Title: VxRail Appliance 4.x E22-285 dumps free
1EMC E22-285
- VxRail Appliance 4.x Deployment and
Implementation Exam
https//www.passcert.com/E22-285.html
2- E22-285 Sample Questions From Real Test
Back to school
https//www.passcert.com/E22-285.html
3- 1. Which user provided block of IP addresses to
the VxRail initialization wizard may contain
non-contiguous addresses? - A. VMware Virtual SAN
- B. ESXi host
- C. vSphere vMotion
- D. NTP Servers
- Answer D
https//www.passcert.com/E22-285.html
4- 2. A company wants to deploy VxRail on V Series
nodes as a proof-of-concept (POC). Only one Top
of Rack (ToR) switch has been provided for the
POC. - What is the Dell EMC best practice recommendation
in this situation? - A. Connect the first host NIC to the ToR switch.
Leave the second host NIC un-cabled. - B. Connect each host NIC to a port on a different
switch packet buffer bank on the ToRswitch.
Balance the ports across two packet buffer banks. - C. Inform the company that the POC cannot proceed
without a second ToR switch. - D. Connect the first host NIC to the TOR switch.
Daisy chain the second NIC between hosts. - Answer B
https//www.passcert.com/E22-285.html
5- 3. When preparing for a VxRail deployment, which
components require forward and reserve DNS
records? - A. ESXi hosts, vRealize Log Insight, and Platform
Services Controller - B. Platform Services Controller. vCenter, and
ESRS/VE - C. ESXi hosts, vCenter, and vRealize Operations
- D. ESXi Hosts, vCenter, and ESRS/VE
- Answer A
https//www.passcert.com/E22-285.html
6- 4. What is the correct command to restart the
Loudmouth process on a VxRail node? - A. /usr/lib/vmware-loudmouth/bin/loudmouthc
restart - B. systemctl restart vmware-loudmouth
- C. /etc/init.d/loudmouth restart
- D. /sbin/service loudmouth restart
- Answer B
https//www.passcert.com/E22-285.html
7- 5. When adding a VxRail node the validation
fails. - What could be the cause of this problem?
- A. IPv6 multicasting is not enabled
- B. Only one network interface online
- C. Time on the node was not set correctly
- D. DNS record was not created
- Answer B
https//www.passcert.com/E22-285.html
8- 6. You are asked to cable up a VxRail G Series
cluster to a redundant pair of 1/10G switches. - What is the cabling best practice for this
configuration? - A. Cable ports 1 and 2 to oneswitch. Cable ports
3 and 4 to the other switch. - B. Cable ports 1 and 2 to one switch. Cable ports
3 and 4 to the other switch. Cable BMC from node
1 and 2 to one switch. Cable BMC from node 3 and
4 to the other switch. - C. Cable ports 1 and 3 to one switch. Cable ports
2 and 4 to the other switch. - D. Cable ports 1 and 3 to one switch. Cable ports
2 and 4 to the other switch. Cable BMC from node
1 and 3 to one switch. Cable BMC from node 2 and
4 to the other switch. - Answer D
https//www.passcert.com/E22-285.html
9- 7. A company is in the process of configuring
their Top of Rack (ToR) switches as a single rack
that replicates to a secondary data center with
vSphere Replication. - What is a consideration for this configuration?
- A. IPv6 and IPv4 multi-cast should be layer-3
routed between data centers - B. IPv6 and IPv4 multi-cast should span the
entire network in each data center - C. IPv6 and IPv4 multi-cast traffic does not need
to leave the ToR switches - D. IPv6 and IPv4 multi-cast traffic should span
layer-2 between data centers - Answer B
https//www.passcert.com/E22-285.html
10- 8. In a VxRail external vCenter deployment, which
component(s) are automatically licensed? - A. vCenter only
- B. vCenter and vSAN
- C. None
- D. vSAN only
- Answer B
https//www.passcert.com/E22-285.html
11- 9. When using vSphere Web Client, what is the
source of information that can help validate good
VxRail system post-deployment status? - A. MARVIN-Virtual-SAN-Cluster gt Monitor gt Health
Logical View - B. MARVIN-Virtual-SAN-Cluster gt Monitor gt Virtual
SAN gt Health - C. Last Heartbeat, Last Configuration Sent,
Network Environment Settings, Cluster Monitor - D. System Diagnostic, Events, Health Logical
View, Health Physical View, Log Bundle - Answer D
https//www.passcert.com/E22-285.html
12- 10. A planned VxRail deployment will use an
External vCenter Server and syslog server. - Which ping connectivity tests should succeed and
which should fail before the deployment? - A. Succeed ESXi hosts and syslogFail VxRail
Manager and vCenter - B. Succeed VxRail Manager and ESXi hostsFail
vCenter and syslog server - C. Succeed vCenter and syslog serverFail VxRail
Manager and ESXi hosts - D. Succeed VxRail Manager and syslogFail
vCenter and ESXi hosts - Answer A
https//www.passcert.com/E22-285.html
13PPT????www.1ppt.com/moban/
??PPT??www.1ppt.com/hangye/ ??PPT??www.1ppt.com
/jieri/ PPT????www.1ppt.com/sucai/ PPT?
???www.1ppt.com/beijing/ PPT????www.1ppt.co
m/tubiao/ ??PPT??www.1ppt.com/xiazai/
PPT?? www.1ppt.com/powerpoint/ Word??
www.1ppt.com/word/
Excel??www.1ppt.com/excel/ ????www.1ppt.com/zi
liao/ PPT????www.1ppt.com/kejian/
????www.1ppt.com/fanwen/
????www.1ppt.com/shiti/ ????www.1ppt.com/jiaoa
n/
https//www.passcert.com/E22-285.html