Title: BIM for Precast: Models Connections and Documentation
1BIM
for Precast
2Precast planning and layout with
conventional methods can be costly and
challenging for
Concrete Contractors
Site Engineers
Pre-casting Manufacturing Firms
Structural Designers
3Paper-based or 2D CAD processes are often
inaccurate or error-prone leading to
- Inaccuracies in coordination
- Greater drawing errors due to lack of
visualization - Higher modifications / rework
- Costly material wastage and hiccups in
construction process
Let us understand the specific challenges for
precast using legacy methods.
42D conventional precast techniques pose the
following challenges
Design errors with 2D CAD techniques leads to
reduced constructability
Inaccurate or incomplete reports for BBS
with CAD-based drawings
Uncoordinated shop drawings lead to inaccurate
casting and material wastage
Higher field errors lead to greater delivery
erection time
5- Precast concrete design, manufacturing,
scheduling, and installation becomes seamless
with BIM processes and tools.
64 Ways
that BIM can help Precast
7Faster generation of reports based on clash-free
and coordinated 3D models
1
- Quick and accurate report creation through
coordinated 3D BIM models for manufacturing, and
installation.
Coordinated reports for precast planning and
layouts
- Extraction of quantities from bar bending
schedules and bar lists through a coordinated 3D
BIM model.
- Typical set of structural elements from
clash-free BIM models, with unique ID and
erection ID for further coordination.
82
Typical list of structural elements using BIM
Coordinated BIM models help in publishing a
typical list of structural elements with respect
to size and shape which help
Detailed list of structural members for factory
production
- Factories to save on reusable moulds and continue
production in respective batches.
- Save cost and time for overall production process
in factories.
9Extraction of model-based shop drawings for
improved casting efficiency
3
- Production of a fully coordinated 3D Rebar model
with documentation to build a comprehensive
document set.
Generate accurate shop drawings with BBS
- Quick extraction and edit of shop drawings from
BIM models.
- Detailed BBS (Bar Bending Schedule) from
coordinated BIM models for precise casting.
10Faster building erection with Precast concrete
modeling and detailing
4
- Visualization of erection sequences with unique
ID with precast element connections and joint
design for better assembly.
Reduce onsite errors for faster erection
- Precise mapping of construction activity planning
and elements related to each activity with the
use of BIM.
- Swift onsite erection, cost and time savings with
accurate component placement, precise erection
orders, and planned logistics for speedy
construction.
11Coordinated 3D structural model at LOD 450 saves
cost and time for office building.
An accurate, information-packed, and clash-free
3D Revit structure model at LOD 450 reinforced
with Rebar modeling saved cost and time for a
precast manufacturing project.
- Click here to read more
- https//www.hitechcaddservices.com/case-studies/re
vit-structural-model-for-office-building/
12Enhance the ROI of your construction project with
accurate 3D model-based documentation and
complete sheet setup.
- Connect with our precast modeling and detailing
team for cost-effective deliverables and high
impact outcomes.