Title: Division Combat Engineer Operational Advisory Group DCEOAG
1Division Combat EngineerOperational Advisory
Group(DCEOAG)
- Ground Board Brief
- 22 Sept 2004
2DCEOAG
- Last meeting 24 - 26 August at 4th CEB
- New members
- LtCol Robert Couser, 1st Combat Engr Bn
- LtCol David Ottignon, 2nd Combat Engr Bn
- Agenda Items
- Funding Priorities
- Engineer FSRG Initiatives
- Engineer Squad Vehicle
- Engineer mobility/survivability
- Engineer/EOD Improvised Explosive Devices
-
3Funding Priorities
- Discussion
- ABV at Milestone C
- AN/PSS-14 qualified as material solution to AMD
ORD - EAB is on the POM-06 GCE ARL potential
decrement to the program - Family of Engineer Tool Sets/Kits/Chests
- Recommendation
- Continue support for Core Funding of ABV and AMD
- Support FY07 PMC funding for EAB
- Support PR07 funding for Engineer Tool Sets
-
4Engineer FSRG Initiative
- Discussion
- Designed to divest and reinvest structure.
- Engineer Community
- Water and Hygiene migrate to FSSG
- Power generation and maintenance migrate to
HqSvcBn, Div - Divest 1/43 from Engr Supt Co (17 critical 13XX
MOS skills) - Growth of additional infantry battalions does not
include additional 1371 structure to support - Growth of LD/HD skill sets EOD
- Recommendation
- Non-concur with divesting 13XX MOS from Engr Supt
Co - Support growth of additional EOD structure
5Engineer Squad Vehicle
- Discussion
- UNS for ESV not in CDTS
- Reevaluated position Near/Long term approach
- Near Term
- Evaluate current Engineer Hardened Vehicle
- T/E substitution to increase number of D1159
vehicles in CEB for D1158 - Long Term
- Resubmit UNS for ESV to articulate engineer
requirements for a ESV as a variant of MEFV - Recommendation
- Support T/E change to substitute (12) D1158 with
(12) D1159 - Support concept of engineer variant of the MEFV
- DCEOAG identify engineer requirement for MEFV to
DWG
6Engineer Mobility/Survivability
- Expeditionary Assault Bridge
- Currently on the POM 06 GCE ARL
- Leverages simple integration
- Armored Combat Excavator (ACE) M9
- DCEOAG validated current T/E for M9 ACE
- IROAN vs. Army SLEP
- Recommendation
- Support FY07 PMC for EAB prototype
- Support continued IROAN for ACE
7Engineer/Explosive Ordnance Disposal
- Discussion
- Lack of resources to solve the Destruction of
Captured Enemy Ammunition (CEA) Improvised
Explosive Devices (IED) - No formal directed instruction for handling CEA
or IED - Center piece issue Risk tolerance
- Recommendation
- Recommend MCCDC study the feasibility for
advanced training for selected 1371s to handle
conventional ordnance - Support for additional structure for EOD
community
8Summary/Recommendation
- Key Issues
- FSRG Initiative
- Engineer/EOD
- Key Recommendations
- Support funding issues
- FSRG
- Support additional structure EOD
- Non Concur with divesting 13XX from Support
Company - Support T/E change to substitute (12) D1158 with
D1159 - MCCDC study feasibility for advanced training for
selected 1371s to handle conventional ordnance
9Backup Slides
10Current TOE for CEB
11FSRG Proposed TOE for CEB
12Adjusted ASG to FSRG
13Micro Schedule
14Advanced Mine Detector
DESCRIPTION The AMD is a battery operated,
handheld mine detection device consisting of a
battery pack, hand held wand with controls,
metallic and GPR sensors. It will provide the
Advanced Mine Detector capability.
- PROGRAM STATUS
- Conduct LUE 4th Qtr FY04
- Production/Fielding Decision
- 1st Qtr FY05
- Cyterra Orlando, FL
- AAO 582
MILESTONE SCHEDULE
15Hardened Engineer Vehicle
Description The HEV is an armored truck with a
V-shaped hull designed to withstand both AP and
AT mine blasts. The armor provides protection
from 7.62 mm, and airburst and side fragmentation
from 155mm and below. The EOD variant is a 4x4
and the Engineer Variant is a 6x6. Both variants
will have an NBC overpressure system, VRC-88 with
amp, and a 240G machine gun mount.
- Contract Description
- MCSC Urgent UNS procurement
- Obtain and Field in September December 2004
- Quantity on Contract 14 systems, 9EOD
variants, - 5Engineer Variants
- Prime Contractor Force Protect Inc,
TSG - Contracting Method Sole Source, Urgent
and Compelling, GSA - Contract Type FFP
- Original Contract FFP
- Contract Agency MCSC
- HEV Data
- Weight 14000-28000 Lbs (4x4 6x6)
- Length 228 Inches
- Width 94 Inches
- Height 91 Inches
- Engine Caterpillar
16EAB Multiple Use Platform
Existing MLC 70 Bridge
New Launcher
Blade (CDB, RORS, SMP)
Existing M1A1 Chassis
SUPPLEMENTS ABV CAPABILITY
17Acquisition Strategy
- Leverage FCT activities to facilitate integration
of launcher on an M1A1 chassis - FY-05 Equipment MOD
- No Change to Bridge
- MOD M1 Chassis
- Add blade kit/high lift adapter
- Integrate new launcher
- FY-06
- PRPs (2)
- FY-07 FY-11
- Full rate production/fielding
- Production Run 20 EABs