Title: How Long Does it Take to Installing Solar Panel?
1How Long is the Wait Between Solar Booking and
Solar Installation?
Visit https//ausbrite.com.au/installing-solar-p
anels/
2- Solar panels are an excellent way to collaborate
with nature. On the global map, Australia has
higher uptake of solar. A study showed that more
than 2.68 million rooftop solar systems had been
installed in Australia. - However, going solar is not as easy as buying
clothes. First, you investigate, compare, and ask
various questions, and then you decide to book a
panel. If you consider installing rooftop solar
panels, the first question is, how long does it
take to install a solar panel? - You cant have a solar panel installed on your
roof the minute you book it. There can be a
longer period between booking a solar panel and
its installation. The time can take between weeks
to several months. - In that case, it can be quite frustrating to wait
for the installation of your solar panel systems.
However, it is said that good things take time.
So the results would be worth your wait.
3Read on to know about the process involved in
solar panel installation and the period involved
in each step
You have to undergo certain steps after you
decide to invest in solar panels. Each stage will
take its own time, depending on the state of
conditions you may face. As a result, the solar
installation time can vary from panel to panel.
Finding a Solar Installer
The first concrete step involved in installing a
solar panel is choosing a solar installer. You
should not rush on this step. If you choose an
inexperienced company, you will regret your
decision later. Further, it will increase your
installation time.
4General Site Visit one to two weeks
- When you narrow down your solar installation
choices, you may request a general site visit. A
representative will come and evaluate your home
energy needs. They look for google maps, check
the directions of your roof and the shading on
your property to better coordinate where your
residential solar panels are placed. - This whole process approximately takes between
one to two weeks. However, at this stage, the
company and customers agree on a price and start
the work.
5Pulling Permits one week to a month
- Before installing solar panels, your solar
company, your solar company will need to file a
permit with your local government. The permit may
vary depending on your location and the kind of
solar panel you are installing. This process can
anywhere take between one week to a month.
Ordering Your Solar Equipment one day to several
weeks
- As long as your permits are approved, your solar
installer will give the green light to order the
equipment. Your installation company may already
have this equipment in stock, but if not, your
project manager will need to work with the
companys shipping department to order the
equipment.
6- If your solar panels and other equipment are
coming from overseas, you must wait for several
weeks. This can further delay your installation
process.
Size and Type of Solar Panel System
- Once the permit is approved, and the installation
is scheduled, the actual installation is perhaps
the quickest part of the process. The Solar
Panels installation process takes one to three
days by most solar companies. However, it mainly
depends on how many solar panels you are
installing. - The process to install a ground-mounted solar
panel may take more time because it requires
additional work. Moreover, if the location of
your solar panel system is far from your electric
meter, it can take more time.
7Property Characteristics and Necessary Upgrades
- Every home is unique when it comes to roofing and
electrical systems. Moreover, your home may need
an upgrade before installing solar panels. These
upgrades include rooftopping, upgrading your
electric panel, and checking if your roof can
handle the weight of solar panels. Unfortunately,
upgrades mean further delays in the installation
process.
Utility Interconnections
- This is the time when a customer gets anxious.
Two things can happen at this stage. Firstly,
your solar company submits the documents to the
utility company to connect to the grid. This
process can usually take one to two weeks.
8- Then the utility has to install a bi-directional
meter to track how much energy you are producing.
This period can generally take between two to
four weeks. The overall dealing with the utility
can take between three to six weeks. The key to
handle this time is being patient. - The best way to reduce your booking and
installation time is to work with a reputable
installer so that you can get your solar panels
as early as possible.
Why Choose Aus-Brite Solar?
- Aus-brite Solar caters to the solar energy needs
of all Australian households. We offer clean
energy solutions based on your energy needs. You
can get the best solar deals in Sydney from our
solar providers. Contact us and join the league
of clean and green energy!