Title: SeaDataNetDesign Study Proposal
1SeaDataNet-Design Study proposal
IIIrd SeaSearch Full Group Meeting Limassol,
Cyprus Tuesday May 25-27, 2004
2Rationale and overall objectives
- The key of the success of scientific and
technical oceanographic projects are the speed
and the ease, which wich users can identify,
locate, access exchange and use marine data and
information - SeaDataNet infrastructure aims to integrate and
develop, in the context of new communication
technology, past actions undertaken to secure,
standardize and make available Pan-European
marine data, meta-data and products.
3SEADATANET Long Term Key Objectives
- To give an easy access to marine data currently
collected by hundredths of organisations under as
many different systems - To construct a standardized system for managing
the large and diverse data sets collected by the
oceanographic fleets and the new automatic
observation systems. - To prepare synthetic value added information
products
4SeaDataNet concept
- Based on a semi-distributed model that
incorporates, but enhances, the currently
existing infrastructures and technology - Networking of the data centres in a unique
virtual data management system to provide on-line
access to integrated data sets from the various
sources. - Development of common standards based on ISO19115
and Marine XML - Use of the most adapted communication technology.
5Steps of development
- The project presents several technical and
organizational challenges, which make necessary
to progress by steps to get a fully operational
system - Design Study
- Development and start of System Implementation
- Operation and Maintenance of the system on
routine mode, with adaptability to other new
observations and new technologies
6Step 1 SeaDataNet-Design Study
- Full title Pan-European infrastructure for Ocean
Marine Data management Design Study for on
line integrated data access to distributed
heterogeneous systems - Specific objective to prepare a blue print for
the infrastructure, to create a prototype portal,
organize and test the networking, to explore
expansion of the network from NODCs to other
major institutes, and to report on feasibility,
expected costs and funding options, nationally
and internationally - Submitted March 2004 proposal reference
number FP6-011990
7Design Study Partnership 42 partners from 35
countries
8SeaDataNet-DS Workpackages
- WP1 Management
- WP2 Prototyping of the software components
- WP3 Standards
- WP4 Data and products Benchmark
- WP5 Market Research
- WP6 Financial planning and funding
- WP7 Preparation of the implementation and
operation plan
9WP 1 Project Management
10WP2 Prototype architecture
User portal
User portal
SeaDataNet-DS Virtual Private Network
Normalization Interface
Normalization Interface
Normalization Interface
Normalization Interface
Normalization Interface
Baltic Database
North-EastAtlantic Database
EasternMediterranean Database
Black Sea Database
WesternMediterranean Database
E-Mediterranean Node
Black-Sea Node
W-Mediterranean Node
NE-Atlantic Node
Baltic Node
11System viewed from the data manager side
ReplicatedCommonCatalogue
Updatebroadcast
ReplicatedCommonCatalogue
NearestReplicatedCommonCatalogue
ReplicatedCommonCatalogue
SeaDataNet-DS Virtual Network
ReplicatedCommonCatalogue
Checkingtagginginsert
12System viewed from the user side
Local normalization interfaces
SeaDataNet-DS Virtual Data Network
User
User portal
NearestReplicatedCommonCatalogue
13WP2 Prototyping of the software components
14WP3 Standards
15WP4 Benchmark Data Products
16WP5 Marine Data Marketing
17WP6 Financial Planning Funding
18WP7 Implementation Plan
19Steering Committee
Organisation monitoring
Advisory Board
Standards Quality Assurance
Prototype technical analysis development
Financialplanning and fundingexploration
Prototype data, metadataand product
benchmarkingstudy
MarketResearch
Fig.5 SEADATANET-DS Management Tasks
Organization
20Budget requested
- shared cost project
- total budget 5.4 M
- 2.7 M requested to EC
- the tables in the proposal indicate the
calculations by tasks and partners according to
the kind of tasks and institutes (FC or SC) and
the way the overheads should be included - As the total should be no more than total
budget/2., it has been necessary to apply some
general reduction coefficient about 0.8 on the
tasks costs. - Final budget proposed in form A3
21Next steps
- June EC project review
- July reviewers comments ?
- Fall contract negociation or resubmission ?
- information will be dissemnated as soon as
received - to the mailing list (official coordinators )
- on the project web site
- WWW.seadatanet.org