Halo LID Project
HALO LID Project
2
Halo LID Project
  • PROJECT PURPOSE
  • Determine if
  • Affordable
  • Non-traditional Ped Improvements
  • Funded by the Community

3
Halo LID Project
TODAYS GOALS 1 - Your input on the design
concept 2 - Your input on the neighborhood
interest in pursuing an LID
4
Halo LID Project
Walkshed Proximity Map
5
Halo LID Project
  • Walkshed Proximity
  • 71 abutting taxlots (4 of total)
  • 246 within 1/8 mile (15 of total)
  • 393 within 1/4 mile (24 of total)
  • 465 within 3/8 mile (28 of total)
  • 480 within 1/2 mile (29 of total)
  • 1,655 total all figures approximate

6
Halo LID Project
Project Cost Estimates Construction
Engineering Right-of-Way Financing
Total Project Cost
7
Halo LID Project
Project Cost Estimates Construction
2,146,000 Engineering
859,000 Right-of-Way
314,000 Financing 166,000 Total
Project Cost 3,485,000
8
Halo LID Project
  • One Time Cost Example - Abutting Properties Only
  • Abutting taxlots 49,000 one time
  • Within 1/8 mile 0 one time
  • Within 1/4 mile 0 one time
  • Within 3/8 mile 0 one time
  • Within 1/2 mile 0 one time
  • 3,485,000 Assumed Project Cost

9
Halo LID Project
  • Monthly Cost Example - Abutting Properties Only
  • Abutting taxlots 378 per month
  • Within 1/8 mile 0 per month
  • Within 1/4 mile 0 per month
  • Within 3/8 mile 0 per month
  • Within 1/2 mile 0 per month
  • 3,485,000 Assumed Project Cost

10
Halo LID Project
  • One Time Cost Example
  • Equal Share Within Half Mile
  • Abutting taxlots 2,100 one time
  • Within 1/8 mile 2,100 one time
  • Within 1/4 mile 2,100 one time
  • Within 3/8 mile 2,100 one time
  • Within 1/2 mile 2,100 one time
  • 3,485,000 Assumed Project Cost

11
Halo LID Project
  • Monthly Cost Example Equal Share Within Half
    Mile
  • Abutting taxlots 19 per month
  • Within 1/8 mile 19 per month
  • Within 1/4 mile 19 per month
  • Within 3/8 mile 19 per month
  • Within 1/2 mile 19 per month
  • 3,485,000 Assumed Project Cost

12
Halo LID Project
  • One Time Cost Example
  • 15 Stepback Each 1/8 Mile
  • Abutting taxlots 3,200 one time
  • Within 1/8 mile 2,700 one time
  • Within 1/4 mile 2,300 one time
  • Within 3/8 mile 1,900 one time
  • Within 1/2 mile 1,700 one time
  • 3,485,000 Assumed Project Cost

13
Halo LID Project
  • Monthly Cost Example
  • 15 Stepback Each 1/8 Mile
  • Abutting taxlots 28 per month
  • Within 1/8 mile 24 per month
  • Within 1/4 mile 21 per month
  • Within 3/8 mile 18 per month
  • Within 1/2 mile 16 per month
  • 3,485,000 Assumed Project Cost

14
Halo LID Project
  • Local Improvement District (LID) Process
  • Neighborhood contacts PDOT to initiate
    project
  • Public meeting hosted by PDOT to determine
    interest
  • If sufficient interest, petitions prepared
    valid if gt50 support

15
Halo LID Project
  • Local Improvement District (LID)
    Process
  • Council makes decision to move project
    forward or table project
  • Survey and design
  • Advertise for bids
  • Award contract to private sector

16
Halo LID Project
  • Local Improvement District (LID) Process
  • Build project
  • Close out project
  • Property owners billed
  • Financing of 5, 10 or 20 years available

17
Halo LID Project
  • SWNI HALO LID Committee
  • Formed the neighborhood project
  • teams - September / October 07
  • Charter the Teams November
  • Oversee their activities

18
Halo LID Project
  • PROJECT TEAMS
  • Kick-off Meeting November
  • Field Recon
  • Preliminary Designs
  • Team Meetings
  • Refine the Design

19
Halo LID Project
Field Recon
20
Halo LID Project
  • PROJECT TEAMS
  • Look for OPPORTUNITIES
  • Identify CHALLENGES
  • Develop ALTERNATIVES
  • Recommend SOLUTIONS

21
Halo LID Project
EXISTING CONDITIONS
SW Vermont Street, SW 45th Avenue to SW 66th
Avenue
22
Halo LID Project
23
Halo LID Project
24
Halo LID Project
25
Halo LID Project
26
Halo LID Project
27
Halo LID Project
28
Halo LID Project
29
Halo LID Project
30
Halo LID Project
31
Halo LID Project
  • Design Treatments
  • Portland Pedestrian Design Guide
  • 16 Typical Sections
  • Ditch and Swale Alternatives
  • Costs per section

32
Halo LID Project
Design Treatment
8 Curb Tight Pathway
33
Halo LID Project
Design Treatment
1S Separated Pathway with Swale
34
Halo LID Project
Design Treatment
5D Separated Pathway Above Roadway with Ditch
35
Halo LID Project
Design Treatment
10 Curb Tight Pathway with Culvert
36
Halo LID Project
  • Preliminary BASE MAP (Otak)
  • Field Notes Team Input
  • Create Base Map for Project
  • ID Key Issues / Challenges
  • ID Project Components
  • ID Alternative Design Treatments

37
Halo LID Project
Design Treatments
38
Halo LID Project
Design Treatment Costs
39
Halo LID Project
  • Construction Cost Estimates
  • Design Treatment Costs
  • Additional Construction Costs
  • Contingencies

40
Halo LID Project
  • Additional Construction Costs
  • Tree Removal Costs
  • Retaining Walls
  • Extra Excavations / Fills
  • Driveways
  • Utility Structures
  • Miscellaneous Items

41
Halo LID Project
Construction Cost Estimates Design Treatment
Costs Additional Construction Costs
Contingencies Construction Total
42
Halo LID Project
Project Cost Estimates Construction
2,146,000 Engineering
859,000 Right-of-Way
314,000 Financing 166,000 Total
Project Cost 3,485,000
43
Halo LID Project
  • NEXT STEPS
  • Work with NH Design Team
  • Petition Phase
  • Initiate the Project

44