Title: Storm Drain Inlet Protection Calgary
1Storm Drain Inlet Protection Calgary
2About Us
Since 2004, Alberta Sediment and Erosion Control
has provided service excellence on construction
projects of all sizes. We are an Alberta born and
bred company, and service sites from Calgary to
Ft. McMurray, including Red Deer, Leduc,
Lethbridge, Airdrie, Cochrane, Okotokes and
Edmonton. Quality is our key value. Our lean
operational model keeps costs low for our
clients, while we provide ongoing support
throughout the construction process without
hidden costs.
3Our Mission
We do it right the first time. We save our
clients time and money by ensuring that their job
site is fully compliant. Weve got your back.
The Team
The team at Alberta Sediment and Erosion Control
has over 30 years combined experience. Everyone
who steps on a jobsite is a full certified
Inspector of Sediment and Erosion Control. We
combine a construction background with highly
specialized erosion control knowledge and
certification to provide top tier service to
every client.
4Our Services
Our service lineup is the most comprehensive in
our industry. We pride ourselves on offering a
closed-loop lineup of services which allows you
to use one company for everything. From
consultation and design development to
implementation and management, AESC is here for
all your erosion and sediment control needs.
52 BMP Series Preserving Existing Vegetation
When you consider that the natural vegetation
that covers the site where construction is to
commence is 98 more effective compared to
stripping away the vegetation, you can see why
keeping the current vegetation in place is the
preferred course of action. Existing vegetation
is arguably the most secure type of soil
protection around, so its preservation should be
of the highest order.
61 BMP Series Construction Scheduling Phasing
The better you plan your scheduling in terms of
construction, the better you can control the
erosive elements of wind, water, run-off, and the
tracking of vehicles. The schedule for
construction should be a written plan that does
the following
7The schedule for construction should be a written
plan that does the following
Present Order of All Major Land-Disturbing
Activities Identifies Major Construction
Soil Distribution Activities Proper Time
Allotment for Completion of Each Activity
Present Erosion and Sediment Control Practices
for Each Activity
8Proper Site Assessment for Erosion and Sediment
Control
When a property is designated to be the site of
construction, the first step is a preliminary
assessment to evaluate the erosion potential of
the area. This means for erosion and sediment
control purposes, the site must be evaluated to
determine what potential issues may occur, so
that the proper control methods can be put into
place. What follows is a step-by-step procedure
to evaluate construction sites for erosion and
sediment control measures.
9Comprehensive Erosion Control
- Silt Fence Installations
- Hydroseeding/Hydromulching
- Storm Drain Inlet Protection Installation and
Maintenance - Street and Sidewalk Sweeping
- Sediment Log Installation
- Sediment Traps/Rock Check Dams
- Soil Stabilization/V-ditch/berms with Check Dams
- Erosion Control Blankets/Silpat Mats
- Turf Reinforcement Matting
- Gravel Pad Installation
- Dewatering/Water Pumping
- Turbidity Testing
10Contact Us
2032 6 Street NECalgary, Alberta T2E 3Z1Tel
(403) 460-0022 Cell (403) 618-3177Fax (403)
474-5002E-mail smerchant_at_aesc-ltd.com
11Thank You For Watching
Visit Our Website
https//aesc-ltd.com/blog/