The equipment, controls and software, and other Material handling methods must be standardized within the limits of achieving overall performance objectives without compromising with flexibility, modularity, and throughput. – PowerPoint PPT presentation

Number of Views:168

less

Transcript and Presenter's Notes

Title: Principles of Material Handling - Century Cranes


1
Principles of Material Handling Century Cranes
w w w . c e n t u r y c r a n e s . c o m
2
PLANNING PRINCIPLE
While donging material planning is very
important, where needed, performance objectives
and functional specifications of the proposed
methods are completely defined before time.
w w w . c e n t u r y c r a n e s . c o m
3
STANDARDIZATION PRINCIPLE
The equipment, controls and software, and other
Material handling methods must be standardized
within the limits of achieving overall
performance objectives without compromising with
flexibility, modularity, and throughput.
w w w . c e n t u r y c r a n e s . c o m
4
WORK PRINCIPLE
The workload of material handling should be
reduced material handling work should without
compromising productivity or the level of
service required of the operation.
w w w . c e n t u r y c r a n e s . c o m
5
ERGONOMIC PRINCIPLE
In the design of material handling tasks Human
capabilities and limitations must be recognized
to ensure safe and effective operations
w w w . c e n t u r y c r a n e s . c o m
6
UNIT LOAD PRINCIPLE
Unit loads must be sized and configured in a way
that achieves the material flow and inventory
objectives at each stage in the supply chain.
w w w . c e n t u r y c r a n e s . c o m
7
SYSTEM PRINCIPLE
Material movement and storage activities must be
integrated to form a coordinated, operational
system that spans receiving, inspection,
storage, production, etc.
w w w . c e n t u r y c r a n e s . c o m
8
AUTOMATION PRINCIPLE
Material movement and storage activities must be
integrated to form a coordinated, operational
system that spans receiving, inspection,
storage, production, etc.
w w w . c e n t u r y c r a n e s . c o m
9
To know more
Contact Us!! Ph 91-9910288366,
91-9958697823 Email century_at_centurycranes.com
Website www.centurycranes.com Address Plot
No.- 122-129, Sector 59,121004 Ballabhgarh,
Faridabad, Haryana, India
w w w . c e n t u r y c r a n e s . c o m
Write a Comment
User Comments (0)
About PowerShow.com