Title: Produced Water Treatment The CTour technology
1Produced Water TreatmentThe CTour technology
by Rolf Thorkildsen ProPure AS
01.05.06 Houston
2AGENDA
- Produced water
- The CTour technology
- History
- Status 2006
3PRODUCED WATER
- During production of oil gas, water is
separated and emitted to sea (main method) - Mature fields, watercut of 50-80
- Increasing global environmental problem
- Water treatment, bottleneck in the production
- New regulations in the Northsea (OSPAR )
- Zero harmfull emission to sea in the Norwegian
sector from 2006 - Increasing global interest for treatment
technologies for produced water -
- OSPAR (Convention for the Protection of the
Marine Environment of the North-East Atlantic)
4PRODUCED WATER
Oil water production (prognosis from
2004) Norwegian sector (source, Norwegian
Petroleum Directorate )
5PRODUCED WATER - CTOUR
- Concidered the best available technology for
cleaning large amounts of produced water to very
low hydrocarbon concentrations
Unique
Simultaneous Removal of Dispersed and Dissolved
Hydrocarbons
6TECHNOLGY THE PROCESS
- Reduces OiW discharge to 1-5 ppm (feed OiW 200
-1000 ppm) - Removes the dissolved fraction of the following
aromatic hydrocarbon contaminants (up to 95 ) - BTEX (Benzene, Toluene, Ethyl benzene, Xylene)
- SVOC (Soluble Volatile Oil Components)
- - naphtalenes
- - PAHs (poly aromatic hydrocarbons)
- - alkyl phenols
-
7TECHNOLOGY- THE PROCESS
Gas
Oil from wells
(principle drawing)
Oil
1.stage separator
Injection of condensate
Reject stream back to main process
CTour inj. mixing unit
Produced water 200-1000ppm
Hydrocyclone
- hydrocarbon contaminants are extracted by
condensate, oil and condensate droplets
coalesces
- the condensate is separated in the hydrocyclone
and routed back to main process
Treated water 1-5 ppm to sea
15-40 ppm to sea
8TECHNOLOGY THE MIXERS
CTOUR INJECTION MIXING UNIT
INJECTION UNIT
MIXING UNIT
The heart of the system.
9TECHNOLGY- REFERENCES
FIELD STATUS Statfjord A,B C Contract with
CTour June 2004 Statoil CTour in operation on
Statfjord C Full scale implementation of CTour
ongoing (A, B)
The field will produce above 1,2 mill bpd of water
10TECHNOLOGY - REFERENCES
- Snorre A, Statoil
- Contract with CTour May 2005
- Full scale implementation ongoing
- Approx.300.000 bpd
-
- Ekofisk 2/4-J ConocoPhillips Norway
- Contract with CTour September 2005
- Full scale implementation of CTour ongoing
- Approx.300.000 bpd
- Åsgard A, Statoil Successful offshore testing
2005 - Waiting for increasing water production
-
11HISTORY
Merges with ProPure Name changes to ProPure
2006
1995 Idea patent Int.Research Inst.
of Stvgr. Inge Brun Henriksen (inventor)
1997 The company CTour registered
2003 Successful testing Statoil
provides capital and buy shares Commercialication
decided
2004 Further dev. of the company Achieves first
contract Pure Process Solutions established
Important partners during development
12STATUS 2006
PURE GROUP
ENERGI VEKST
Exp.revenue 2006, 30mill Approx. 55
employees Plans for further expansion
ENERGI VEKST
TBN
Produced Water Treatment H2S Removal Gas
Treatment Desalting Process packages/systems
Separation/Internals Crude Oil Treating Gas
Membranes Sea-Water Deoxygenation Process
packages/systems
13STATUS 2006
Moscow
Canada
Aberdeen
Azerbaijan
China
Houston
Kuwait
Egypt
India
UAE
Mexico
Oman
Thailand
Vietnam
Philippines
Kuala Lumpur
Singapore
Brunei
Indonesia
COMPANY OFFICE
Brazil
AGENT OFFICE
14Spotlight Technology Award at
OTC 2006 for
The CTour technology