PPT????www.1ppt.co
m/tubiao/ ??PPT??www.1ppt.com/xiazai/
PPT?? www.1ppt.com/powerpoint/ Word??
www.1ppt.com/word/
Excel??www.1ppt.com/excel/ ????www.1ppt.com/zi
liao/ PPT????www.1ppt.com/kejian/
????www.1ppt.com/fanwen/
????www.1ppt.com/shiti/ ????www.1ppt.com/jiaoa
n/
https//www.passcert.com/E22-285.html
Write a Comment