ImobilizariPlus Solutia Pentru Mijloace Fixe - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

ImobilizariPlus Solutia Pentru Mijloace Fixe

Description:

CostCentersPlus incorporates the best ... CostCentersPlus - Dynamic Report Layouts ... The database software is free of charge. Database Express Edition ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 12
Provided by: danse8
Category:

less

Transcript and Presenter's Notes

Title: ImobilizariPlus Solutia Pentru Mijloace Fixe


1
CostCentersPlus Your Complete Solution for Cost
Analysis and Control (release 2.0B) - Overview
- Onesimus Quality Solutions, Quality
Services http//www.onesimus.ro
2
Overview
  • CostCentersPlus is a feature-rich variance
    analysis solution with a polished user interface.
  • CostCentersPlus incorporates the best practices
    and newest technologies to provide the required
    functionality for you to analyze and control your
    cost structures in the most effective way
    possible.

3
Understanding Variance Analysis
  • Many businesses, especially the small,
    entrepreneurial kind, ignore or forget the other
    half of the budgeting.
  • Budgets are too often proposed, discussed,
    accepted, but then forgotten.
  • Variance analysis looks after-the-fact at what
    caused a difference between plan vs. actual.
  • Good management looks at what that difference
    means to the business.
  • CostCentersPlus provides a new way of looking at
    the plan vs. actual data that owners and managers
    need to perform that critical variance analysis.

4
With CostCentersPlus you can
  • perform flexible variance analyses
  • perform period-over-period comparisons
  • break down your analyses by debit and credit

5
With CostCentersPlus you can
  • generate meaningful ratio calculations (actual
    figures prorated to actualplanned) as well as
    intuitive dashboard indicators for ratios, and
    top-down bar charts for variances (hot-linked for
    instant drill-down)

6
With CostCentersPlus you can
  • start with a high level inspection of costs, then
    drill down, or start at a lower level and drill
    up using cost center and cost element hierarchies
    that you are already familiar with from working
    with your ERP solution. Both the cost center and
    cost element hierarchies are expandable and
    collapsible independently of each other, allowing
    you to determine the depth of detail desired

7
CostCentersPlus - Dynamic Report Layouts
8
CostCentersPlus - Easy To Use - Instant Results
  • The amounts in each report cell are dictated by
    the intersection of the cost center (group) and
    cost element (group) selected.
  • By drilling down (or up) into any combination of
    cost center (group) and cost element (group) in
    the hierarchies, the report will determine the
    costs associated with that selection and refresh
    the screen accordingly.

Drill Up Both Hierarchies
Drill Up Cost Element Hierarchy
Drill Down
Drill Up Cost Center Hierarchy
Refresh Only Dial Charts - Get Values From Here
9
CostCentersPlus - Other Advantages
  • CostCentersPlus is available in your currency of
    choice.
  • The database software is free of charge.

Database Express Edition
10
Final Notes
  • Although variance analysis can be very complex,
    the main guide is common sense.
  • Going under budget is a positive variance, and
    over budget is a negative variance, but positive
    variances aren't always good news.
  • For example, positive variances in advertising in
    February mean that money has not been spent, but
    they also mean that advertising has not been
    placed.
  • Product sales are below expectations for this
    same period.
  • Could the advertising missed in February be a
    possible cause?
  • Yes, of course it could.

11
Final Notes
  • Every variance should stimulate questions.
  • Why did one project cost more or less?
  • Were objectives met?
  • Is a positive variance a cost saving or a failure
    to implement?
  • Is a negative variance a change in plans, a
    management failure, or an unrealistic budget?
  • A variance table like the one CostCentersPlus
    offers can provide management with significant
    information.
  • Without this data, some of these important
    questions might go unasked.
Write a Comment
User Comments (0)
About PowerShow.com