Coop Exit Presentation - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Coop Exit Presentation

Description:

Eta Kappa Nu Electrical Engineering Honor Society. Tau Beta Pi Engineering Honor Society ... Japanese Experiment Module. Electrical Power System Drawings ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 20
Provided by: chatwinl
Category:

less

Transcript and Presenter's Notes

Title: Coop Exit Presentation


1
  • Co-op Exit Presentation
  • Reeve Ingle
  • EV7 Systems Analysis Verification Branch
  • Electronic Systems Test Laboratory (ESTL)
  • December 11, 2006

2
Presentation Overview
  • Personal Background
  • Previous Co-op Tours
  • EV7 Projects
  • Fourier Analysis of FSK Square Wave
  • Internet Protocol Research
  • Experience Gained
  • Co-op Activities
  • Future Plans
  • Acknowledgements
  • Questions

3
Personal Background
  • Hometown Carrollton, Georgia
  • Graduated from Carrollton High School in 2003
  • Valedictorian in class of 250 students
  • Eagle Scout
  • Senior at Georgia Tech in Atlanta, Georgia
  • Electrical Engineering Major, Spanish Minor
  • Outstanding ECE Sophomore Award, Deans List
  • Teaching Assistant Mathematics Spanish
    Courses
  • IEEE
  • Eta Kappa Nu Electrical Engineering Honor Society
  • Tau Beta Pi Engineering Honor Society
  • Graduate in Spring 2008

4
First Co-op Tour Cargo Integration Operations
- DO5
  • Japanese Experiment Module
  • Electrical Power System Drawings
  • JAXA/NASA End-to-End Activation Test
  • STS-121 Transfer Team Support
  • Console Operator Training
  • Researched Methods to Clean Clothing in Space
  • Website Design

Zero-G Clothes Washer
JEM ACO Website
5
Second Co-op TourElectronic Systems Test Lab
EV7
Multipath Fading Simulator
  • Multipath Fading Simulator
  • Firmware Radio Testing
  • High-Impedance Buffer Troubleshooting and Repair

Buffer Box Repair
6
Third Co-op TourIntelligent Systems Branch ER2
SCOUT Dashboard Unit
  • RF Interference Troubleshooting
  • Created Spectrum Map of SCOUT Wireless Systems
  • Installed BPF and Ferrite Bead
  • SCOUT Dashboard Unit
  • Speedometer
  • Odometer
  • Battery Voltage
  • Temperature
  • Emergency Stop LEDs
  • Desert RATS Field Test Support

RF Mapping of SCOUT Rover
7
EV7 Projects Fourier Analysis of FSK Square
Wave
  • Purpose
  • FM Transmitter Configuration
  • ESTL currently configures FM transmitters using a
    sinusoidal modulating signal
  • Many FSK transmitters have digital front ends
    that only support pulse modulation
  • Allows beta values (?f / R) to be configured
    using square wave (1010 or 1100 pattern)
    modulating signal
  • Analysis of FSK Transmission Sequences
  • Preamble Digital 1010 training sequence
  • Results in additional power levels at center
    frequency and harmonics

8
Method 1 Closed-Form Solution of Fourier Integral
Pulse Train
RF Pulse Train
ReconstructedSignal
FSK Square Wave
Fourier Coefficients
Sum of 2 RF Pulse TrainsOffset 180
9
Method 2 Numerical Evaluation of Fourier
Integral Using Symbolic Mathematics Program
FSK Square Wave
x(t)
Fourier Integral
Normalized Fourier Series Coeffs.
dBc
10
Method 3 Fast Fourier Transform (FFT)
FSK Square Wave
x(t)
Sample Signal
s(t)
FFT
11
FSK Square Wave Spectrum Calculated via
Closed-Form Solution
Components occur at fc nfm fmR/2 for 1010,
fm R/4 for 1100
12
Table Excerpts for Small and Large Beta Values
Small Beta Values (0 5)
Large Beta Values (5 100)
13
EV7 Projects Internet Protocol Research
  • Internet Protocol (IPv6)
  • New Header Format Extension Headers
  • Encapsulating Security Payload (ESP)
  • Authentication Header (AH)
  • Larger Address Space
  • Better QoS Support
  • Using Flow Label Field
  • Extendibility

IPv6 Packet Header
14
C9 Reduced Gravity Program
  • Member of Proposal Selection Committee
  • NASA Mentor for Middle School C9 Reduced Gravity
    Team
  • Experiment Reaction rate of a chemical process
    in microgravity versus earth gravity
  • Authored Test Equipment Data Package (TEDP)
  • Provided technical guidance and advice
  • Physiological training in hypobaric chamber
  • Traveled to Seattle, Washington to meet with
    school, work on experiment, and finalize TEDP
  • Fly with team on C9 in February

15
Experience Gained
  • Through-Hole Soldering Training per NASA Flight
    Standards
  • Lab Test Equipment
  • Mathematical Theory of FM FSK Transmission
    Schemes
  • Leadership Experience as NASA Mentor for C9
    Reduced Gravity Team

Through-Hole Soldering Design Board
16
Co-op Activities
  • Lectures
  • John Young
  • Tours
  • Neutral Buoyancy Lab
  • Co-op Committees
  • Housing Guide
  • Co-op Webmaster
  • Social
  • Co-op Softball Team
  • Wings Over Houston Airshow
  • Backpacking in Guadalupe Mountains National Park
  • Carlsbad Caverns
  • Mountain Biking in Memorial Park
  • Half Marathon Race
  • Triathlon
  • SCUBA Certification

17
Future Plans
  • Spring Classes at Georgia Tech
  • Teaching Assistant for Mathematics Course
  • Summer 2007 5th Co-op Tour
  • Graduate in May 2008
  • Graduate School and Graduate Co-op
  • Applying to Georgia Tech, MIT, Stanford, and
    Berkley for Grad School
  • Begin Grad School in Fall 2008

18
Acknowledgements
  • Chatwin Lansdowne
  • B.G. Smith
  • Ned Robinson
  • Cathy Sham
  • Brian Collier
  • Fred Shetz
  • Rick Rodriguez
  • ESTL

19
Questions?
Write a Comment
User Comments (0)
About PowerShow.com