Getting Ready for CPA Comprehensive Performance Assessment - PowerPoint PPT Presentation

1 / 78
About This Presentation
Title:

Getting Ready for CPA Comprehensive Performance Assessment

Description:

We want to help our children to achieve their potential and enjoy life. Direction of Travel ... The delivery of the Havelock academy project ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 79
Provided by: hol72
Category:

less

Transcript and Presenter's Notes

Title: Getting Ready for CPA Comprehensive Performance Assessment


1
Childrens Services Whole Directorate Meetings
Thursday 9th November 2006 Friday 10th November
2006
2
Childrens Services VisionWe want to help our
children to achieve their potential and enjoy
life.
3
Direction of Travel
  • Capital and Assets
  • Capital Programme
  • Co-ordination of the school organisation
    Programmes

4
  • Building Schools for the Future team
  • The delivery of the Hereford project.
  • The delivery of the two academy projects at
    Immingham and Wintringham
  • The delivery of the Havelock academy project
  • The completion of the BSF self assessment and
    wave 5 bid.
  • The completion and launch of the consultation
    documentation for the secondary school BSF school
    organisation.

5
  • Specialist Services / Education
  • Reduction in exclusions the lowest level of
    permanent exclusions in NELC history
  • Delegation of statementing money to schools
  • Unbeatable 100 performance in statementing
    performance indicators

6
  • Specialist Services
  • Refurbishment of Western School for Vulnerable
    Children Unit.
  • The first phase of the extension at Phoenix House
    complete.

7
  • Policy, Planning and Commissioning
  • Outcome Plans and monitoring ensuring the 'golden
    thread'
  • 100 of child protection review conferences have
    been held within required timescales
  • 100 of children who are looked after have had
    their Looked After Child Review held within
    required timescales
  • 100 of children who are looked after have
    participated in their review by attending the
    review, submitting a written contribution or by
    their views being represented by an advocate.

8
  • PPC continued
  • ICS and ESCR
  • IS INDEX
  • EMS
  • CAF

9
  • Looked after Children and Performance
  • Fostering Improved placement stability.
  • Adoption. 100 of social workers now hold the PQ1
    award. Successfully implemented the new Adoption
    Children Act requirements across the
    directorate
  • Looked After Children in Education Team Improved
    the attendance of looked after children.
  • 16 Introduced a new Pathway planning process so
    that clearer plans are made for young people and
    they are actively involved in the process. A
    group of young men recently won the regional care
    leavers football tournament
  • Short Break Service Increased the range of
    respite options and activities for children with
    disabilities with particular emphasis on young
    people with complex needs and challenging
    behaviour. Secured a property to enable delivery
    of services to children with physical
    disabilities previously not catered for

10
  • LAC Achieved health assessments and dental care
    for 99 of looked after children.
  • Disability Services Significantly improved the
    transition process. Introduction of a duty system
    which has significantly improved service delivery
    and communication with service users. Cromwell
    House has been judged to be an excellent service
    provider by CSCI. A new behaviour management
    approach has been adopted through residential
    services and the whole directorate
  • Family Resource Service Established childrens
    and parents focus groups with very positive
    feedback. Positive feedback from the annual
    parents survey about the success of FRS
    involvement in effecting change. Trained 4 young
    people in recruitment and selection process and
    successfully involved them in the recruitment of
    staff

11
  • Childcare Fieldwork
  • Introduced the new Common Assessment framework
    aiming to support more families at an earlier
    stage.
  • Successfully supporting more children within
    their own families through a comprehensive and
    thorough multi-agency approach.
  • The Referral and Assessment team have agreed
    extended hours service provision which will
    enhance availability and access to services.

12
  • Extended Services
  • Developing Integrated Childrens Services
    Workshops have been well received
  • Playing for Success at the GTFC Study Support
    Centre continues to impact on the learning
    achievement of our young people
  • Extended Schools summer and October activities
    were well supported by children and young people

13
  • Standards and Effectiveness Team
  • Standards raised further at Key Stage 4 through
    targeted work, to 47.7, up 8 places in the
    rankings
  • Classified as among the fastest improving LA s in
    the country (top quartile performance)

14
  • Early Years and Childcare
  • 1st Authority in the Region to have a Childminder
    that has been graded by Ofsted as 'Outstanding'
  • This Year the Department has achieved the MATRIX
    award for quality of service and information to
    its clients
  • In the Top quartile for both BVPI Indicators
    'Leadership and Management of Early Years and
    Daycare Providers'

15
  • Young Peoples Service
  • Democracy Day October 20 with over 143 young
    people learning more about the democratic
    processes and support was given from 4 elected
    members.
  • The young peoples centres which provide open
    access youth work are now due to reopen after
    extensive refurbishment works. Open access youth
    work is a critical part of the service

16
  • Adult, Community and Employment Development
    Services
  • The service fulfilled its contract for 2005-06
    with 1,530 FE learners doing vocational
    programmes and a total of 3,784 across family
    learning and personal and social programming, and
    First steps
  • EDS has continued to meet its LSC targets on
    recruitment and retention and destinations of
    young people on work based learning and has also
    met its LPSA targets for adults into jobs
    2004-05.

17
  • School Access, Governance and Student Services
  • Development of a Children Missing from Education
    Strategy
  • Secondary On-line Admission Applications
  • Number of students being offered their first
    preference school increased
  • Headline figures for school transport
  • Governor Services clean 2006 audit.
  • All HE Student Finance applications received by
    published deadlines processed within applicable
    timescales
  • Demand for 16-19 cycle scheme at highest level
    since introduced - 131 cycle recipients in
    2005/2006 compared to 33 in 2003/2004 (year it
    was introduced) (118 in 2004/05). 180 enquiries
    so far in 2006/2007.

18
  • Annual Performance Assesment
  • APA

19
APA 2006
  • Self Assessment May 2006
  • On-site visit June 2006
  • APA letter published 1st November 2006

20
APA 2006 Results
21
Grade 2 awarded for
  • The contribution of the local authoritys
    childrens services in maintaining and improving
    outcomes for children and young people

22
Grade 3 awarded for
  • The councils overall capacity to improve its
    services for children and young people

23
Grade 3 awarded for
  • The contribution of the local authoritys social
    care services in maintaining and improving
    outcomes for children and young people

24
The Result
  • Confirms improvements over the past year in the
    delivery of the councils children's services
  • Increased from a one star (2005) to a two star
    service (2006)
  • Now judged to deliver the minimum requirements to
    all users.

25
Be Healthy
  • Key strengths
  • Health of looked-after children
  • Promotion of healthy lifestyles by primary
    schools
  • Key areas for improvement
  • Teenage pregnancy rates
  • Child and Adolescent Mental Health
  • Systems for assessing the quality of outcomes
    from the personal, social and health education
    provision in secondary schools

26
Stay Safe
  • Key strengths
  • Policy and practice around child protection
  • Safety and stability of looked-after children in
    foster placements and adoption
  • Adoptions of looked-after children
  • Participation by 13 to 19 year olds in youth
    service provision
  • Key areas for improvement
  • NVQ level 3 training caring for children and
    young people

27
Enjoy and Achieve
  • Key strengths
  • Early years provision and outcomes at Key Stages
    1 and 2
  • The proportion of care leavers in employment,
    education and training at age 19
  • Primary school attendance
  • Childrens centres offer an integrated service
    provision in areas of greatest need
  • Key areas for development
  • Achievement and standards at age 16
  • Performance of some secondary schools
  • Unauthorised absence in secondary schools

28
Making a Positive Contribution
  • Key strengths
  • Rates of warning and convictions of looked-after
    children
  • Participation in decision making by children and
    young people
  • Opportunities for primary school children to
    participate in community activities
  • Participation of young people in individual
    reviews

29
Achieve Economic well-being
  • Key strengths
  • Vulnerable children are empowered to achieve
    economic independence and well-being
  • All looked-after children post-15 have pathway
    plans
  • Percentage of care leavers in employment,
    education and training at age 19
  • Key areas for improvement
  • Educational attainment at 14 19 requires
    improvement
  • Further increase participation rates post-16

30
Management of Childrens Services
  • Key strengths
  • Self-assessment that is evaluative
  • Multi-agency collaboration in service provision
  • Management of social care services to achieve a
    high level of outcomes
  • Capacity to improve
  • Key areas for development
  • Management of the school advisory service to
    effect improvement in secondary schools
  • Consistent use of targets to inform performance
    management at all levels

31
Aspects for focus in a future joint area review
or the next APA
  • How effectively has the strategies to reduce
    teenage pregnancy been implemented
  • How well the procedures for assessing the impact
    of personal, social and health education have
    improved to promote healthy lifestyles
  • Have attendance rates continued to improve
  • How effectively has the school improvement
    service consistently contributed to raising
    standards for children and young people aged 11
    19.

32
Getting Ready for CPA(Comprehensive Performance
Assessment)
  • Corporate Assessment

33
What are all the elements we must complete?
34
How did we do in 2005?
1
2
0
3
2
2
1
2
1
35
CPA Programme Target Scoring
NB Level 1 and level 2 services and Direction of
Travel will change in February 2007, so best
result in February 2 stars improving
well Corporate Assessment and Joint Area Review
will take place in Jan 07, so we hope to keep our
score at 2 stars improving well at end of
June 07.
36
Arrangements for managing this programme
Cabinet
LSP
Corporate Management Team
SMT
Logistics
Data/Evidence
Data/Evidence
Tours/Neighbourhood
Ambition Beverley Compton Cllr. Brookes
Prioritisation Beverley Compton Cllr. Brookes
Capacity Liz Jones / Alan Madin Cllr. Brookes
Performance Management B. Compton Cllr. Brookes
Achievement
Sustainable Communities Transport Ray
Oxby Cllr. Vickers
Safer Stronger Communities Alan Madin Cllr. De
Freitas
Healthier Communities Julie Ogley Cllr. Hocknell
Older People John Garrett Cllr. Mills
Children Young People Andy Samson Cllr.
Cracknell


Joint Area Review (JAR)
Youth Service
YOT
CMT/JMB
37
CPA Programme PlanKey Dates
38
Corporate Assessment (CA)
  • Key lines of enquiry (KLoE)
  • The questions that are set out by the Audit
    Commission
  • The questions that need to be answered by the
    Council
  • Summary and much more detailed version
  • Q1. What is the council, together with its
    partners, trying to achieve?
  • Theme 1 Ambition for the community
  • Theme 2 Prioritisation
  • Q2. What is the capacity of the council,
    including its work with partners, to deliver what
    it is trying to achieve?
  • Theme 3 Capacity
  • Theme 4 Performance management

39
Corporate Assessment (CA)
  • Q3. What has been achieved?
  • Theme 5 Achievement
  • Sub-theme 5.1 Summary of Achievements
  • Sub-theme 5.2 Sustainable Communities and
    Transport
  • Sub-theme 5.3 Safer and Stronger Communities
  • Sub-theme 5.4 Healthier Communities
  • Sub-theme 5.5 Older People
  • Sub-theme 5.6 Children and young people
  • 5.6 will be tested by the Joint Area Review
    inspection

40
The Scoring System
41
Setting the Scene
  • Set-up meeting
  • Discuss inspection programme
  • Agree return of documentation
  • Brief the Council and Partners about the scope
  • Self assessment
  • Stakeholder Surveys

42
On-site Work
  • Analysis (up to one week 18th - 20th December and
    8th 10th January)
  • Analyse full range of inspection findings
  • Read local plans
  • Review CA and JAR Self Assessment
  • Performance assessments and inspections
  • Tour of North East Lincolnshire

43
On-site Work
  • Fieldwork (2 weeks 22nd January 2nd February
    2007)
  • Range of interviews with senior members and
    officers
  • Focus groups with middle managers, frontline
    staff and partnerships
  • Initial feedback

44
Reports and Feedback
  • Draft report beginning of March
  • Council opportunity to feedback on report
  • Final Report late April
  • Feedback Meeting
  • Published report mid May

45
How will you be involved?
  • By delivering the Councils priorities and
    achieving continuous improvement in the work you
    do within your services
  • Producing information and evidence for the
    inspection
  • Taking part in interviews and focus groups
  • May come into contact with the inspectors whilst
    they are onsite

46
Things to remember
  • We must tell our story using outcomes and impact
  • We all have to communicate the story
  • We are judged on what our stakeholders think of
    us
  • We (and all our stakeholders) have to be clear on
    what we are and what we are not doing
  • Our golden thread is important
  • We have to evidence value for money
  • We will also be judged on the inspectors
    experience

47
NORTH EAST LINCOLNSHIRECPA TEAM CONTACT DETAILS
  • CPA TEAM
  • Telephone 01472 323701
  • E-mail cpateam_at_nelincs.gov.uk

48
Joint Area Review2006/2007
49
A Reminder
  • Judges the outcomes for children and young people
    growing up in the local area
  • Evaluate how local services work together to
    contribute to the their achievements, progress
    and well-being

50
Joint Area Review Focus
  • Covers universal, preventive and targeted
    services
  • Pays particular attention to children and young
    people who are vulnerable
  • Examines how local services gather and respond to
    views of users, parents and carers and ensure
    they involve children and young people

51
IT AFFECTS EVERYONE WORKING WITH CHILDREN AND
YOUNG PEOPLE IN NORTH EAST LINCOLNSHIRE
52
The Inspectorates involved in our JAR
  • Office for Standards in Education (Lead)
  • Healthcare Commission
  • Adult Learning Inspectorate
  • HM Inspectorate of Probation
  • Commission for Social Care Inspection
  • Audit Commission

53
What we know (1)
  • Initial areas for fieldwork
  • Healthy lifestyles are promoted for children and
    young people (1.2)
  • Action is taken to promote children and young
    peoples mental health (1.4)
  • Children and young people are provided with a
    safe environment (2.2)
  • The incidence of child abuse and neglect is
    minimised (2.3)
  • Action is taken to ensure that educational
    provision is of good quality (3.3)
  • Educational provision is made for children who do
    not attend school (3.5)

54
What we know (2)
  • Children and young people particularly those from
    vulnerable groups are supported in managing
    changes and responding to challenges in their
    lives (4.2)
  • Children and young people with LDD are helped to
    make a positive contribution (4.7)
  • Action is taken to ensure that 14 19 education
    and training is planned and delivered in a
    co-ordinated way, and to ensure that education
    and training (16 19) is of good quality (5.3)

55
What we know (3)
  • The inspectors will also focus on the following
    issues
  • Quality of strategic leadership and management
  • Extent to which intervention has strengthened
    strategic leadership and management
  • Impact upon outcomes for children and young
    people
  • Effectiveness of partnership working on improving
    outcomes for vulnerable groups (including LDD,
    LAC, teenage mothers, pregnant school girls,
    children with mental health issues, young
    offenders and black and minority ethnic groups)
  • Strategy for improving outcomes for children and
    young people specifically 11 19 years
  • Effectiveness of social inclusion strategy
    equality and diversity, racism and bullying,
    access to education other than at school

56
What we know (4)
  • East Marsh is the Neighbourhood Study area
  • The programme will include
  • Visits to provision and initiatives
  • Meetings with people working in the area
  • Meetings with children and young people living
    and using services in the area
  • The inspectors will want to know what life is
    like in the neighbourhood
  • Visits will be made outside of this area in the
    wider JAR Programme

57
What we know (5)
  • 10 Cases have been selected for tracking during
    the JAR
  • This involves
  • Completion of case file questionnaires
  • Inspector(s) reading the files, meeting those
    working on the case and with the child / young
    person, parents, carers and families
  • Others will be randomly selected for review
    during the inspection

58
Self Assessment and Evidence
  • Self Assessment drafted and circulated for
    consultation (deadline for comments 17th November
    2006)
  • Supporting document of case studies also
    submitted
  • Evidence collection
  • Submission date - 24th November 2006

59
On-site work
  • Analysis (18th 20th December and 8th 10th
    January)
  • Analyse full range of inspection findings
  • Read local plans
  • Review JAR Self Assessment
  • Performance assessments and inspections
  • Case tracking
  • Review of Surveys (e.g. schools, staff,
    residents)

60
On-site work
  • Fieldwork - 22nd January to 2nd February
  • Neighbourhood study (2/3 days of first week)
  • Range of meetings and visits
  • Range of focus groups
  • Case tracking meetings (lead professionals and
    associate agencies, children and young people)

61
Communications
  • Communication mechanisms in place (Briefing
    notes, JAR website, team meetings, supervision
    meetings)
  • You have a responsibility to use the mechanisms
    to keep up to date
  • If you want to know more .. ASK

62
Key dates
  • Set-up Meeting 9th October
  • Submission of Self Assessment 27th November
  • Analysis 18th and 19th December AND 8th, 9th
    and 10th January
  • Fieldwork 22nd January to 2nd February
  • Publication of Report 14th May (estimate)

63
North East Lincolnshire JAR Preparation
TeamContact Details
  • Telephone 01472 323256
  • E-mail Jar.InspectionTeam_at_nelincs.gov.uk
  • Visit the JAR website at www.nelincsjar.org.uk

64
Children and Young Peoples Plan 2007 -2010
65
  • Feedback on the first CYPP was put into the
    September Linc Magazine.
  • A young persons version was circulated with a
    questionnaire to the Democracy Day on 19 October.
  • There will be a wider circulation into schools,
    libraries, leisure centres, all council reception
    points, doctors surgeries, all Childrens
    Services web sites and partners web sites.
  • Participation Group has commissioned Connexions
    to carry out consultation in by training young
    people to go out and interview young people on
    film. The Premier of the film is to be shown on
    5 December at the Whitgift Film theatre.
  • .

66
  • Questionnaires are going out to professionals and
    children and young people week commencing 20th
    November.
  • Review of the 2006-7 Needs Analysis is currently
    taking place.
  • First draft copy of the 2007-10 CYPP will be
    ready for consultation in January.
  • Final copy will be ready in April 2007

67
Childrens Trusts
68
  • Bring together all organisations involved with
    providing services to children and young people
    in an area from hospitals and schools, to police
    and voluntary groups, to cooperate and focus on
    improving outcomes for all children and young
    people.
  • People will begin to work in multi-disciplinary
    teams and children and young people will begin to
    receive more integrated services.
  • Professionals will be trained jointly to tackle
    cultural and professional divides and will be
    supported by integrated processes.

69
  • As services become more integrated a central
    point of contact (a lead professional) will be
    provided to children and families receiving
    services. Professionals may also be located
    together, in Extended Schools or Children's
    Centres.
  • North East Lincolnshire Council and their partner
    organisations are moving towards a Childrens
    Trust by beginning to work in new ways, sharing
    information and working together, to protect
    children and young people from harm and help them
    achieve what they want in life.

70
  • A Childrens Trust for North East Lincolnshire
  • Workshops are being held with the Change for
    Children Board to establish how we can deliver
  • Integrated frontline delivery
  • Integrated processes
  • Integrated strategy
  • Inter-agency Governance
  • The second workshop will be held on 23 November
    2006. From that a partnership agreement will be
    established between all partners including
    health, police, Connexions, Learning and Skills
    Council and Childrens Services.
  • An action plan has been developed and is already
    in place with final arrangements to be in place
    by 31 August 2007.

71
Restructure
72
Accommodation Moves
73
School Reorganisation
74
  • Submission to BSF sent 13 October 2006
  • NELC bidding for place in Wave 5, decision
    December
  • School places how will BSF address surplus
    places?
  • Current national thinking organisation and
    efficiency 900 to 1200 pupils (6 and 7 form
    entry)
  • Need to relate the size of new schools to a form
    of entry to deliver efficiency.

75
(No Transcript)
76
Strategy for Reducing Surplus Places
  • Commitments
  • Immingham School Rebuilt as academy
  • Wintringham School rebuilt as academy
  • Rebuilding of Hereford Technology School under
    Targeted Capital Fund Western School closure
    effective September 2008
  • Other Commitments
  • Havelock School rebuilt as academy
  • Funding based on estimated 2016 numbers and
    existing area of school estate
  • .

77
  • Informal consultation taking place until December
    2006
  • Report to Cabinet January 2007
  • Statutory notices (if appropriate) January to
    March 2007
  • School Organisation Committee (if appropriate)
    April 2007
  • Conference of Learning autumn 2006 build on
    strategy for change
  • Consultation on role of ICT in new forms of
    teaching and learning
  • Headteachers to be involved through project
    management arrangements and Children and Young
    Peoples communications board

78
Dates of next meetings
15th March 2007 2pm to 3.30pm16th March 2007
10am to 11.30am
Write a Comment
User Comments (0)
About PowerShow.com