Title: PROFILE


1
PROFILE ACTIVITIESofJAKEDA
  • A Presentation on Jammu and Kashmir Energy Dev.
    Agency
  • (July 2009)

2
INTRODUCTION
  • Set up in the year 1986
  • State Nodal Agency working under Science and
    Technology Department, JK Govt,
  • State level Office headed by CEO, who is assisted
    by Dy CEO at the central level.
  • Two Regional Offices one each at Jammu
    Srinagar, each headed by an officer of the rank
    of Asstt. Chief Executive Officer.

3
OBJECTIVES
  • Promotion and implementation of projects aimed
    at meeting the energy requirements in general and
    un-electrified areas of the state in particular
    by harnessing new and renewable energy sources of
    energy such as solar, wind, biomass and small
    hydro

4
A Quick Review of the Mandate and Activities
undertaken, Potential and future prospects/plans
of the Agency
5
A Quick Review Contd.
6
MNRE Programmes
  • SPV
  • RVE
  • Solar Thermal.
  • Wind
  • Biomass
  • Small Hydro Power.
  • SADP
  • IPA

7
Programs undertaken
  • Solar Photovoltaics
  • Solar Lanterns
  • Solar Home Lighting Systems
  • Solar Power Plants
  • Solar Photovoltaic Pumps
  • Renewable Energy Parks
  • Up-gradation / Dev. Of watermills and Dev of
    Micro Hydel Projects under Small Hydro Power
    Prog. of MNRE
  • I PA
  • Other progs. Sponsored by MNRE
  • (a) Windmills
  • (b) Hybrid Systems
  • (c) Battery Operated Vehicles
  • (d) Gasifiers.

8
THRUST AREAS
  • Database of un-electrified villages/hamlets of
    the state
  • Extension of basic lighting facility to the
    unelectrified villages/hamlets under the RVE
    programme of the MNRE.
  • WRA/ solar - wind hybrid systems.
  • Setting up of State and DLEPs
  • Construction of office complexes of JAKEDA using
    SPA techniques.
  • Implementation of SPV prog including SPPs
  • Development of Model Border Hamlets
  • I PA Prog

9
MoU regarding electrification of remote
un-electrified census villages
  • MoU signed (2007) with MNRE, GoI for
    electrification of all the un-electrified census
    villages/hamlets through RETs during the 11th
    Five Year Plan
  • Jointly signed by DCP, PDD and CEO, JAKEDA on
    behalf of JK Govt and the Secretary, MNRE, GoI
    on behalf of GoI
  • Impt. salient feature - identification all
    un-electrified census villages/hamlets of the
    State in association with the PDD.
  • Identified villages to be subsequently got
    cleared by REC, GoI for their coverage under the
    RVE programme of the MNRE, GoI envisaging 90
    grants.
  • So far 1403 un-electrified census
    villages/hamlets identified.

10
Un-electrified census Villages/Hamlets
identified
11
Un-electrified census Villages/Hamlets (Jammu
Division)
12
Unelectrified census Villages/Hamlets (Kashmir
Region)
13
Unelectrified census Villages cleared/vetted by
REC/MNRE, GoI
14
Unelectrified census Villages cleared/vetted by
REC/MNRE, GoI (Jammu Region)
15
Unelectrified census Villages cleared/vetted by
REC/MNRE, GoI (Kashmir Region)
16
Gujjar Bakerwal basties
17
RVE programme 2003-04 for 50 un-electrified
villages of Kupwara and Kishtwar (erstwhile
Doda) districts
18
RVE programme 2007-08 for 27 un-electrified
villages of tehsil Gurez district Bandipora
19
RVE programme 2008-09 for 68 un-electrified
villages
  • During FY 2008-09, proposal for extension of
    basic lighting facility to 68 un-electrified
    villages under RVE programme submitted to MNRE.
  • Sanction accorded and CFA of Rs.1426.30 lakhs
    approved.
  • Rs 998.41 lakhs (70 of the committed CFA)
    released as 1st installment.
  • POC - December, 2009. Request for extension made
    to MNRE.

20
Salient Features (RVE 2008-09)
  • I. Mode/Technology Option Solar Home Lighting

  • Systems (HLSs), Model
    II of

  • MNRE, GoI
    configuration
  • No. of un-electrified villages 68
  • proposed to be covered under
  • the project
  • No. of Solar Home Lighting 12376 nos.
  • Systems proposed
  • II. Estimated upfront cost of the Project
  • Total cost Rs.1819.27 lakhs
  • MNRE (Ministry of New Rs.1392.30 lakhs
  • Renewable Energy) CFA
  • (Central Financial Assistance)
  • State share Rs.334.15 lakhs
  • Beneficiaries share Rs. 92.82 lakhs
  • III. Project Completion Period Six (06)
    working months

21
Solar Lantern programme of MNRE, GoI
22
Solar Lanterns under BADP
23
Development of Model Border Hamlets under BADP
  • For meeting lighting and cooking energy needs of
    villages (urjagram pattern)
  • Rs.40.00 lakhs approved during fy 2008-09 for
    dev of 02 villages.
  • One village each in Jmu (distt Kathua) and Kmr
    (Tangmarg distt Baramulla)
  • Revalidation reqd for implementation of the
    project during the fy 2009-10

24
SPV Prog of MNRE,
GoISolar Home Lighting Systems
25
SPV of MNRE, GoI Solar
Street Lights
26
CONSTRUCTION OF OFFICE COMPLEXES
  • Srinagar
  • Under Construction at Bemina on SDA alloted land.
  • MNRE accorded sanction for DPR and CFA to the
    extent of 20 cost of the construction under its
    Solar Bldg Prog.
  • Architectural drawings prepared by CAO and
    estimates/DPR being prepared by the CE, PWD
    kashmir.
  • Technical inputs also provided by Dr Bansal VC
    SMVD
  • Complex expected to be constructed in two
    working seasons and likely to be completed during
    the fy 2010-11

27
  • Jammu
  • Land purchased on lease from Wakf Council.
  • Project to be taken up with MNRE for fin support
    soon.

28
WIND ENERGY
  • Two sites sanctioned by MNRE under its WRA prog.
  • Village Ijara,Uri district Baramulla and village
    Bidda, Jyotipuram, district Reasi.
  • Wind monitoring stations at both sites
    commissioned with C-WET collaboration.
  • Wind data recording in progress.
  • 06 more wind stations sanctioned by C-WET/MNRE
    with 80 finance.
  • New WRA sites Banihal, Khadiniyar
    Chandanwari (Baramulla), Gulmarg, Sonamarg,
    Pancheri (Udhmpr), Kundra (Reasi)
  • Five (05) windhybrid systems (46 kW agg
    capacity) sanctioned with 60 central subsidy for
    05 health centres viz Ganderbal, Narbal, Banihal,
    Nowshera, Sunderbani.

29
(No Transcript)
30
SOLAR POWER PLANTS
  • 13 solar power plants sanctioned for 13 health
    centres with upto 75 central funding.
  • Kathua, Samba, Jammu, Rajouri, Poonch, Anantnag,
    Pulwama, Baramulla, Bandipur Kupwara,

31
(No Transcript)
32
STATE LEVEL ENERGY PARK
  • Land provided by JK Floriculture Department at
    Botanical gardens Cheshmashahi, Srinagar for
    SLEEP.
  • DPR submitted to MNRE.
  • Sanction expected soon.

33
ENERGY PARKS (DLEP)
  • S.No. Name of the Institution
    Total estimated Cost CFA
    Institutions Share
  • (Rs.)
    (Rs) (Rs.)
  • Govt. Degree College, 668100
    501000 167100
  • Handwara
  • 2. Govt. Degree College 726000
    544500 181500
  • (Boys), Anantnag
  • St. Josephs School, 657900
    493400 164500
  • Baramulla
  • Govt. Degree College, 668100
    501000 167100
  • Bhaderwah
  • Govt. Degree College, 726000
    544500 181500
  • Kathua
  • Shri Mata Vaishno Devi 733100 549800 183300
  • University, Katra
  • Govt Degree College 573400 430000 143400

34
IP Activities 2008 of MNRE, GoI
  • State Level
  • Funds sanctioned Rs. 5.00 lakhs
  • Funds released Rs.3.50 lakhs
  • Funds utilized Rs.5.30 lakhs
  • District Level
  • Funds sanctioned Rs.21.00 lakhs (Rs.1.50
    lakhs for each district)
  • Funds released Rs.12.00 lakhs

35
AKSHAY URJA SHOPS
  • 10 shops established.
  • Srinagar, Ganderbal, Baramulla, Kupwara,
    Bandipora (Gurez), Anantnag, Kulgam, Budgam,
    Jammu, Kishtawar.

36
UICA PROGRAMME
  • S.No. System/Devices
    Qty Total cost MNRE Share
    (nos) (Rs.)
  • Solar Street Light (74W module
  • 12V, 75AH Lead Acid Battery 20
    5,51,000 2,00,000
  • 11W CFL) installed at Gulmarg
    _at_ Rs. 10,000
  • BIPV system (5kW capacity each)
  • JAKEDA Office, Srinagar 1
  • Tourist Hut, Gulmarg 1
    2 30,00,000 20,00,000
    _at_ 2.00 lakh per kW
  • Solar Power Pack (1 kW capacity)
  • Mehmooda Shaheen Medical Trust/
  • Society, Srinagar 1 1
    3,00,000 1,00,000 _at_ Rs. 1.00
    lakh per kW
  • Total MNRE support
    38,51,000 23,00,000
  • An amount of Rs. 5.75 lakhs (as an advance
    of 25 of the budget support from MNRE) has been
    released.
  • Tenders for procurement of the equipments
    for the sanctioned project have been invited.

37
INCENTIVE ON INSTALLATION OF SOLAR WATER HEATING
SYSTEMS
  • Interest free loan to domestic users, up to 85
    cost , on systems installation
  • Soft Loan _at_ 3 up to 85 on system cost -
    Registered institutions (Non-Profit Making) .
  • Soft Loan _at_ 5 up to 85 on system cost -
    Registered commercial establishments (Profit
    Making) user

38
FOCUSED AREA FOR INSTALLATION OF SOLAR WATER
HEATING SYSTEMS
  • Domestic use
  • Residential education installation
  • Hotels/ Resorts
  • Hospital/Nursing homes
  • Govt. buildings (Residential)
  • Industries

39
Website
  • www.jakeda.nic.in launched on 3.4.2008
  • Envisages profile, mandate and activities of
    JAKEDA
  • Useful links state and central.

40
Projects got sanctioned during the FYs 2007-08
2008-09, their financial implications and
corresponding status ending June 2009
41
Projects got sanctioned during the FYs 2007-08
2008-09, their financial implications and
corresponding status ending June 2009
(continued)
42
Projects got sanctioned during the FYs 2007-08
2008-09, their financial implications and
corresponding status ending June 2009
(continued)
43
Projects got sanctioned during the FYs 2007-08
2008-09, their financial implications and
corresponding status ending June 2009


(continued)
44
Other MNRE programs
  • Small Hydro Prog.
  • Biomass gasification for power generation.
  • SWHSs with capital subsidy
  • Solar Cookers.
  • SPV pumping systems.
  • Grid interactive power plants.
  • Battery operated vehicles.
  • Solar Cities.

45
WATERMILLS AND MICRO HYDEL PROJECTS
  • Targets of 35, 11, 23 nos of watermills
    sanctioned - JAKEDA, National Institute of
    Training and Consultancy (NITCO)-NGO, and JK
    PDC.
  • NITCO watremills being installed.
  • 35 watermill sites identified in district Reasi
    on pilot basis. Bids for their upgradation/develop
    ment invited.
  • Proposals for 2 MHPs of 10kW 15 kW capacities
    at sarbal, Nilgrath Tehsil Kangan submitted to
    MNRE.

46
1 1000 MHPs UNDER PMs RECONSTRUCTION PLAN
  • Implemented by Army authorities in JK.
  • Each unit having a capacity of 3-5 kW
  • 435 sites identified by the Army under the MNRE
    component of the prog.
  • MNRE, GoI, sanctioned Rs. 870 lakhs for the
    implementation of the project.
  • Funding for the project channelized through
    JAKEDA.
  • Block Level Committees constituted by the state
    govt, for taking over from the army the
    installed/functional MHPs
  • Post installation operation maintenance
    mechanism through community participation on self
    sustaining basis being worked out by the
    concerned civil administration with the army

47
Awards
  • Based on the Agencys performance in the solar
    energy sector, JAKEDA bagged the runners up award
    for presenting a case study on solar energy at
    RENEWTECH India 2009 State Awards for Renewable
    Energy.
  • On behalf of the state, CEO JAKEDA received the
    award on3.3.2009 during the function organized by
    the RENEWTECH at Pune, Maharashtra

48
Main reasons for non implementation of
the mandate in full
  • Lack of infrastructure particularly the manpower.
  • No clear cut policy of the state govt. about
    NRSE.
  • No clear cut mandate to take up NRSE projects for
    power generation especially SHP.
  • No clear cut mandate for electrification of
    un-electrified villages with proper delineation
    vis-à-vis Power Dev. Deptt.
  • Lack of Private sector participation in
    harnessing NRSE.
  • Non availability of adequate matching
    contribution from state govt. to finance various
    schemes.

49
Suggestions for ensuring implementation of the
mandate
  • The govt. must bring out a clear policy on NRSE
    with respect to power generation, wheeling and
    banking.
  • JAKEDA as nodal agency must have a clear-cut
    mandate for harnessing NRSE particularly SHP.
  • JAKEDA must have corporate working set up to
    ensure speedy decision making, delegation of
    powers required at various levels
  • Need to develop infrastructure within JAKEDA
    particularly manpower.
  • JAKEDA to have mandate for electrification of
    un-electrified villages within proper
    delineation vis-à-vis Power Dev. Dep't.
  • NGOs and private sector participation to be
    encouraged to boost investment in NRSE.
  • JAKEDA must act as a promotional org. to pilot
    the proposals for obtaining various sanctions and
    to regulate finances and subsidies.
  • Easy finances should become available through
    FIs and banks. JAKEDA may also become Business
    Dev. Associate of IREDA.
  • The state govt. to provide adequate funds to
    provide matching contributions for funding of
    schemes.

50
GOAL OF JAKEDA
  • TO BECOME A PARALLEL ORGANIZATION TO THE POWER
    DEVELOPMENT DEPARTMENT THROUGH POWER GENERATION
    BY HARNESSING NEW AND RENEWABLE SOURCES OF ENERGY.

51
THANK YOU