Title: Introducing a New Product
1SWR- an overview
- Formed in 2003 By merging UBL from SCR, SBC,
MYS from SR, Construction Unit at BNC and HQ at
UBL - Divisions - Three
- Workshops - Two
- Construction - One
- No traditional EDP Centres
South Western Railway
2SWR- an overview Control of
Network/Applications
- CSTE/Sr.DSTE
- Railnet
- FOIS network
- Sr.EDPM
- Internet Web Server,Intranet Web server
- MIS at SBC,MYS
- PRIME AFRES
- Dy.CMM
- MMIS (Stores)?
South Western Railway
3Review of Existing Applications
- Traffic Accounts
- Programs running in Foxpro
- Cash Voucher.
- Billing of Warrants
- Balance Sheet Section
- Account Current
- EFT Section
- Sundry Returns
- Transfer Transaction
- Parcel Section
- BPT Section
-
South Western Railway
4Review of Existing Applications
- Stores
- MMIS under implementation
- Consists of the modules as implemented by C.Rly.
- Purchase Module
- Depot Module
- Finance Module
- Sales Auction Module and
- Uniform Module
- Purchase and Depot Module have been tested and
implemented in six Depots. - The Finance Module is under implementation in HQ.
South Western Railway
5Review of Existing Applications
- AFRES modules
- P.F
- Pension
- Internal Check
- Books Compilation of FMIS, Cheques TC/JV
- Cash and Pay
- E-Suspense, General suspense, WGR
- Pay-roll
- PRIME at all Divisions and Workshops
- Payroll
- DA Arrears, Income Tax, Supplementary Bills
South Western Railway
6Involvement of EDP Centres in RDBMS applications
- Facilitator for PRIME AFRES
- Implemented by HQ
- Managed by divisions and workshops
- Coordinated by Sr.EDPM/UBL
- MMIS at select locations
- Under Implementation by COS/FACAO
South Western Railway
7Review of Cadre Policy of EDP centres
- Need for change in the designation of
Sr.EDPM/EDPM as Sr.IT Manager/IT Manager due to
changed scenario. - Gazetted Cadre position and Policy review
- Gazetted sanction NIL
- Sr.EDPM - Work charged operated at HQ/UBL since
Aug-2008. - The formation of cadre as per new cadre policy -
status - No posts are operated. Staff are utilised from
Accounts and Personnel department for each units - Selection of incumbents for various posts
- Cadre is not created
South Western Railway
8The future role of EDP Centres as IT-enabler in
the Railways
- Road map for short term, medium and long-term IT
infusion in the working of Railway - Officials with IT background and interest should
be assigned IT related job of their department
and should be given incentives. - Coordinating role of EDP Centre in these
activities - EDP Centre shall act as a nodal organization.
- Integration of data from ongoing applications
like FOIS, CREW Management Software. - Since, FOIS has been implemented over 17
locations in this Railway and RRs are being
issued through TMS. CAO/FOIS and GM/CRIS were
approached for modifying the existing FOIS
software to enable Zonal Railways to directly
upload the RR details for greater accuracy and
elimination of data entry. - Taking advantage of out-side developments in the
IT field and adopting them in Railway working - The Railnet facilities and Corporate Mailing and
Messaging shall be strengthened on par with the
industry.
South Western Railway
9Identification of Powers and authority required
for EDP centres to effectively serve as a tool of
IT catalyst
- Manning of Sr.EDPM post
- by qualified trained personnel.
- Engagement of professionals from market
- through Contract.
- Coordinating role in development of integrated
software for use in the zonal Railway - A general frame work/platform shall be suggested
by Railway Board and the Zonal Railways shall be
allowed to develop applications within the
framework. - Powers of work in PH-17
- Existing system is satisfactory. However, more
powers shall be delegated to Divisional Level for
procurement of P.Cs/related infrastructure and
development of Software. Enhancement of
procurement of powers to PHOD/HOD for
infrastructure/PC or replacement/Additional
account.
South Western Railway
10New application areas like web-based
reconciliation, Account Current etc.,
- Web Based Reconciliation
- Scope Staff related, Stores, fuel, GTKM, Works
- Methodology
- Login Password Authenticated on Central Web
Server - TD/TC Creation/Acceptance/Rejection
- Details of Transactions for further
Journalisation capturing all necessary details
for different type of transactions viz.
Originating month, type, unique code (viz. P.F
no, Workcode - Eliminating the Central Books in Transactions
dealing directly with Responding Units. The
Central Books shall act as generating ML of
Transfer Transactions for the Rly.
South Western Railway
11New application areas like web-based
reconciliation, Account Current etc.,
- Web Based Reconciliation(Contd.)?
- Documents
- As proof of transaction (Scan/Upload)?
- Original documents Sent by Post
- Interface
- Web mail like
- Multiple User Accounts for Division/Unit
- Facility for acceptance/rejection
- Monthly List
- Down load details /update local JVs
South Western Railway
12Issue of maintenance of the system. Training needs
- Maintenance should be centralized through Sr.EDPM
South Western Railway
13IT enabled applications areas outside traditional
application areas
- IT SMS message to contractors and suppliers as
when bills are passed with cheque No., amount
etc. - Office attendance through Swipe Card
- Periodical reports to Railway Board only through
E-mail with authentication/digital signature on
standard templates
South Western Railway
14THANK YOU
South Western Railway