Promote Commercial Projects With Adoption Of JV3 Modeling - PowerPoint PPT Presentation

About This Presentation
Title:

Promote Commercial Projects With Adoption Of JV3 Modeling

Description:

If someone is sure to purchase a new project, then there is the need to design accordingly with the JV3 modeling. Therefore the addition of flexible design solutions for the new project is worthy enough. Homeowners need to consult with planners to choose designs. No longer a person has to think of fulfilling floor insulation, ranging from walls to ceilings. The application of thermal modeling software is enough to design the best real estate projects. – PowerPoint PPT presentation

Number of Views:8
Slides: 7
Provided by: ecocertificates
Category: Other

less

Transcript and Presenter's Notes

Title: Promote Commercial Projects With Adoption Of JV3 Modeling


1
(No Transcript)
2
  • Assessment methods are the best to pull out
    satisfactory results of any designed project.
  • So, before furthering the plans of developing a
    building, the substantial part is to have
    assessed several aspects.
  • The innovative solutions can be the measured
    outputs for commercial projects.
  • Hence, the quick, and reliable form is to
    highlight the aspect of the JV 3 assessment. In
    other words, it is architects who can afford to
    have an assessment method for non-residential
    buildings.
  • Before adopting the measure, everyone needs to
    have a thorough idea about it.
  • In this stated measure, the objective of the
    assessment is to have a reference building.
  • Next, designers start to compare the overall
    energy consumption of new buildings. Most
    importantly, it is based on determining factors
    of climate and location.

3
  • Benefits Of Assessment
  • It is merely difficult to find out
    well-structured buildings possessing similar
    designs, building materials, and layouts.
  • For drawing the maximum returns, individuals want
    to make a comparison of the proposed design.
  • Hence, individuals target to make it big through
    the inclusion of a DTS reference building.
  • Though the method is more expensive and
    time-consuming for assessment, there are
    considerable gains for the same.
  • Thereby, a comprehensive evaluation is based on
    listed factors of weather data and specific
    location. Moreover, planners are free to choose
    building elements and glazing properties.
  • Also Read How are BASIX and BCA Section J
    Essential for Sustainable Environment

4
  • Aptness Of Modeling
  • If someone is sure to purchase a new project,
    then there is the need to design accordingly with
    the JV3 modeling. Therefore the addition of
    flexible design solutions for the new project is
    worthy enough.
  • Homeowners need to consult with planners to
    choose designs. No longer a person has to think
    of fulfilling floor insulation, ranging from
    walls to ceilings.
  • The application of thermal modeling software is
    enough to design the best real estate projects.
  • What else does matter is to have an eye on the
    construction cost? So, the best way to make it
    happen is to select rational designs.
  • However, there is another noticeable gain in the
    process. Thus, there is room to make design
    improvements that include different metrics.
  • Therefore, it is easy to track measures of
    aesthetics, increases energy.

5
  • Building Categories
  • JV3 building falls under the category of building
    classes such as 3,5,6,7, and 8.
  • Next, the proposed design gets resembles similar
    NatHERS modeling. Also, the annual energy
    consumption is vital to take note of.
  • Therefore the proposed building should not exceed
    the stipulated result.
  • Identifiable Factors For Assessment
  • For making a better assessment of the building,
    designers want to conduct it through 3D modeling.
  • Here is the successful software application
    comprises inputs of major elements such as
    orientation, climate information, and current
    location.
  • It is possible to estimate the correct building
    design through the three designed processes.
  • A detailed overview helps to cite out listed
    factors such as outputs, inputs, and
    calculations.

6
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com