The turnover phase of any construction project is a well-ordered shift of building operations to the operation and maintenance (O&M) team from the project commissioning management services team. – PowerPoint PPT presentation

Number of Views:67

less

Transcript and Presenter's Notes

Title: Commissioning Best Practices to Follow during the Turnover Phase


1
Commissioning Best Practices to Follow during the
Turnover Phase
2
Commissioning - Turnover Phase
  • The turnover phase of any construction project is
    a well-ordered shift of building operations to
    the operation and maintenance (OM) team from the
    project commissioning management services team.
  • This transition is physical, signifies completion
    of commissioning-specific activities and involves
    knowledge transfer in the form of documentation.
  • A successful transition is said to occur when the
    commissioning-specific documentation is complete,
    fully organised, building systems are operable as
    per the design and OM personnel are trained
    appropriately to operate the systems.

3
Up to Date As-Built Documentation
  • Construction projects are largely directed by
    design documents that elucidate and describe
    countless working elements that require to be put
    together for a successful turnover.
  • The global commissioning management authority
    requires to be updated about the modifications as
    they impact commissioned equipment and gets
    updated documentation from the project team.
  • The commissioning authority is not accountable
    for updating design-specific documents, but they
    are responsible to ensure that red-lined updates
    are reflected well in as-built drawings given to
    the owner particularly, mechanical as well as
    controls as-builts.
  • As-builts provide the OM personnel with
    comprehensive information, using which they fix
    system problems, locate equipment, trend the
    performance of equipment and transfer knowledge
    to new personnel as and when needed.

4
Well-Structured Commissioning Documentation
  • Similar to design documents, commissioning
    documentation should showcase the real conditions
    of the commissioned systems.
  • At the least, the commissioning final report
    should consist of the Commissioning Plan and
    Performance Verification Criteria, Pre-Functional
    (PFC) and FPT notes, the Commissioning Issues Log
    and a letter of acceptance, along with supporting
    documents like Testing Adjusting and Balancing
    report, site visit reports, etc.
  • The FPT and PFC notes are crucial resources that
    could aid present and future building operators
    in developing a systems manual (if not provided
    in the turnover phase) and help them with
    re-commissioning, three to five 5 years post
    turnover. 

5
(No Transcript)
6
Providing a Systems Manual
  • As part of the turnover package, the systems
    manual is not needed, unless the project seeks
    LEED Enhanced. Having said that, its another
    important resource that may ensure a successful
    turnover.
  • Moreover, a systems manual should ideally include
    riser diagrams, control sequence highlights and
    control drawings. It is basically a tool that can
    be utilised by OM personnel for troubleshooting,
    operating, and maintaining and monitoring
    building performance.

7
Developing a Re-Commissioning Plan
  • In general, the re-commissioning plan should
    detail the following
  • Overview of the on-going commissioning process
  • Responsibilities and roles of the commissioning
    team
  • Schedule of re-commissioning
  • List of the systems involved
  • In-depth instructions for the replication of
    FPTs, implemented by the commissioning authority
    in the Acceptance phase.
  • Re-commissioning documents to monitor outcomes
  • Instructions and recommendations to set and track
    facility performance benchmarks

8
Contact US
  • Address Global Commissioning Management and
    Software Ltd, Unit 2, Chestfield Business
    ParkWhitstable Kent, CT5 3JB
  • https//www.facebook.com/GlobalCxMLtd
  • https//twitter.com/_globalltd
  • https//www.instagram.com/global_cxm/
  • https//www.linkedin.com/company/global-commission
    ing-management-software-ltd

9
Thank YOU!!
Write a Comment
User Comments (0)
About PowerShow.com