NOAA N Prime Downlink Frequency - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

NOAA N Prime Downlink Frequency

Description:

Commercial equipment using this frequency band being sought in order to assess ... interference basis to systems operating with a primary status within the band. ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 6
Provided by: christophe244
Category:
Tags: noaa | band | downlink | frequency | prime | the

less

Transcript and Presenter's Notes

Title: NOAA N Prime Downlink Frequency


1
  • NOAA N Prime DownlinkFrequency
  • June 2008
  • Chris OConnors, NOAA/NESDIS/OSDPD

2
NTIA's Spectrum Planning Subcommittee
  • As requested by DoC Office of Radio Frequency
    Management (ORFM) necessary documentation for
    Argos DCP downlink at 465.9875 MHz being prepared
  • Expect submission to June meeting of NTIAs
    Spectrum Planning Subcommittee through ORFM

3
MetOp Field Test
  • Task issued to Alion through existing OSD Ground
    System contract
  • Initial planning completed
  • Completion of field testing requested by
    mid-summer
  • Commercial equipment using this frequency band
    being sought in order to assess impact of MetOp-A
    Argos transmissions

4
Discussions with FCC
  • Initial discussions with FCC indicate their
    willingness to work with NOAA on seeking a
    solution for access to 460-470 MHz on
    non-interference basis
  • FCC suggested including commercial users of this
    band in future discussions

5
Way Forward
  • Conclude on the coordination by November 2008 in
    order to get NTIA approval before the launch
  • Request the frequency assignment be placed in the
    Government Master File (GMF). 
  • The assignment would be on a non-interference
    basis to systems operating with a primary status
    within the band.
Write a Comment
User Comments (0)
About PowerShow.com