WMS Investigates Provo, Utah - PowerPoint PPT Presentation

About This Presentation
Title:

WMS Investigates Provo, Utah

Description:

Import 17 USGS 7.5 minute quads. 30m resolution. UTM projection ... Calibrate flow rates to gaging station records (HEC-1) Input Reservoirs (Deer Creek) ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 11
Provided by: ryanmu
Category:

less

Transcript and Presenter's Notes

Title: WMS Investigates Provo, Utah


1
Provo River Watershed Modeling with WMS
Ryan Murdock
2
Creation of Hydrologic Model
  • Import 17 USGS 7.5 minute quads
  • 30m resolution
  • UTM projection
  • Import 250K Digital Raster Graphic (DRG)

3
DEMs and DRG
4
DEM Processing
  • Fill no data cells
  • Smooth DEM
  • Compute flow directions flow accumulations
  • Convert raster streams to feature arcs
  • Choose outlet
  • Set accumulation threshold
  • Delineate basin boundaries

5
FlowAccumulations(threshold 1000)
6
Delineated Basinelevation1200m-3800m
7
More Data
  • USGS gaging stations
  • Provo
  • Vivian Park
  • Heber
  • Land use/land cover data
  • CN extraction

8
Completing the Model
  • Create and study sub-basins
  • Calibrate flow rates to gaging station records
    (HEC-1)
  • Input Reservoirs (Deer Creek)

9
Further Analysis
  • Analyze lag time time of concentration
    approaches
  • Robustness of equations
  • Sensitivity to slope, area, and location
  • Try multiple methods on same area
  • Compare results

10

Water Resources Engineers at work
Write a Comment
User Comments (0)
About PowerShow.com