CEA Technologies Inc' - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

CEA Technologies Inc'

Description:

Co-sponsor research and development projects. What is CEATI? ... Uncertainty in Dam Safety', published by Thomas Telford 2004, ISBN 0727732706 ... – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 18
Provided by: angelog8
Category:

less

Transcript and Presenter's Notes

Title: CEA Technologies Inc'


1
(No Transcript)
2
What is CEATI?
A user driven technology solutions and
development program to
  • Identify and address technical issues
  • Share and gain expertise
  • Co-sponsor research and development projects

3
CEATI Benefits/Value
Industry Experience - Technical Resource
Tool Cost Leveraging Practical
Application Flexibility of participation
4
Participation Interest Group Representatives
  • Hydraulic Plant Life Interest Group
  • Dam Safety Interest Group
  • Water Management Interest Group
  • Strategic Options for Sustainable Power
    Generation

5
CEATI Hydro Participation North America
  • FERC Licensees
  • Allegheny Energy Supply
  • Ameren UE
  • American Electric Power
  • Brookfield Power Corporation
  • Chelan County Public Utility District
  • City of Seattle
  • Douglas County PUD
  • Duke Energy
  • Eugene Water and Electric Board
  • Grant County Public Utility District
  • Hetch Hetchy Water Power
  • New York Power Authority
  • Portland General Electric
  • Sacramento Municipal Utility District
  • Seattle City Light
  • Southern Company
  • Tacoma Power
  • TransAlta Energy Corporation
  • US Government
  • Bonneville Power Administration
  • California Department of Water Resources
  • Tennessee Valley Authority (TVA)
  • U.S. Army Corps of Engineers
  • U.S. Bureau of Reclamation
  • Canada
  • ALCAN Inc.
  • BC Hydro Generation
  • Churchill Falls (Labrador) Corporation
  • EPCOR
  • FortisBC Inc.
  • Hydro-Quebec
  • Manitoba Hydro
  • Natural Resources Canada
  • New Brunswick Power Generation Corporation
  • Newfoundland and Labrador Hydro
  • Ontario Power Generation
  • SaskPower

6
CEATI Hydro Participation Worldwide
  • Europe
  • E.ON Wasserkraft GmbH
  • Electricite de France (EDF)
  • ELFORSK
  • ESB (Electricity Supply Board)
  • Fortum Generation AB
  • Scottish and Southern Energy
  • Vattenfall AB
  • Australia/New Zealand
  • Hydro Tasmania
  • Mighty River Power
  • Meridian Energy
  • Snowy Hydro Limited
  • Africa
  • ESKOM

7
Hydraulic Plant Life Interest Group (HPLIG)
  • HPLIG assists hydroelectric utilities to
  • Lower costs
  • Extend equipment life
  • Improve efficiency
  • Increase reliability, etc.

8
Water Management Interest Group (WMIG)
  • Watershed Management
  • Hydro-Meteorology
  • Operational Optimization Modeling
  • Operations/Risk/Safety/Ice/Climate

9
Dam Safety Interest Group (DSIG)
  • DSIG major completed research, includes
  • Risk Assessment Methods
  • Seepage and Erosion

10
Dam Safety Interest Group (DSIG)
  • Risk Analysis Research
  • A seven year research project that resulted in
    the book Risk and Uncertainty in Dam Safety,
    published by Thomas Telford 2004, ISBN 0727732706
  • Part I - Guiding Principles
  • Part II - Commentary on Risk Analysis
  • Part III - Theoretical Considerations

11
Dam Safety Interest Group (DSIG)
  • Seepage and Internal Erosion
  • Developed 3 engineering tools to detect seepage
    and erosion
  • Water temperature
  • Streaming potential
  • Resistivity measurement

12
Dam Safety Interest Group (DSIG)
  • Seepage and Internal Erosion
  • This project resulted in 8 reports, including
  • A parameter Study for Internal Erosion Monitoring
  • Self Potential Field Data Acquisition Manual
  • Laboratory Testing of the Streaming Potential
    Phenomenon in Soils
  • SP Interpretation Manual
  • Resistivity Interpretation Manual
  • Long-Term Resistivity and Self Potential
    Monitoring of Embankment Dams Experiences from
    Hallby and Sadva Dams, Sweden
  • Engineering Seismic Surveys at a Test Embankment
    Near Seven Sisters, Manitoba
  • A Study of Through-Dam Seismic Testing at WAC
    Bennett Dam
  • In addition, two software packages were
    developed, SP3D and DamTemp

13
Dam Safety Interest Group (DSIG)
  • Major Projects in Progress
  • Erosion and Breaching
  • Non-Destructive Anchor Testing
  • Debris Management during Floods
  • Impact of Organization Technology on
    Performance (PTO)
  • Multi-Fractal Estimates of Flood Frequency
  • Reliability of Discharge Facilities

14
Dam Safety Interest Group (DSIG)
  • Erosion and Breaching
  • Phase I - Assemble Data
  • Dam erosion failures
  • Lab tests
  • Assemble and evaluate mathematical formulations
    and numerical
  • models of erosion
  • Phase II - Develop Predictive Model
  • Evaluate and select numerical erosion model
  • Incorporate into HEC-RAS flow model
  • Develop commercial erodibility test

15
Dam Safety Interest Group (DSIG)
  • Non-Destructive Anchor Tests
  • Uses Spectral Time Domain Reflectometry
  • New instrument developed
  • Could detect cuts in 1 of 5 strands of a 200
    long anchor
  • Instrument needs lower frequency/longer
    integration

16
Dam Safety Interest Group (DSIG)
  • DSIG Workshop Deliverables
  • The DSIG would like to
  • Get ideas on future research projects
  • Identify potential cooperative projects
  • Avoid research duplication
  • Exchange research results

17
Questions?
  • Gary Salmon
  • DSIG Technology Advisor
  • (604) 922-8235 gmsalmon_at_allstream.net
  • Gus Tjoumas
  • DSIG Technology Advisor
  • (410) 715-1170 gus.tjoumas_at_ceatech.ca
  • Chris Hayes
  • Manager, Program Development
  • CEA Technologies Inc. (CEATI)
  • (514) 866-5370 chris_at_ceatech.ca
Write a Comment
User Comments (0)
About PowerShow.com