2003 2004 GEORGIA FARM BUREAU TOBACCO COMMODITY MEETING - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

2003 2004 GEORGIA FARM BUREAU TOBACCO COMMODITY MEETING

Description:

2003 2004 GEORGIA FARM BUREAU TOBACCO COMMODITY MEETING – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 23
Provided by: cpesPe
Category:

less

Transcript and Presenter's Notes

Title: 2003 2004 GEORGIA FARM BUREAU TOBACCO COMMODITY MEETING


1
2003 2004GEORGIA FARM BUREAU TOBACCO COMMODITY
MEETING
  • University of Georgia
  • TOBACCO TEAM
  • http//www.georgiatobacco.com

2
2003 GEORGIA TOBACCO
3
2003 MH Residues
4
Alternative Sucker Control Programs
C contact, Royaltac M, Off Shoot-T, Sucker
Plucker, Fair 85 MH maleic hydrazide, Royal MH
30, Sucker Stuff, Fair 30 P flumetralin,
Prime, FluPro ( ) tankmixed, first
contact 30 to 40 plants are at early button
stage.
5
2003 Sucker Control Treatments
6
2003 Sucker Control Results
Avg. 8 Co.
7
Using a CO2 Meter To Determine Cracked Heat
Exchangers
http//www.cpes.peachnet.edu/tobacco/Detection.htm
8
Heat Exchangers 2 4 years old
9
ExhaustNOx CO2
CO2 Meters
10
Reasons for measuring CO2?
  • By-product of combustion ( gt1ppm)
  • Equipment warranty, cost and complexity
  • Many existing commercially available meters
  • Simple and direct process
  • Portable instrumentation

http//www.vaisala.com/page.asp?Section5707
11
Direct Fired LP 5,400 9,000 ppm CO2 Pilot
Light Only 700 ppm CO2
12
Heat Exchanger
Direct Heat System
Heat Exchanger Barn
13
Insert Probe in Curing Air stream after Heat
Exchanger
14
Barn Testing Procedure
  • Measure Ambient CO2 after 5-10 minutes
  • Set thermostat 30-40oF above outside air
    temperature (maximum 140oF)
  • Measure CO2 after 5-10 minutes

15
Detecting Heat Exchanger Leaks
  • Examine combustion
  • chamber and all
  • welds.
  • Remove heat
  • exchanger and
  • examine closely
  • (Bright flash light)

16
http//www.cotronics.com/vo/cotr/promotion.htm
Check all exhaust flue connections within curing
chamber
Use high temperature sealant- 2,300oF to
repair/patch?
17
Stack height should be 24 inches above the
highest point of roof line
Repair Flue Pipes
18
TSNA RESULTS 2003
19
Barn Rothigh TSNAs
20
(No Transcript)
21
(No Transcript)
22
Non-Tobacco Related Foreign Material
Write a Comment
User Comments (0)
About PowerShow.com