2AIV and Testing
- The Test Plan describes the baseline for the
activities required for all tests under MPE
responsibility including the test facilities - Dedicated DV Plans covering all AIV activities
incl. test reports are issued and enforced by the
manufacturers of items deliverable to MPE - In the following, Test Sequences combined with
AIV/Test Schedules are shown to illustrate those
activities, where the main effort is spent and
which require most of the available test time
3Test Level Component Tests at MPE
4QM Detector Module 8 Design Verification
(Environmental Testing)
5QM Detector Module 8 Design Verification
(Environmental Testing)
6QM Detector Module 8 Spectral Calibration and
Glitch Investigation
7Readout and Control Scheme for Detector Module
Testing
8QM Detector Module 8 Spectral Calibration and
Glitch Investigation
9Test Level Subsystem Tests at MPE/MPIA
- GeGa Detector Modules and Array AIV
10AIV of QM GeGa Detector Arrays
11AIV of QM GeGa Detector Arrays
12Configuration of CQM Array
SKY
FPU
13AIV of FM GeGa Detector Arrays
14AIV of FM GeGa Detector Arrays
15AIV of FS GeGa Detector Arrays
16AIV of FS GeGa Detector Arrays
17Test Level ILT at MPE
18General Instrument AIV Sequence
19Overall Configuration of ILT Set-up
20AVM Instrument Test Sequence
21AVM Instrument Test Sequence
22EMC Conducted Susceptibility Test (common mode)
for Signal Lines
23CQM/AVM Instrument Test Sequence
24CQM/AVM Instrument Test Sequence
25PFM Instrument Test Sequence
26PFM Instrument Test Sequence
27FS Instrument Test Sequence
28FS Instrument Test Sequence