Title: Benchmarking Professionals, Brisbane QLD
1(No Transcript)
2The man that made the model and still drives it
with the assistance of a technical and analytical
team is Arthur Gill. Arthur holds a PhD in
structural engineering 1st class honors in
mechanical, and civil engineering and quantity
surveying degrees. He has been a director of
an international EPCM organization delivering
global projects for over a decade. Arthur started
and ran his own engineering business (PDSM) with
over 100 staff for 13 years, before selling the
business to a large EPCM contractor. Arthurs
project delivery and engineering experience
includes successfully delivering many diverse
projects across many sectors Mine
Processing Heavy Infrastructure Renewable
Energy Aviation Infrastructure Oil
Gas Power Generation Port and Rail
Water and Major Infrastructure Projects Arthur
currently sits on two panels and is a major
shareholder of a multi-national banking and
funding institution. His career also includes
assisting governments in communications and
intelligence. He operates and owns, two
syndicates of Lloyds of London, and so is
intimately familiar with risk and insurance.
3- BMP give in detail cost confirmation and
benchmarking arrangements to determine costs and
return on investment for any project. - Ensure Certified Benchmarking Professionals,
including Forensic Accountants and Quantity
Surveyors. To settle on choices about your
business you can't bear to be unclear exactness
and sureness are the foundations of any well-run
business. - BMP arrangement enables you to benchmark your
business expenses that permit administrators,
designing and Development organizations,
proprietors groups and Corporates working in the
aeronautics, renewables, manufacturing,
automation, mining process, power generation,
heavy infrastructure sectors and oil gas. - Tender Reviews and Proposals.
- Independent Peer Reviews of your Proposals -
Budgets - Tenders Operations. - Re-engineering, reviews of costs-processes and
procedures. - Engineering Principles and Industry Benchmarking.
FEL 1 3 Detailed Design Bankable Feasibility Study
Project execution Construction Manufacturing / automation / fuel handling / ports and wharf modular design
Tender review or verification Review contrs. conditions Manufacturing / automation / fuel handling / ports and wharf modular design
Schedule reviews Work packages Manufacturing / automation / fuel handling / ports and wharf modular design
4(No Transcript)
5- Certification-
- Certification of costs is one of our processes
used to validate the model, by our team members,
those who are qualified as Certified Benchmarking
Professionals (CBP), review and approve the data,
processes and output from the model to provide an
additional layer of certainty to the results. - Why Certify your costs ?
- Certified costs are recognized in the financial
industry as accurate and trustworthy, which means
that they are accepted almost universally by the
people who will fund your project. - The advantage is greater certainty in the cost
model, ready acceptance by the financial
industry, thereby avoiding an additional
verification step and so reducing delays and
extra costs to your project. - This advantage is magnified in the case of banks
we work with, where the BMP cost model provides a
pre-approved transition to the project funding
process.
Cont.
6Certification of costs
- How we Identify Risk !
- We interrogate all risk profiles not just the
engineering aspects and rate them against risk to
the funder/ client/ owners team/ EPCM
Contractor. These risks include but are not
limited to - Price
- Time
- Procurement
- Design
- Owners responsibilities
- Owners team
- Consultants
- Vendors local and off shore
- Project management consultants
- Sub-contractors
- Approvals local and federal
- Exchange rates
- Labor local and expatriate
- In-country and off-shore risk
- Union and labor supply agreements
- To establish an overall risk profile that applies
to every cost associated with a project. Its
your choice as to which of these items you
require. Our processes ensure that all items are
linked.
Cont.
7ROI This is linked to every part of the process, including work packages.
Baseline Costs You must know these or otherwise its just a guess, and if these costs are not repeatable, then they are not your baseline costs.
Best Practice Costs We can compare any cost against industry best practice. We cover most industries with costs sourced from reliable sources that look at the whole picture from submission for funding approval to final account.
Audit Our CBP professionals ensure that these processes are correct, meaning we are pre-cleared with three banking institutions for Funding Submissions, this accelerates the process and ensures compliance with these banking organizations protocols.
Business Case Finance Funding We have contacts with many funding organizations and our processes are cleared in advance, so that any submission can be easily managed within these institutions.
We are able to offer on site management of your
schedule and costs. This is not your usual 20
plus EPCM team - we can do this with a maximum of
four staff only for a large project, and less for
a smaller one. Typically this is engineering
manager, an analyst, a planner and a progress
chaser. This ensures the design, plan and
schedule is as per the Budget. This allows you to
carry out the construction while we monitor costs
- labor - procurement - overheads - schedule to
ensure you do not overspend and also watching
that the contract is adhered to by all parties.
8(No Transcript)
9(No Transcript)
10Head Office Brisbane
Phone (61) 0448 883 972
Mobile (61) 07 5547 0753
Email ID sheareng_at_optusnet.com.au info_at_benchmarkingprofessionals.com
Website www.benchmarkingprofessionals.com