Title: ImobilizariPlus Solutia Pentru Mijloace Fixe
1 CostCentersPlus Your Complete Solution for Cost
Analysis and Control (release 2.0B) - Overview
- Onesimus Quality Solutions, Quality
Services http//www.onesimus.ro
2 Overview
- CostCentersPlus is a feature-rich variance
analysis solution with a polished user interface. - CostCentersPlus incorporates the best practices
and newest technologies to provide the required
functionality for you to analyze and control your
cost structures in the most effective way
possible.
3 Understanding Variance Analysis
- Many businesses, especially the small,
entrepreneurial kind, ignore or forget the other
half of the budgeting. - Budgets are too often proposed, discussed,
accepted, but then forgotten. - Variance analysis looks after-the-fact at what
caused a difference between plan vs. actual. - Good management looks at what that difference
means to the business. - CostCentersPlus provides a new way of looking at
the plan vs. actual data that owners and managers
need to perform that critical variance analysis.
4 With CostCentersPlus you can
- perform flexible variance analyses
- perform period-over-period comparisons
- break down your analyses by debit and credit
5 With CostCentersPlus you can
- generate meaningful ratio calculations (actual
figures prorated to actualplanned) as well as
intuitive dashboard indicators for ratios, and
top-down bar charts for variances (hot-linked for
instant drill-down)
6 With CostCentersPlus you can
- start with a high level inspection of costs, then
drill down, or start at a lower level and drill
up using cost center and cost element hierarchies
that you are already familiar with from working
with your ERP solution. Both the cost center and
cost element hierarchies are expandable and
collapsible independently of each other, allowing
you to determine the depth of detail desired
7 CostCentersPlus - Dynamic Report Layouts
8 CostCentersPlus - Easy To Use - Instant Results
- The amounts in each report cell are dictated by
the intersection of the cost center (group) and
cost element (group) selected. - By drilling down (or up) into any combination of
cost center (group) and cost element (group) in
the hierarchies, the report will determine the
costs associated with that selection and refresh
the screen accordingly.
Drill Up Both Hierarchies
Drill Up Cost Element Hierarchy
Drill Down
Drill Up Cost Center Hierarchy
Refresh Only Dial Charts - Get Values From Here
9 CostCentersPlus - Other Advantages
- CostCentersPlus is available in your currency of
choice. - The database software is free of charge.
Database Express Edition
10 Final Notes
- Although variance analysis can be very complex,
the main guide is common sense. - Going under budget is a positive variance, and
over budget is a negative variance, but positive
variances aren't always good news. - For example, positive variances in advertising in
February mean that money has not been spent, but
they also mean that advertising has not been
placed. - Product sales are below expectations for this
same period. - Could the advertising missed in February be a
possible cause? - Yes, of course it could.
11 Final Notes
- Every variance should stimulate questions.
- Why did one project cost more or less?
- Were objectives met?
- Is a positive variance a cost saving or a failure
to implement? - Is a negative variance a change in plans, a
management failure, or an unrealistic budget? - A variance table like the one CostCentersPlus
offers can provide management with significant
information. - Without this data, some of these important
questions might go unasked.