Title: Civil Works Program
1Civil Works Program
- Missions
- Select Authorities
- Planning Process
- Project Phases
- Legislative Drafting Services
2Missions
- HIGH PRIORITY
- Commercial Navigation
- Flood Damage Reduction
- Ecosystem Restoration
- LOW PRIORITY
- Storm Damage Reduction
- Water Supply
- Hydro Power
- Recreation
3Select Authorities
- Congressionally Authorized Studies/Projects
- Great Lakes Fishery and Ecosystem Restoration
Program - Continuing Authorities
- Program
-
4Congressionally Authorized Studies / Projects
- Specifically named projects (i.e. Little Calumet
River, Chicago Shoreline, Des Plaines River II ) - Authorizations usually in laws (i.e. WRDA, RH
Acts) or Resolutions from House or Senate
Committees - Projects are large, usually
- expensive and complex
-
5Great Lakes Fishery and Ecosystem Restoration
Program
- WRDA 2000, Section 506
- Support Plan - Process
- Projects - Plan, Design Construct
- Evaluation Determine Success of Projects
-
- Projects in Great Lakes, Great Lakes
- Basin and the Chicago River
- 100M program
- 65/35 cost share
-
-
-
6Continuing Authorities Program (CAP)
- Nine Delegated Programs
- Relatively Small Projects
- Usually Cost Shared
- FY 05 - 108M
-
-
-
7Continuing Authorities Program What is it?
- Program that authorizes the
- Chief of Engineers to plan, design
- and construct projects of limited
- scope and complexity
- Congress does not need to specifically authorize
projects or provide specific project funding - Projects often named in appropriations bill
8The Continuing Authorities Program Why is it
useful?
- Start quickly Project sooner
- Projects approved at Divisions, not HQ
- Accelerated planning processlevel of detail is
consistent with risk - Environmental authorities
- include not-for-profits as
- local sponsors
9Section 14Emergency Streambank Shoreline
Erosion Protection
- Protection for public facilities threatened by
streambank erosion - 1 Million Federal limit
- 65/35 cost-sharing
- for costs gt 40 K
- OMRRR - 100 local
- FY05 - 12M
10Section 205Small Flood Control Projects
- Cost-share
- Studies gt 100K are cost shared 50/50
- Projects 35 non structural
35-50 structural - OMRRR 100 local
- 7 million Federal limit
- FY05 - 27M
11Section 107Small Navigation Projects
- General navigation features including
- breakwater, jetties, anchorage
- and turning basins
- 4 million Federal limit
- Local cost-share
- Comm.navigtion 10 - 50
- Recreation navigation - 50
- OMRRR 100 local
- FY05 - 9M
12Section 208Snagging and Clearing
- Minor measures to reduce flooding caused by
debris and minor shoaling - Total project costs
- over 40K are
- cost-shared - 35
- OMRRR
- 100 local
- FY05 - 450K
13Section 103Small Beach Erosion Control
- Protect public or multiple private properties and
facilities against damage from storms - 3 million Federal limit.
- Cost sharing.
- 65/35, except on Fed lands
- then 100 Fed
- OMRRR local
- FY05 - 3M
14Section 111Shore Damage Mitigation
- Prevent or mitigate damages resulting from
Federal navigation projects along shorelines. - Cost-shared same as project causing the problem.
- 5 million Fed limit.
- Limited to damage
- caused by Fed project
- FY05 - 1M
15Section 204Beneficial Use of Dredged Material
- Protection, restoration and creation of aquatic
habitats in connection with dredging - Base plan - least costly method of disposal
- Above base plan
- 75 Fed
- 25 non-fed
- FY05 - 6M
16Section 206Aquatic Ecosystem Restoration
- No tie to Corps project required
- 5 million Fed limit
- Recreation features allowed
- not to exceed Fed cost by 10
- 65/35 cost sharing.
- OMRRR - 100 local
- FY05 - 25M
17Planning Process
- Structured approach to solving problems
- Iterative Process
- Interdisciplinary team
- Can we?..Should we?
- Planning weaves the natural,
- social and engineering sciences
into
successful solutions
18Project Phases
- Reconnaisance Planning
- Feasibility Planning
- Planning Engineering
- Design
- Construction
- Operation Maintenance
- Specifically Authorized Projects 15 years
- CAP 3-5 years
19Legislative Language Drafting Services
- Authorizations
- Study Resolutions
- Appropriations
- Process
- Congressional Request
- District drafts language
- Language submitted
- to MSC HQ for approval
- Approved language
- provided to Congressional office
- Approved language is not a
- Corps endorsement of the request