5 Steps To Installing A High-Velocity HVAC System - PowerPoint PPT Presentation

About This Presentation
Title:

5 Steps To Installing A High-Velocity HVAC System

Description:

This presentation about steps to installing HVAC system if you want's to read it thoroughly open it and read it – PowerPoint PPT presentation

Number of Views:12
Slides: 12
Provided by: jennifersmith
Tags:

less

Transcript and Presenter's Notes

Title: 5 Steps To Installing A High-Velocity HVAC System


1
5 Steps To Installing A High-Velocity HVAC System
Written By Jennifer Smith
Date 4-july-2019
2
Context
  • What is HVAC System
  • 5 Steps To Installing A High-Velocity HVAC System
  • Graphics
  • Contact Us

3
What is HVAC System
  • The initials HVAC stand for Space heating,
    Freshening and Air Preparing. They describe the
    functions of an HVAC system. This mechanical
    systems enterprise is primarily an attempt to
    take control of the conservational conditions
    inside the interplanetary you work.

4
5 Steps To Installing A High-Velocity HVAC System
  • Calculate The Load.
  • Find A Suitable Location For The Fan Coil Unit
  • Construct A Simple Platform
  • Connect Supply Tubing And Plenum Duct
  • Install Supply Tubing

5
  1. Calculate The Load.
  • The initial step is to complete a heap
    computation. SpacePak gives a "Kwik Way"
    measuring structure that is intended to precisely
    give a room-by-room load for the high-speed
    framework. Additionally offered is a "Source" CD
    including count programming. The product can be
    downloaded at no expense at www.spacepak.com.
  • Since the framework has been appropriately
    estimated for the structure, we can start our
    hardware establishment.

6
2.Find A Suitable Location For The Fan Coil Unit
  • The underlying thought is the area of the fan
    loop unit. The fan loop unit might be situated in
    an unconditioned space. Regions, for example, an
    upper room, carport, or creep space are adequate
    as long as the area is shielded from the climate
    and nearby codes are met. The fan loop unit may
    likewise be situated in an adapted space, for
    example, a cellar, storage room, or utility room.
    Two kinds of fan curl design are offered - flat
    and vertical cupboards.

7
3. Construct A Simple Platform
  • You can develop a straightforward stage dependent
    on the size of the fan curl unit. (Guidelines for
    this might be found in the establishment manual).
    It is prescribed to utilize 2-by 8-inch stud
    amble and at least 1/2-inch pressed wood for
    stage development. Continuously utilize the gave
    segregation strips under the unit for best
    execution. You can also hire company like QRG AIR
    CONDITIONING

8
5. Install Supply Tubing
  • You are presently prepared to introduce the
    supply tubing. (Snappy connectors, plenum
    departures with gaskets, and offsetting holes are
    provided with the establishment unit.) Always
    maintain a strategic distance from sharp twists
    in the supply tubing and attenuator tubing.
    Supply tubing normally comes in 100-foot lengths
    and might be sliced to wanted length. The base
    length is 6 feet and the most extreme is 30 feet
    with attenuator. Slice your supply tubing to the
    best possible length.

9
4. Connect Supply Tubing And Plenum Duct
  • When introducing the air circulation parts, it is
    dependably a smart thought to complete a
    framework design dependent on your estimating
    parameters. The plenum conduit might be kept
    running in essentially any area that is available
    for the connection of the supply tubing. (Audit
    recommended formats in the establishment manual).

10
Graphics
11
Contact Us
  • Contact Number
    703-466-0072

Email us
info_at_qrgtech.com
Visit us on Quality Furnace Installation
Services
Write a Comment
User Comments (0)
About PowerShow.com