Title: 08:00 Meeting
10800 Meeting
- Schedule
- TEM-PS test completed on Friday Sept. 26
baseline, test, and post-test data are burned to
CD-ROM - CAL cosmic data taking started Saturday Sept. 27
- Data taking configuration is CAL_LO trigger,
CAL_TACK60, TKR_TACK0 - 188 hrs of shifts scheduled for 75 livetime,
expect 140 hrs x 30 Hz 15 million triggers (500
good muons per 3mm along each log)
Mon. Sept.22 Tues. Sept.23 Wed. Sept.24 Thurs. Sept.25 Fri. Sept.26 Sat. Sept.27 Sun. Sept.28
8a-4p Hiro, Johann, Larry 8a-4p Hiro, Johann, Larry 8a-4p Berrie, Larry 8a-4p Berrie, Hiro, Larry 8a-4p Xin 8a-4p Xin 8a-4p Mizuno
4p-8p Hiro, Johann 4p-8p Johann, Larry 4p-8p Larry 4p-8p Hiro, Larry 4p-8p Mizuno 4p-8p 4p-8p
8p-12a Hiro 8p-4a Larry, Hiro 8p-12a Hiro
TACK studies TACK studies TACK studies TACK studies TEM-PS test CAL data CAL data
Mon. Sept.29 Tues. Sept.30 Wed. Oct. 1 Thurs. Oct. 2 Fri. Oct.3 Sat. Oct.4 Sun. Oct.5
8a-4p Berrie 8a-4p Berrie 8a-4p Larry 8a-4p Larry 8a-4p Jim 8a-4p Xin 8a-4p Mizuno
4p-8p Ric 4p-8p Gary 4p-8p Elliott 4p-8p Elliott 4p-8p Eduardo 4p-8p Mizuno 4p-8p Tune
8p-12a Hiro 8p-12a Hiro 8p-12a Marcus 8p-12a Hiro 8p-12a Mizuno 8p-12a Hiro 8p-12a Hiro
CAL data CAL data CAL data CAL data CAL data CAL data CAL data
Mon. Oct. 6 Tues. Oct. 7 Wed. Oct. 8 Thurs. Oct. 9 Fri. Oct.10 Sat. Oct.11 Sun. Oct.12
8a-4p Larry 8a-4p Larry 8a-4p Brian 8a-4p Gary 8a-4p Larry 8a-4p 8a-4p Gary
4p-8p Tune 4p-8p Tune 4p-8p Ric 4p-8p Ric 4p-8p Eduardo 4p-8p Larry 4p-8p Eduardo
8p-12a Hiro 8p-12a Hiro 8p-12a Hiro 8p-12a Mizuno
CAL data CAL data CAL data High energy muon data VDG data VDG data VDG data
2CAL_LO Muon Peak vs CAL_TACK
Sasha Chekhtman (NRL)
Muon peak 0 for tack-20 (avg. over logs)
3CAL_LO shaper time (all logs)
Sasha Chekhtman (NRL)
4CAL_LO Optimum CAL_TACK (all logs)
Sasha Chekhtman (NRL)
5TKR 3-in-a-row Muon Peak vs CAL_TACK
Sasha Chekhtman (NRL)
Muon peak 0 for tack-20 (avg. over logs)
6TKR 3-in-a-row shaper time (all logs)
Sasha Chekhtman (NRL)
7TKR 3-in-a-row Optimum CAL_TACK (all logs)
Sasha Chekhtman (NRL)