Title: Comparison Between Aluminium Formwork and Traditional Formwork


1
Comparison between Aluminium Formwork and
Traditional Formwork
Aluminium Formwork System
Conventional Formwork System
Speed of construction
Four days cycle per floor
The minimum cycle time is of 21 days
Quality of surface finish
Excellent, Plastering not required
Bad, Plastering is required
Cast-Insite cellular construction
Types of construction
Simple RCC framed construction
Accuracy is less than a modern system
Accuracy in construction
Accurate construction
Resistance to earthquake
Less than the modern system
Good resistance
Wastage of formwork material
Very less amount
In great amount
Maximum 50-60 times
Re-usage value of formwork
250-300 times
Economical on a small houses
Economical for mass houses
Economy in construction