SeaDataNetDesign Study Proposal - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

SeaDataNetDesign Study Proposal

Description:

Black-Sea. Node. Normalization. Interface. Baltic. Database ... Black Sea. Database. Normalization. Interface. Western. Mediterranean. Database. Baltic Node ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 22
Provided by: catherine215
Category:

less

Transcript and Presenter's Notes

Title: SeaDataNetDesign Study Proposal


1
SeaDataNet-Design Study proposal
IIIrd SeaSearch Full Group Meeting Limassol,
Cyprus Tuesday May 25-27, 2004
2
Rationale and overall objectives
  • The key of the success of scientific and
    technical oceanographic projects are the speed
    and the ease, which wich users can identify,
    locate, access exchange and use marine data and
    information
  • SeaDataNet infrastructure aims to integrate and
    develop, in the context of new communication
    technology, past actions undertaken to secure,
    standardize and make available Pan-European
    marine data, meta-data and products.

3
SEADATANET Long Term Key Objectives
  • To give an easy access to marine data currently
    collected by hundredths of organisations under as
    many different systems
  • To construct a standardized system for managing
    the large and diverse data sets collected by the
    oceanographic fleets and the new automatic
    observation systems.
  • To prepare synthetic value added information
    products

4
SeaDataNet concept
  • Based on a semi-distributed model that
    incorporates, but enhances, the currently
    existing infrastructures and technology
  • Networking of the data centres in a unique
    virtual data management system to provide on-line
    access to integrated data sets from the various
    sources.
  • Development of common standards based on ISO19115
    and Marine XML
  • Use of the most adapted communication technology.

5
Steps of development
  • The project presents several technical and
    organizational challenges, which make necessary
    to progress by steps to get a fully operational
    system
  • Design Study
  • Development and start of System Implementation
  • Operation and Maintenance of the system on
    routine mode, with adaptability to other new
    observations and new technologies

6
Step 1 SeaDataNet-Design Study
  • Full title Pan-European infrastructure for Ocean
    Marine Data management Design Study for on
    line integrated data access to distributed
    heterogeneous systems
  • Specific objective to prepare a blue print for
    the infrastructure, to create a prototype portal,
    organize and test the networking, to explore
    expansion of the network from NODCs to other
    major institutes, and to report on feasibility,
    expected costs and funding options, nationally
    and internationally
  • Submitted March 2004 proposal reference
    number FP6-011990

7
Design Study Partnership 42 partners from 35
countries
8
SeaDataNet-DS Workpackages
  • WP1 Management
  • WP2 Prototyping of the software components
  • WP3 Standards
  • WP4 Data and products Benchmark
  • WP5 Market Research
  • WP6 Financial planning and funding
  • WP7 Preparation of the implementation and
    operation plan

9
WP 1 Project Management
10
WP2 Prototype architecture
User portal
User portal
SeaDataNet-DS Virtual Private Network
Normalization Interface
Normalization Interface
Normalization Interface
Normalization Interface
Normalization Interface
Baltic Database
North-EastAtlantic Database
EasternMediterranean Database
Black Sea Database
WesternMediterranean Database
E-Mediterranean Node
Black-Sea Node
W-Mediterranean Node
NE-Atlantic Node
Baltic Node
11
System viewed from the data manager side
ReplicatedCommonCatalogue
Updatebroadcast
ReplicatedCommonCatalogue
NearestReplicatedCommonCatalogue
ReplicatedCommonCatalogue
SeaDataNet-DS Virtual Network
ReplicatedCommonCatalogue
Checkingtagginginsert
12
System viewed from the user side
Local normalization interfaces
SeaDataNet-DS Virtual Data Network
User
User portal
NearestReplicatedCommonCatalogue
13
WP2 Prototyping of the software components
14
WP3 Standards
15
WP4 Benchmark Data Products
16
WP5 Marine Data Marketing
17
WP6 Financial Planning Funding
18
WP7 Implementation Plan
19
Steering Committee
Organisation monitoring
Advisory Board
Standards Quality Assurance
Prototype technical analysis development
Financialplanning and fundingexploration
Prototype data, metadataand product
benchmarkingstudy
MarketResearch
Fig.5 SEADATANET-DS Management Tasks
Organization
20
Budget requested
  • shared cost project
  • total budget 5.4 M
  • 2.7 M requested to EC
  • the tables in the proposal indicate the
    calculations by tasks and partners according to
    the kind of tasks and institutes (FC or SC) and
    the way the overheads should be included
  • As the total should be no more than total
    budget/2., it has been necessary to apply some
    general reduction coefficient about 0.8 on the
    tasks costs.
  • Final budget proposed in form A3

21
Next steps
  • June EC project review
  • July reviewers comments ?
  • Fall contract negociation or resubmission ?
  • information will be dissemnated as soon as
    received
  • to the mailing list (official coordinators )
  • on the project web site
  • WWW.seadatanet.org
Write a Comment
User Comments (0)
About PowerShow.com