Title: NUCLEAR INDUSTRY OF RUSSIA TODAY AND TOMORROW


1
15-th Conference of the Pacific Nuclear Society
NUCLEAR INDUSTRY OF RUSSIA TODAY AND TOMORROW
S.I. ANTIPOV NUCLEAR SOCIETY OF RUSSIA
October 15-20, 2006
2
Rosatom today
Design institutes
Fundamental science and education
Fuel cycle enterprises
Nuclear industry
Construction abroad and export
Construction
2
3
Technical science and general education
  • More than 50 scientific institutions, 10
    industrial educational organizations, including
  • 6 state science centers
  • 2 federal nuclear centers

Main areas
  • Perspective developments in the area of
    fundamental and extreme features of the substance
  • Research and developments of the perspective
    power technologies based on the atom nucleus
    energy
  • Application research aimed at the improvement of
    the economic features, safety and reliability of
    the developed nuclear energy facilities and the
    fuel cycle technologies
  • Scientific research aimed at the identification
    of the growth points and targeted at the
    innovative development beyond the industry tasks
  • Training of the high qualification specialists
  • Training, continuous training and qualification
    improvement

3
4
DESIGN
There are more than 30 design, development,
technological, research organizations provide
  • Development and elaboration of modern designs
    for NPPs and nuclear fuel facilities
  • Designs follow-up of the the operating Russian
    NPPs
  • Design follow-up during construction of the NPPs
    abroad

4
5
Nuclear fuel cycle
Availability of the national technology from the
uranium mining to the nuclear fuel manufacturing
The NFC enterprises provide nuclear fuel for 31
NPP units in Russia and approximately same number
of the NPPs abroad.
5
6
Construction (today)
  • Construction of new nuclear
  • power industry facilities
  • Construction of the nuclear fuel cycle
  • facilities for NW and SNF management
  • Upgrading and modernization
  • associated with the NPP lifetime extension

6
7
NUCLEAR POWER INDUSTRY OF RUSSIA
7
8
Nuclear power industry
  • Rosenergoatom a state power company performing
    the functions of an operating utility and
    managing 10 NPPs of 23,2 GW of installed capacity

8
9
Dynamics of the capacity growth in the former
USSR and Russia
On June 27, 1954 the world commercial nuclear
power plant was started and connected to the grid
in Obninsk with capacity of 5 thousand kW
  • It was planned in the former USSR by 2000 to
    construct up to 72 GW of the installed nuclear
    power capacities
  • The consequences of the Chernobyl accident led
    to submission and later on to elimination of the
    nuclear construction program in the country
  • The first, after over than 10 years of
    stagnation,unit 1 of Rostov NPP was started up
    in 2001.
  • Nowadays the installed capacity of the operating
    NPPs in Russia is 23,2 GW

9
10
NPPs of Rosenergoatom
Bilibino
Kola
Leningrad
Kalinin
RBMK-1000 VVER-1000 VVER-440 BN-600 EGP-6
Kursk
Smolensk
Balakovo
Beloyarsk
Volgodonsk
Novovoronezh
10
11
Electricity generation at Russian NPPs in
1992-2005 (forecast for 2006-2010)
11
12
Load and availability factors of Russian NPPs in
1992-2005 (forecast for 2006-2010)
12
13
Trend of operational events at Russian NPPs in
1992-2005
13
14
Trend of the reactor scrams in Russia and
worldwide (according to WANO methodology) in
1992-2005
14
15
Collective irradiation doses at
NPPs (man.Sv/unit)
15
16
Perspectives of nuclear power industry and
nuclear industry development in Russia
16
17
Main legislative documents
  • Program of nuclear power industry development in
    the Russian Federation, approved by the
    President of the Russian Federation
  • Plan of the first priority activities for
    implementation of Program of nuclear industry
    development in the Russian Federation
  • Federal target-oriented program Development of
    nuclear power industry of Russia in 2007-2010 and
    for the perspective up to 2015, approved by the
    Government of the Russian Federation

17
18
Interaction of the state and commercial entities
in the construction of the NPP
???????
ROSTECHNADZOR
ROSENERGOATOM Operating utility
Generation
Maintenance
Scientific support
NPP General Designer
Reactor General Designer
Scientific Leader
?research instities
Specialized companies
NPP construction and installation companies
NPPs
Technical star-up manager
Design bureaus, reactor design institutes
Design institutes
18
19
Construction and commissioning of the new NPP
units
Rostov NPP, unit 2,VVER-1000
Beloyarsk NPP, unit 4BN-800(880)
Kalinin NPP, unit 4VVER-1000
BELOYARSK 4 The Urals
SMOLENSK 2 1 Center
SMOLENSK2 4 Center
SMOLENSK 2 3 Center
SMOLENSK 2 2Center
LEN 2 1 N-West
LEN 2 2 N-West
LEN 2 3 N-West
LEN 2 4 N-West
Installed capacity by 2020 up to 40 GW
START UP 19,9 GW
KOLA 2 1 N-West
ROSTOV 3 N.Caucasus
N-VOR 2 1 Center
ROSTOV 4 N.Caucasus
KURSK 2 1 Center
N-VOR 2 2 Center
KURSK 2 2 Center
KURSK 2 3 Center
KURSK 2 4 Center
ROSTOV 2 N.Caucasus
KALININ 4 Center
NVOR 4 Center
NVOR 3 Center
KOLA 2 N-West.
LEN 2 N-West
KOLA 1 N-West.
LEN 1 N-West
DECOMMISSIONING 3,7 GW
19
20
NEAR FUTURE OBJECTIVES
  • Improvement of the economical efficiency in
    production of electrical and thermal energy under
    condition of safe NPP operation

VVER-1500 (1600)
  • Elaboration and demonstration of the improved
    technologies in electricity production, closing
    of the nuclear fuel cycle

KLT-40?
BN-800 (880)
  • Development of regional nuclear industry for
    production of heat and electricity, fresh water
    on the basis of small capacity reactor
    installations for North or South regions

20
21
GROWTH OF THE GENERATING CAPACITIES
TW-hr./year
Power industry
NPPs
21
22
TASKS FOR THE INDUSTRY AND CONSTRUCTION COMPLEX
  • Orientation of the energy machine-building
    facilities for manufacturing minimum 2 sets of
    equipment annually for the internal market of
    Russia
  • Restoration of the construction complex to ensure
    erecting minimum 15 nuclear power units at
    several sites with the pace of commissioning at
    least 2 NPP units annually starting with 2012
  • Restoration of the training system for
    construction and installation personnel
  • Installation of the advanced construction and
    installation technologies with the purpose to
    improve the construction quality, minimize the
    duration and decrease the costs
  • Development of the construction management
    program to address the simultaneous construction
    of 15 NPP units at the territory of the Russian
    Federation

22
23
PERSPECTIVE AREAS IN SCIENTIFIC AND RESEARCH
COMPLEX OF ROSATOM
  • The Russian science did not make a mistake in the
    selection of the strategic direction for
    development of the nuclear industry
  • The main tasks
  • In the fuel supply
  • transition from U-235 to U-238 and Th-232, which
    allows to receive practically unlimited stores of
    the raw materials
  • Closing of the fuel cycle
  • Testing of the technology of water chemical
    treatment for SNF from the uranium reactors with
    separation of the Plutonium and packet of the
    high-active waste
  • Demonstration of the pellet-type and
    vibration-packed uranium-plutonium fuel for BN
    reactors
  • Commencement of the design and development
    activities in the areas of nitride fuel, dry NW
    reprocessing, young actinides transmutation etc.

23
24
PERSPECTIVE AREAS IN SCIENTIFIC AND RESEARCH
COMPLEX OF ROSATOM
  • Main tasks
  • In the reactor installations
  • next generation of VVER-1100-1200
    VVER-1500-1600
  • next technological step BN-800 (880) and
    try-out of the production technologies
  • closing of the uranium-plutonium fuel cycle
  • Design and development activities (at different
    stages)
  • designs of BN-1800, BN-GT and fast reactors with
    heavy metal coolant SVBR, BREST
  • other perspective scientific developments

24
25
  • THANKS FOR
  • YOUR ATTENTION