First Earth Explorer Core Mission - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

First Earth Explorer Core Mission

Description:

First ESA Mission dedicated to the exploration of the Earth Gravity Field ... Determine the geoid (= equipotential surface of a hypothetical ocean at rest) ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 6
Provided by: marg127
Category:

less

Transcript and Presenter's Notes

Title: First Earth Explorer Core Mission


1
Earth Observation Programmes Directorate
Gravity Field and Steady-State Ocean Circulation
Explorer GOCE
  • First Earth Explorer Core Mission
  • First ESA Mission dedicated to the exploration of
    the Earth Gravity Field

2
Earth Observation Programmes Directorate
GOCE
  • Mission Objectives
  • Determine the Earths Gravity field with an
    accuracy of 1 mgal(i.e. 1 millionth of Earth
    Gravity).
  • Determine the geoid ( equipotential surface of a
    hypothetical ocean at rest) with an accuracy of 1
    cm.
  • Achieve this at length scales down to L 100 Km.

3
Earth Observation Programmes Directorate
GOCE
  • System / Configuration
  • Aerodynamic shape with low drag profile along
    flight direction.
  • Electrostatic Gravity Gradiometer to measure
    gravity gradient tensor.
  • GPS Receiver to recover low frequency gravity
    components.
  • Orbit maintenance and in-track drag compensation
    by Ion thruster.
  • Cross-track/radial drag compensation by field
    emission electric thrusters.
  • Solar generator distributed over two fixed wings
    and half of satellite body.
  • Dimensions 5m long, 1m f
  • Mass at launch 1.2 tons.

4
Earth Observation Programmes Directorate
GOCE
  • Present Status
  • Space Segment is at the beginning of Phase
    C/D(i.e. development / production phase).
  • Industrial consortium has been established via
    open competitions.
  • Future Planning
  • Ground Segment procurement activities will start
    before end 2002 with the release of the
    Invitation to Tender for the Payload Data Segment
    development.
  • Predicted launch date is mid February 2006.

5
Earth Observation Programmes Directorate
GOCE
Industrial core team
Write a Comment
User Comments (0)
About PowerShow.com