Title: Module%20Gas%20Leak


1
  • Module Gas Leak
  • Chiho Wang
  • Duke University

2
Gas leak requirements
  • Operating condition
  • ionization gas at 1 atm with 70 Xe
  • purging gas at 1 atm with 100 CO2
  • allow 10 volume / year of Xe loss
  • Measurement simulates Xe loss with
  • Same gas (or different gases assuming both are
    ideal gas) in each gas volume
  • Slight over pressure of ionization gas volume
  • monitoring pressure change over time
    (indifference of composition change)
  • Present requirement at Duke/IU
  • lt 0.1 mBar/Bar/minute

3
Module leak test setup
4
Module leak test setup
Reference Volume
5
Leak Measurement
  • Measurement procedure
  • pressurize/equalize module and reference tank
    pressure to 20mB above room atm
  • isolate module from reference tank
  • monitor pressure change between reference tank
    and module over time
  • Leak rate is calculated dP/P/T
  • dP pressure difference
  • Tank - Module (mBar)
  • P module pressure vs room (Bar)
  • T elapsed time (minute)

6
Module 2.07 mechanical
  • 42 hrs, Leak rate -0.007 mB/B/min

7
Measurement Accuracy
  • Affecting factors
  • Temperature may swing 2ºC during measurement.
  • The measurement assumes module and reference tank
    responds to temperature change equally.
  • Suppose theres a 10 mismatch in their
    responses, the error in dP measurement would be
  • 10 2/3001013 0.68 mB
  • To wash out temperature effect with time to
    0.05mB/B/min would be
  • 0.05 0.68(mB) / 0.02(Bar) / T (minute)
  • T 675 minutes 11.3 hours
  • Room pressure may swing 10s of mBar and affect
    module P used in calculating leak rate
  • This, however, can be corrected by taking average
    P or integrating P over time.

8
Module leak measurements
  • measured at mechanical completion

9
Summary
  • Modules built are leak tight
  • Continue to improve leak measurement and
    understand the measurement error
  • Added barometer to obtain absolute module
    pressure
  • Try to understand temperature dependence of dP
    between module and tank
  • Try different method of leak rate calculation,
    e.g. using P/T nR/V without using reference
    tank.