Title: WG3 Presentation to SC4 Opening Plenary


1
WG3 Presentationto SC4 Opening Plenary
  • Len Slovensky, Deputy Convener
  • Poitiers, France
  • 2003-10-27
  • 0800 1000

2
WG3 Schedule for Poitiers (1/2)
  • WG3 plenaries
  • Monday 1030 1130
  • Thursday 1530 1700
  • WG3/WG12 Modularization Team
  • Tuesday 0800 1200

3
WG3 Schedule for Poitiers (2/2)
4
Plenary SessionMonday 1030 1130
  • Introductions / Note taker / Agenda / Attendance
    list
  • Project briefings
  • Module/modular AP status issues
  • Advance SC4 resolutions
  • Items from PPC Conveners meeting
  • AP development issues (N. Swindells)
  • WG3 procedures
  • Updates on team plans for the week
  • Other business

5
Team Leaders MeetingMonday 1130 1200
  • Introductions / Note taker / Agenda / Attendance
    list
  • Administrative items
  • Updates to project schedules
  • Team missions and project assignments
  • Team scheduling and coordination issues
  • Joint meeting requirements
  • Round table
  • Other business

6
Plenary SessionThursday 1530 1700
  • Introductions / Note taker / Agenda / Attendance
    list
  • Review last-day SC4 resolutions
  • Schedule for future meetings
  • Project status updates and announcements
  • Open Technical Forum topics
  • Team reports
  • Action items
  • Other business

7
Loaded on EXPRESS server
KEY OK latest balloted EXPRESS is loaded WAIT
wait for next version to be balloted MODULAR
the AP is modular its EXPRESS is contained in
the corresponding 400 series part NON-WG3 the
AP belongs to a different working group
8
WG3 Teams
  • T01 Shape Representation Ray Goult
  • T04 Materials Anna Moreno / Norman Swindells
  • T08 Product Life Cycle John Dunford / Jim
    URen
  • T09 Engineering Analysis Keith Hunten
  • T19 Mechanical Products OPEN
  • T20 Process Plant Nils Sandsmark / Paul van
    Exel
  • T21 Oil and Gas Nils Sandsmark / Paul van
    Exel
  • T22 Building and Construction W. Haas /
    Tatsuo Terai, Inhan Kim
  • T23 Ships Jim Mays, Tony Fry
  • T24 Manufacturing Martin Hardwick / Chiaki
    Sakamoto

9
T1 Shape representation
  • Accomplishments since Stuttgart
  • AIC Part 513 in DIS ballot
  • SEDS Issue on reflection transformations
    reviewed.
  • Draft of Oil Gas geometry completed for ISO
    15926

10
T1 Shape representation
  • Plans for Poitiers
  • Review 15926 geometry
  • Resolve part 42 SEDS issue
  • Work on IAI geometry harmonisation...

11
T1 Shape representation
  • Schedule for Poitiers
  • Monday, 2003-10-27, 1300-1700
  • Review draft of ISO 15926 geometry (with
    OilGas).
  • Tuesday, 2003-10-28, 0800-1200, 1300-1700
  • Joint meeting with Parametrics
  • Review algebraic geometry proposal
  • Harmonisation of IAI geometry (with T22).
  • Thursday, 2003-10-30 0800-1200
  • Resolve SEDS issue on transformations
  • Resolve early part 523 ballot issues

12
T4 Materials
  • Accomplishments since Stuttgart
  • ISO 10303-235 Materials information for product
    design and validation
  • ARM completed as general model for any product
    property measured by any process
  • CD Document is in preparation
  • Reference dictionaries for properties and
    processes
  • First dictionary completed, information model is
    ISO 13584, content is based on Mil-Hndbk5
    Aerospace alloys
  • Validation of ARM started
  • Using Mil-Hdbk5 data and dictionary (MMFSC
    Project of EU)
  • Using LCA data and ISO 14048 as dictionary
    (CASCADE Project of EU)

13
T4 Materials
  • Plans for Poitiers
  • Approve AP 235 ARM and CD document
  • Approve reference dictionary for Mil-Hndbk5
  • Review other needs for property representation
  • Discuss procedures for publication of reference
    dictionaries associated with ISO 10303 standards
  • Participate in WG2 dictionary meeting

14
T4 Materials
  • Schedule for Poitiers
  • Monday, 2003-10-27, 1300-1700
  • Approve agenda, report of Stuttgart meeting
  • Review AP 235 ARM
  • Tuesday, 2002-10-28, 0800-1200
  • Development of AP 235
  • Tuesday, 2002-10-28, 1300-1500
  • Development of AP 235
  • Tuesday, 2002-10-28, 1530-1700
  • Review needs for property data representation
    (joint with AP 236 team)

15
T4 Materials
  • Wednesday, 2002-10-29, 0800-1200
  • Representation of environmental data by AP235
  • Wednesday, 2002-10-29, 1300-1700
  • Reference dictionaries for product properties
  • Review Mil-Hndbk 5 dictionary
  • Develop proposals for management and support
  • Thursday, 2002-10-30, 0800-1000
  • Joint meeting with T9 on AP 235
  • Thursday, 2002-10-30, 1030-1200
  • Review progress, set tasks for next period, plan
    for future meetings.

16
ISO/TC184/SC4 PoitiersT8 Open
  • T8 Product Lifecycle
  • (AP233, AP239)

17
AP239 - by Poitiers
  • BP3 closes 29 Oct 2003
  • Part 41 Edition 3 successful CD ballot
  • Part 56 State successful CD ballot
  • BP4 ballots in progress
  • Successful PLCS launch events held in Sweden and
    US

18
T8 topics for Poitiers
  • AP239 BP3 ballot comment resolution workshop
  • AP239 encourage everyone to submit issues prior
    to BP4 ballot closure so that they can be
    addressed this week- thanks for those already
    received
  • Risk workshop

19
T8 Agenda for Poitiers
  • Mon
  • 8-12. Opening Plenaries
  • 1-3 T8 Plenary
  • Update on progress and plans
  • Initial PLCS BP3 ballot comment resolution
    workshop
  • 3-5 AP233
  • Tues
  • 8-12 AP233 AP239 Joint meeting on Risk
  • 1-5 WG3 WG12 module harmonisation

20
T8 Agenda for Poitiers
  • Wednesday
  • 8-10 Liaison Plenary
  • 10-12 AP233
  • 1-5 AP233
  • 3-5 AP239 T23 Joint meeting
  • Thursday
  • 8-10 AP239 PLCS BP3 ballot comment resolution
  • 8-12 AP233
  • 1-3 T8 Closing Plenary

21
T9 Engineering Analysis
  • Accomplishments since Stuttgart
  • Completed CD documents for Parts 52, 53, and 110
    and submitted them for CD ballot
  • Part 52 is Mesh based topology
  • Part 53 is Numerical Analysis
  • Part 110 is Mesh based computational fluid
    dynamics
  • Completed the updated DIS document for Part 107
    and submitted it for DIS ballot
  • Part 107 is FEA Definition Relationships
  • Completed a first draft of AP 237 (Fluid
    dynamics)

22
T9 Engineering Analysis
  • Plans for Poitiers
  • Review Parts 52, 53, 107, and 110 preliminary
    ballot comments
  • Develop and approach to complete AP237
  • Review Materials AP (AP 235) progress

23
T9 Engineering Analysis
  • Schedule for Poitiers
  • Monday, 2003-10-27, 1300-1700
  • Review of current work items in CFD and other EA
    areas
  • Initial look at any ballot comments for Parts 52,
    53, 107, 110
  • Thursday, 2002-10-28, 0800-1200
  • Joint meeting with Materials on AP235
  • Continued work on Part 52, 53, 110 comments
  • Continuing efforts on AP237 Fluid Dynamics
  • Future work on modules for Engineering Analysis

24
T20 Process Plant
  • Accomplishments since Stuttgart (joint with T21)
  • AP 221 Functional data and schematics
  • Five of six AP 221 DIS modules packages sent in
    for TS ballot, closes 2003-11-19
  • Sixth package completed for sending in for TS
    ballot.
  • AP 227 Edition 2 - Plant spatial and systems
    design
  • AP 227 ed2 DIS ballot successful (13Y,3A,0N,4-)
  • DIS ballot comments workshop 2003-07-9/10
  • Charleston, South Carolina, USA
  • ISO15926 P4,5,6, Register. Discussed in EPISTLE
  • ISO15926 P7 (templates) drafted CD/TS document
    for ballot
  • Discussed T20T21 merger

25
T20 Process Plant
  • Plans for Poitiers (joint with T21)
  • Review TSballot comments, demo AP221(schematics)
  • Review DIS ballot comments AP227 ed2 (spatial)
  • Review FDIS ballot comments ISO15926 p2(model)
  • Brief on ISO-Register ISO15926 P4,5,6 (ref
    data)
  • Launch CD/TS ISO 15926 Part 7 (templates)
  • Discuss ISO13584 / ISO15926 with WG2
  • Discuss merger T20 T21 into new team
  • Share information about industry applications

26
T20 Process Plant
  • Schedule for Poitiers (joint with T21)
  • Monday, 2003-10-27, 1300-1700 hr
  • Joint with T21, Oil Gas
  • Tuesday, 2003-10-28, 0800-1200 hr
  • Wednesday, 2003-10-29, 10.30 12.00 hgr
  • Joint session with WG2

27
T21 Oil and Gas
  • Accomplishments since Stuttgart
  • ISO 15926-2 Data model is out for FDIS ballot.
    Ballot ends 19 Nov. 2003
  • ISO 15926-1 Overview and fundamental principles
    has been sent to ISO for FDIS ballot

28
T21 Oil and Gas
  • Plans for Poitiers
  • Present and discuss progress at the T21 Plenary -
    Joint with T20
  • Review FDIS available ballot comments for ISO
    15926-2 Data model
  • Discuss ISO Register for reference data and
    progress on ISO 15926 part 4, 5 and 6
  • Discuss ISO13584 and ISO15926 with WG2
  • Discuss reference data with T8 and T23
  • Present industry project

29
T21 Oil and Gas
  • Schedule for Poitiers
  • Monday, 2003-10-27, 1300-1700
  • Joint with T20 Process Plants
  • Tuesday, 2003-10-28, 10.30-1200
  • Joint with T20 Process Plants
  • Wednesday, 2003-10-29, 10.30 12.00
  • Joint session with WG2 and T20

30
T22 Building Construction
  • Accomplishments since Stuttgart
  • New version 2.0 of implementers agreements for
    STEP draughting (Scadec, Kosdic and STEP-CDS
    initiatives)
  • Building authorities of additional German states
    adopt STEP-CDS for 2D-CAD data exchange
  • Progress in harmonization with IFC2x platform
  • Start of balloting of additional modules for AP
    236 (furniture AP)

31
T22 Building Construction
  • Plans for Poitiers
  • Resolution of issues related to modules for AP
    236
  • Updates on status of STEP draughting
    implementations in Japan, Korea and Germany
  • Discussion and adoption of implementers
    agreements for STEP draughting
  • Discussion of harmonization issues with IAI
  • Discussions concerning digital factory,
    electronic procurement in the construction
    industry

32
T22 Building Construction
  • Schedule for Poitiers
  • Monday, 2003-27-10, 1300-1700
  • National activity reports
  • Tuesday, 2003-28-10, 0800-1500
  • Updates on STEP draughting implementations in
    Japan, Korea and Germany, discussion of
    implementers agreements
  • Tuesday, 2003-28-10, 1530-1700
  • Joint meeting with shape representation,
    parametrics and IAI
  • Wednesday, 2003-29-10, 1000-1700
  • Joint meeting with IAI, discussion of joint
    project and harmonization issues.
  • Thursday, 2003-26-06, 800-1200
  • Electronic procurement and related topics
  • Closing plenary

33
T 23 Ships
  • Accomplishments since Stuttgart
  • AP 2162003 (Ship moulded forms) Published by ISO
    on 2003-08-01
  • AP 215 (Ship arrangement) IS document reviewed by
    WG3 convener. Editor updating and should send to
    WG3 by end of November. Expect ISO publication
    around 2004-03-01
  • AP 218 (Ship structures) IS document to WG3
    convener for review

34
T 23 Ships
  • Plans for Poitiers
  • Discuss AP implementation projects underway of in
    ship industry
  • Participate in development of ship related APs

35
T 23 Ships
  • Schedule for Poitiers
  • MONDAY
  • 1030 T23 project review
  • TUESDAY
  • AP 233 Systems engineering
  • AP 239 Product lifecycle support
  • WEDNESDAY THURSDAY
  • AP 238/240 Manufacturing liaison
  • AP 233 Systems engineering liaison

36
T24 Manufacturing
  • Accomplishments since Stuttgart
  • AP 219 CD in prep
  • AP 238 DIS in prep
  • Tool paths mapped
  • PDM mapped
  • Turning model being mapped
  • AP 240 DIS sent for registration

37
T24 Manufacturing
  • Plans for Poitiers
  • Review AP information models
  • Discuss possible AP 223 model for casting
  • Discuss possible impact of Part 28/XML
  • Discuss ASAM specification for Automotive testing

38
T24 Manufacturing
  • Schedule for Poitiers
  • Monday, 2003-03-10, 1300-1700
  • Plenary
  • 30 minute updates on all projects
  • Discussion on ASAM specification
  • Tuesday, 2003-03-11, 0800-1700
  • AP-240 DIS walkthru
  • AP-224 ed3 review AP-223 review
  • AP-219 Inspection data and results review
  • AP-238 DIS walkthru

39
T24 Manufacturing
  • Schedule for Poitiers
  • Wednesday, 2003-03-12, 1030-1200
  • Open
  • Wednesday, 2003-03-12, 1300-1500
  • Open
  • Wednesday, 2003-03-12, 1530-1700
  • Joint with Implementors Forum Wg11
  • Part 28/XML

40
T24 Manufacturing
  • Schedule for Poitiers (continued)
  • Thursday, 2003-03-13, 0800-1030
  • Joint meeting with shipbuilding
  • Thursday, 2003-03-12, 1030-1700
  • Discussion of impact of AP-203 ed2
  • Impact of construction history
  • Impact of dimensional tolerances
  • Discussion on STEP-Manufacturing and XML
  • Mixing AIM and ARM concepts
  • P28 Configurations for manufacturing
  • Coordination with SC1/Wg7
  • Upcoming meeting at AFNOR

41
T24 Manufacturing
  • Schedule for Poitiers (continued)
  • Thursday, 2003-03-13, 0800-1030
  • Joint meeting with shipbuilding
  • Thursday, 2003-03-12, 1030-1700
  • Joint meeting with SC1/WG7
  • 14649-111 Tools for milling machines
  • 14649-12 Data for turning14649-121 Tools for
    turning14649-13 Data for wire-EDM
  • 14649-14 Data for sink-EDM
  • 14649-15 Wood, glass and stone cutting and
    contouring
  • Process data for measuring machines
  • Process data for machining centers

42
Vacancies
  • Leader of T19
  • Experts for T19
  • Deputy leaders of T01, T09, T19