Title: UBC Renew
1UBC VANCOUVER
UBC Renew Every Third Building is Free!
THE UNIVERSITY OF BRITISH COLUMBIA
2BUCHANAN BLOCK
What is the Renew Project?
Create modern institutional facilities from
deteriorating buildings
3Designed to
- Align facilities with Academic Plan
- Mitigate deferred maintenance
- Minimize environmental impacts
- Preserve campus heritage
4UBC Renew saves money
Basically, every third building is free.
So, how does it work?
5Renovation Savings
6Deferred Maintenance Savings
- Reducing UBCs 550 million deferred maintenance
debt by 300 million - 77 million from Phase 1
- 223 million by Phase 4
7Savings for Taxpayers
- Phase 1 Renew costs 129 M Replacement costs
217 M - Savings 88 M
- Phases 2 to 4 382 M
- PROJECTED TOTAL 470 M
8Ahead of the Curve
9 UBC is Canadas leader in campus sustainability
10LEED silver or better certification
11Saving campus green space, materials, money
12 Recycling materials Reducing waste
13(No Transcript)
14Saving natural resources
15(No Transcript)
16Minimal Time Inconvenience
- New building construction 16-24 months
- UBC Renew 8-10 months
- Construction aligned with academic year
17Preserving heritage buildings
18Preserving heritage buildings
19(No Transcript)
20(No Transcript)
21(No Transcript)
22Cost Analysis Chemistry Centre
- Renovation 31.8 million
- Replacement 47.9 million
Savings 16.0 million
23M17 AFTER RENOVATIONS
M17 M18
24(No Transcript)
25 26(No Transcript)
27(No Transcript)
28Cost Analysis M17 M18
- Renovation 3.7 million
- Replacement 13.0 million
Savings 9.3 million
29Chemistry North
30 Chemistry North
- Brought building up to code
- State-of-the-art synthetic chemistry research
facilities - New lighting, HVAC,fumehoods stacks
- Seismic upgrades
31(No Transcript)
32(No Transcript)
33Chemistry North Cost Analysis
- Renovation 10.0 million
- Replacement 15.5 million
Savings 5.5 million
34(No Transcript)
35(No Transcript)
36Buchanan DClassroom Block
37- Energy-saving windows
- New finishes and heating system
- Improved lighting
- Enhanced AV
38(No Transcript)
39 40More space for student interaction
41(No Transcript)
42(No Transcript)
43Cost Analysis Buchanan D
- Renovation 7.2 million
- Replacement 17.4 million
Savings 10.2 million
44Cost Analysis Buchanan C
- Renovation 7.0 million
- Replacement 11.6 million
Savings 4.6 million
45Friedman
46(No Transcript)
47Cost Analysis Friedman
- Renovation 19.0 million
- Replacement 31.7 million
Savings 12.7 million
48Typical Project Scope
- Demolition foundations, structure, envelope,
and heritage features remain - Energy efficient mechanical and electrical
systems and lighting - Life safety and Code upgrades, including seismic,
sprinklers, accessibility - New windows and envelope repair
- Reconfiguration and re-purposing of space to
intensify use meet academic needs - New finishes
49Issues Driving Decision-Making
- Academic Program requirements
- Space Utilization and flexibility
- Budget
- Sustainability
- Heritage
50UBC Renew Ph 1 Accomplishments
- Saved a total of 166 million
- Upgrading 10 buildings
- Sustainability leadership
51UBC VANCOUVER
- Canadas leader in campus sustainability
- Inspiring others
52(No Transcript)