Title: TD ROC Status


1
TD ROC Status
  • TRD Status meeting 26.6.2006
  • GSI

2
News
  • Dubna
  • 16 more chambers sent to GSI, should arrive in
    Germany today. First transport by truck from
    Dubna.
  • Oleg will come to GSI in July to test those
    chambers (HV test, leak test on some, full test
    on 1 chamber).
  • 3 chambers with large leaks working on it.
  • Production stopped, due to lack of materials
    last transport left GSI 5 weeks ago, not arrived
    yet.
  • Bucharest
  • Some panels seem to be less flat than 200um
    (lt250 um). Will compare with measurement
    protocol from production.

3
News cont.
  • Frankfurt
  • Production bottleneck Testing (Step motor
    problems, Orbishpere problems).
  • Humidity in Lab approaching 60 RH Waiting for
    dehumidifier.
  • Heidelberg
  • Chamber testing backlog due to Dubna/Bucharest
    chambers being tested
  • 1 Bucharest chamber seems to have unconnected
    anode wire Bucharest people will repair.
  • Chamber building regularly disrupted by SM
    production, CERN visits (with my technicians) and
    health problems.
  • Profile production disrupted, by Cooling profile
    production no L-profiles produced in last 3
    weeks until End of July.
  • Front profile production stopped by LV patchpanel
    production.

4
News III
  • GSI
  • Unconnected anode wires discovered after
    collimation of x-ray tube was increased.
  • Collecting Info from
  • all labs.
  • Possibly require fine
  • granularity for
  • chamber testing

5
Production Status
  • production rate since last status meeting
    increased 6 chambers/week (raw production
    rate w/o testing).
  • Only tested chambers 4 chambers/week.

6
Christian Lippman (1/2006) Garfield simulation
of unconnected wires
7