Army Sky Warrior Program - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Army Sky Warrior Program

Description:

Army Sky Warrior Program – PowerPoint PPT presentation

Number of Views:104
Avg rating:3.0/5.0
Slides: 10
Provided by: david1629
Category:
Tags: army | program | pze | sky | warrior

less

Transcript and Presenter's Notes

Title: Army Sky Warrior Program


1
Army Sky Warrior Program
Providing capabilities to soldiers in combat
December 2008
2
ER/MP MQ-1C Sky Warrior Overview
  • Mission Provide U.S. Army division commanders a
    responsive, agile, and flexible capability to
    perform RSTA, communications relay,
    manned/unmanned teaming and target attack
  • Contract awarded August 2005
  • SDD program
  • 17 aircraft (Block 1)
  • 7 ground control stations (GCS)
  • Full program 11 systems
  • 12 aircraft and 5 GCS per system
  • Milestone C decision first quarter GFY 10

3
I-GNAT ER/SKY WARRIOR ALPHA
  • 16 currently deployed
  • Initial deployment March 2004 74,000 total
    flight hours to date

High-Time Airframe Flight Hours 1 2 3
12,000 11,000 10,000
4
Sky Warrior Block 0 (No TCDL, Uses GA-ASI GCS)
  • Intent to field quickly and as a MQ-1C Program
    risk reduction
  • Similarities to SDD (Block 1)
  • Airframe
  • Thielert 1.7 liter diesel engine
  • Triple/dual redundancies (avionics flight
    control surfaces)
  • Block 0 deployed in April 2008
  • Provided true Sky Warrior capability to the field
    16 months early
  • Over 3,000 flight hours
  • Limited unscheduled maintenance actions
  • First two aircraft flew 1,000 flight hours with
    no unscheduled maintenance action
  • ISR surge OSD inserted two Quick Reaction
    Capability (Block 1) systems in April 08
  • 4 aircraft 2 OSGCS system to deploy July 09

5
ER/MP Sky Warrior Block 1
  • Differences from Predator
  • 30 increase in GTOW
  • Four HELLFIRE missiles
  • Heavy fuel engine
  • Triple redundant avionics flight controls
  • Dual redundant flight control surfaces
  • Auto takeoff land (dual systems)
  • TCDL LOS communications
  • TCDL air data relay communications
  • De-icing
  • One system GCS

APW873TJC12-10-07
6
Block 1 Status
  • 10 aircraft built and 7 One System GCSs
  • Tactical Control Data Link (TCDL) and Ku SATCOM
    operable
  • Successfully demonstrated fully automated flight
    on TCDL
  • Successfully demonstrated auto takeoff and
    landing from OSGCS via TCDL
  • Soldier training began 24 November for first QRC
    deployment (June 2009)
  • Early fielding with Sky Warrior deployments of
    Block 0 and QRC

7
How Far We Have Come
600,000 Predator series flight hours to date
8
U.S. Army Program Summary
  • 77,000 (I-GNAT ER/Sky Warrior Alpha Block 0)
    flight hours supporting Army ground forces
  • Sky Warrior Block 0 has provided risk reduction
    for MQ-1C Sky Warrior
  • Surpassed technical challenges of MQ-1C SDD
    program
  • Soldier operator training for QRC deployment
    ongoing

9
High Ops Tempo
Every second of every day, 40 Predator-series
aircraft are airborne worldwide.
OA855TJC12-10-07
Write a Comment
User Comments (0)
About PowerShow.com