FRP Cable Tray Manufacturers Sharing
Responsibilities Of Workmen For Installing Cable
Trays
2
  • FRP Cable tray installation cannot be done by one
    person as there is an entire team that completes
    the installation. There is a project manager,
    site engineer, foreman, and safety engineer. FRP
    Cable trays manufacturers will list significant
    responsibilities of these people with the
    readers.

3
Project Manager
  • Project manager is a person who handles the
    installation process. The basic responsibilities
    of the project manager are-
  • To check that all the preparation and application
    works are done as per the contract specification.
  • To ensure the progress should be carried out as
    per the planned program and approved method
    statement.
  • To ensure that equipments and material required
    for the site work are present there as per the
    planned construction programme.
  • To be in a contact with main contractor and
    coordinate with him, MEP co-coordinator and
    safety officer to ensure safe and apt execution
    of the plan.

4
Site Engineer
  • Site engineer is a person who stays on the site
    and handles the project. Here are few
    responsibilities of a site engineer for
    installing cable tray-
  • He checks that the works are done as per the
    CONTRACT SPECIFICATIONS that are approved method
    statement.
  • He provides all required data and information and
    distributes responsibilities to the construction
    team he handles.
  • He monitors the progress of project and report to
    project manager.
  • He coordinates with safety office to ensure that
    the installation work is done under secure
    practicing methods.

5
Foreman
  • Foreman is a person who analyzes the site and
    helps site engineer in getting the work done. His
    responsibilities are-
  • He coordinates with site engineer regularly and
    ensures proper distribution of workforce in the
    planned location.
  • He ensures with site engineer that the manpower
    for project is moving as per the contract.
  • He updates site engineer about the work progress.
  • He controls waste materials disposal as per the
    instructions he gets from site engineer.
  • He informs site manager which areas are ready for
    inspection.

6
Safety Engineer
  • Safety engineer is a person who checks the safety
    aspects on the site. His responsibilities are-
  • He checks implementation of all safety measures.
  • He checks whether the implemented measures are
    sufficient to maintain the safety at work site.
  • He inspects the site activities and train the
    staff to avoid accidents
  • He reports to project manager and client.
  • He is responsible for site maintenance.
  • FRP Cable tray manufacturers have shared this
    information with their products users to widen
    their knowledge level. You can share your
    thoughts with respect to this post in comment
    section.

7
91 97128 50506 91 95866 50506 91 97125 45777
https//www.tribenifiber.com/
510,Luxuria business Hubbefore VR Mall next to
dumas resortDumas Piplod roadSurat 395007.
info_at_tribenifiber.com
Write a Comment
User Comments (0)
About PowerShow.com