Title: Asphalt Batching Plant Dispatch To Russia - Atlas Industries
1Track Records Oaks Paves Pte Ltd is a civil
engineering company, specialised in road
resurfacing patching works. Oaks Paves aims to
deliver well paved roads, through quick response
time bearing in mind, high safety standards to
the community at large. Below are the various
types of Oaks Paves Track Records. Tanah Merah
Location Changi Airport Terminal 5 Year of
Completion ETA End of Year 2023 Mix Design
W3B, Hot-Mix Project Scope To supply, labour,
material, tools required to carry out Asphalt
paving works
Shin Khai Construction P/L
www.oakspaves.com.sg
Location 39 Woodlands Close, 03-61
MEGA_at_WOODLANDS Singapore 737856
0116 296 7744 info_at_midlandscare.co.uk
www.midlandscare.co.uk
sales_at_paves.com.sg
2Location Pasir Ris Street 52, Singapore Year of
Completion May 2023 Mix Design W3B,
Hot-Mix Project Scope To supply, labour,
material, tools required to carry out Asphalt
paving works Project Specifications Track
Length Approx. 56sqm, Thickness 70mm
ZV Construction P/L
Location West Coast, Singapore Year of
Completion June 2023 Mix Design W3B,
Hot-Mix Project Scope To supply, labour,
material, tools required to carry out Asphalt
paving works Project Specifications Track
Length Less then 1 sqm, Thickness 50mm
HD Contractor P/L
Location West Coast, Singapore Year of
Completion June 2023 Mix Design W3B,
Hot-Mix Project Scope To supply, labour,
material, tools required to carry out Asphalt
paving works Project Specifications Track
Length Less then 1 sqm, Thickness 50mm
www.oakspaves.com.sg
Location 39 Woodlands Close, 03-61
MEGA_at_WOODLANDS Singapore 737856
0116 296 7744 info_at_midlandscare.co.uk
www.midlandscare.co.uk
sales_at_paves.com.sg
3Manuli Fluiconnecto
Location Tuas, Singapore Year of Completion
August 2022 Mix Design W3, Hot-Mix Project
Scope To supply, labour, material, tools
required to carry out Asphalt patching
works Project Specifications Track Length
Approx. 11.42 sqm, Thickness 50mm
Pasir Ris Punggol Town Council
Location Pasir Ris, Singapore Year of
Completion September 2022 Project Scope To
supply, labour, material, tools required to carry
out milling and paving works (Asphalt finish on
Phase 1 of N2 park) Project Specifications
Track Length (Phase 1) 150m2, Thickness 40mm
www.oakspaves.com.sg
Location 39 Woodlands Close, 03-61
MEGA_at_WOODLANDS Singapore 737856
0116 296 7744 info_at_midlandscare.co.uk
www.midlandscare.co.uk
sales_at_paves.com.sg