UBC VANCOUVER
UBC Renew Every Third Building is Free!
THE UNIVERSITY OF BRITISH COLUMBIA
2
BUCHANAN BLOCK
What is the Renew Project?
Create modern institutional facilities from
deteriorating buildings
3
Designed to
  • Align facilities with Academic Plan
  • Mitigate deferred maintenance
  • Minimize environmental impacts
  • Preserve campus heritage

4
UBC Renew saves money
Basically, every third building is free.
So, how does it work?
5
Renovation Savings

6
Deferred Maintenance Savings
  • Reducing UBCs 550 million deferred maintenance
    debt by 300 million
  • 77 million from Phase 1
  • 223 million by Phase 4

7
Savings for Taxpayers
  • Phase 1 Renew costs 129 M Replacement costs
    217 M
  • Savings 88 M
  • Phases 2 to 4 382 M
  • PROJECTED TOTAL 470 M

8
Ahead of the Curve
9
UBC is Canadas leader in campus sustainability

10
LEED silver or better certification
11
Saving campus green space, materials, money
12
Recycling materials Reducing waste
13
(No Transcript)
14
Saving natural resources
15
(No Transcript)
16
Minimal Time Inconvenience
  • New building construction 16-24 months
  • UBC Renew 8-10 months
  • Construction aligned with academic year

17
Preserving heritage buildings
18
Preserving heritage buildings
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
Cost Analysis Chemistry Centre
  • Renovation 31.8 million
  • Replacement 47.9 million

Savings 16.0 million
23
M17 AFTER RENOVATIONS
M17 M18
24
(No Transcript)
25

26
(No Transcript)
27
(No Transcript)
28
Cost Analysis M17 M18
  • Renovation 3.7 million
  • Replacement 13.0 million

Savings 9.3 million
29
Chemistry North
30
Chemistry North
  • Brought building up to code
  • State-of-the-art synthetic chemistry research
    facilities
  • New lighting, HVAC,fumehoods stacks
  • Seismic upgrades

31
(No Transcript)
32
(No Transcript)
33
Chemistry North Cost Analysis
  • Renovation 10.0 million
  • Replacement 15.5 million

Savings 5.5 million
34
(No Transcript)
35
(No Transcript)
36
Buchanan DClassroom Block
37
  • Energy-saving windows
  • New finishes and heating system
  • Improved lighting
  • Enhanced AV

38
(No Transcript)
39

40
More space for student interaction
41
(No Transcript)
42
(No Transcript)
43
Cost Analysis Buchanan D
  • Renovation 7.2 million
  • Replacement 17.4 million

Savings 10.2 million
44
Cost Analysis Buchanan C
  • Renovation 7.0 million
  • Replacement 11.6 million

Savings 4.6 million
45
Friedman
46
(No Transcript)
47
Cost Analysis Friedman
  • Renovation 19.0 million
  • Replacement 31.7 million

Savings 12.7 million
48
Typical Project Scope
  • Demolition foundations, structure, envelope,
    and heritage features remain
  • Energy efficient mechanical and electrical
    systems and lighting
  • Life safety and Code upgrades, including seismic,
    sprinklers, accessibility
  • New windows and envelope repair
  • Reconfiguration and re-purposing of space to
    intensify use meet academic needs
  • New finishes

49
Issues Driving Decision-Making
  • Academic Program requirements
  • Space Utilization and flexibility
  • Budget
  • Sustainability
  • Heritage

50
UBC Renew Ph 1 Accomplishments
  • Saved a total of 166 million
  • Upgrading 10 buildings
  • Sustainability leadership

51
UBC VANCOUVER
  • Canadas leader in campus sustainability
  • Inspiring others

52
(No Transcript)