1
  • LBDS Dry Runs
  • Ioan Kozsar Julian Lewis Benjamin Todd Bruno
    Puccio Lars Jensen Ana Guerrero Ollacarizqueta
    Stephane Bart Pedersen Michael Ludwig Bernd
    Dehning Christos Zamantzas Jean-Jacques Gras
    Jan Uythoven Etienne Carlier Nicolas Magnin
    Nicolas Voumard Christophe Chanavat Marine
    Gourber-Pace Ronny Billen Chris Roderick Reyes
    Alemany Fernandez Vito Baggiolini Fabio Follin
    Markus Albert Guy Crockford Marek Misiowiec
    Grzegorz Kruk Jerome Axensalva Eric Gallet
    Brennan Goddard Mike Lamont Verena Kain

2
LBDS Dry Runs
  • http//wikis/display/LHCOP/LBDSDryRuns
  • Scope week 7
  • Test point 6 BI in XPOC acquisition mode
  • Running LBDS equipment from the control room
  • Week 8 Sequence (almost) ready for reliability
    run from CCC
  • Scope week 11
  • Beam dump system beam 1 programmed dumps
  • Local permit loop
  • RF simulated revolution frequency
  • Programmed dumps via timing system to break
    permit loop
  • LBDS triggered by broken permit loop
  • Next dry runs week 15, week 19
  • Add beam 2 system, interfaces to other systems
    (injection, ), full scenarios (I D, )

3
LBDS programmed dump - normally
  • Energy Tracking System (BETS) receives energy
    from 4 arcs to define kicker voltage
  • Programmed Dump Beam 1
  • FESA command to BIS unlink permit loops
    (sequence)
  • Timing suppress post mortem beam 1 (sequence)
  • Timing Dump beam 1 event is sent out
    (sequence)
  • Timing system input to the BIS removes user
    permit
  • BIS Broken permit loop triggers beam dump for
    beam 1
  • Timing detects broken permit loop ? sends out
    beam 1 dumped event ( required for External
    Post Operational Check XPOC)
  • Timing Enable post mortem beam 1 (sequence)

4
LBDS Dry Run - week 7
  • Scenario
  • Beam 1 only
  • Beam dump (beam 1) triggered by timing event
    (dump event)
  • The beam dumped event is sent out by operations
    (sequencer timing table), not automatically by
    timing
  • The BI acquisition is triggered by the beam
    dumped event for the XPOC analysis
  • The energy input for the BETS comes through a
    BETS simulator, not through the RB DCCTs in 4
    arcs
  • We test
  • Control of LBDS equipment from control room
    (except TSU)
  • Arming of LBDS through sequencer, LBDS monitoring
    GUI
  • Point 6 BI
  • XPOC acquisition (BI, LBDS), logging, first
    analysis and report to sequencer

5
LBDS Dry Run week 7
Plus all the BLMs in the region, except the
direct ones.
6
BI week 7
  • BPMSE
  • BPMD
  • BTVSE
  • BTVD
  • BTVDD
  • BLMs
  • Missing direct BLMs, BSRA, BPMSA

7
Fixed Displays week 7

Not the final versions will need to rationalise
8
Timing Table week 7
Start table event, payload 17 (Hex 11)
9
Sequence
  • We will use the sequencer to run the LBDS system
    through a cycle
  • Will be used for reliability run afterwards
    needs to be operational for several months
  • Sequence (simplified)
  • Get XPOC result if OK, carry on, otherwise abort
  • Go to 450 GeV
  • ARM LBDS
  • Start energy ramp
  • Play timing table with dump event

10
Conclusions
  • after the first dry run