Title: NATIONAL WAR GAMING CENTRENWGC
1NATIONAL WAR GAMING CENTRE(NWGC) NATIONAL DEFENCE
UNIVERSITY ISLAMABAD-PAKISTAN
2ROLE OF NDU
- To groom senior civil and military leadership in
security and defence related fields as well as
crisis management. - To act as a think tank for policy making in the
field of defence and security. - Provide strategic input to senior
politico-military leadership.
3INTRODUCTION
4CHRONOLOGY OF EVENTS
- NDU Teams Ist Visit to Turkey - Feb 2004
- Presentation by Dr J Roland at - Apr 2005
- Islamabad
- First Meeting of Steering
- Committee - Feb 2006
- Commandant's visit to Turkey - Jun 2006
- Signing of Contract with Rolands - Sep 2006
- Posting of JTLS Team to NDU - Nov 2006
-
5CHRONOLOGY OF EVENTS
- Hardware Infrastructure Deployment - Dec 06-Apr
07 - 6 Weeks training of Team at Monterey - Feb-Mar
07 -
- Inauguration of JTLS at NDU - Apr 07
- Commencement of Data Base Work - May 07
- Visit President of Pakistan - 29 Jun 07
- Tactical Test Runs - Sep-Oct 07
- Operational Test Runs - Nov-Dec 07
- Scenario and Database Development -
To Date
6ORGANISATION OF NWGC
7CURRENT ORG OF NWGC (8xOFFICERS)
CENTRE HQ (DIRECTOR) 1 x Brig
PLANNING / COORD / EVAL 1XLt Col 1 x NCO
SYSTEM ADM/DBA GIS 3 x Civ Offrs
COMBAT MODEL DEVELOPMENT / OP CELL 3 x
Offrs (Army,Navy,Air)
8EXPECTED ORGANISATION
CENTRE HQ (EX DIRECTOR) 1 x Brig 1XCol
PLANNING / COORD / EVAL 4 x Offrs, 2 x NCOs
SYSTEM ADM/DBA GIS 4 x Offrs, 6 x Assts
COMBT MODEL DEV / OP CELL 16 x Offrs, 10 x Assts
9HEX TERRAIN WORK
- a. All roads in Area of Operation including
their categorization into good, fair and bad
roads. - b. Rail network.
- c. Large canals essential for ops.
- d. Major built up areas down to town level.
- e. Air infrastructure incl air bases.
- f. Port infrastructure.
- g. Fine tuning of mountains into low,medium and
high mountains. - h. Imp bridges and tunnels.
- j. Pipelines.
- k. Classification of rivers and their portions
into navigable and non navigable ones. - l. Lakes and other barriers.
- m. Artificial obstacles ,sand berms.mine fields.
10DATA BASE AND TERRAIN DEVELOPMENT
- Preliminary stage, Data base and terrain
development will take approx 5 more months before
first test run of a war game can be conducted. - Use of open source (Google Earth)
- Digital maps
- Use of Geo Rectified Satellite Imagery
- Development of a software, where you dont have
to essentially use TMU.
11Image By Google Earth
12GIS Software To Link CADRG With Google Images
13Use of Satellite Imagery With JTLS
Hex
14(No Transcript)
15ACKNOWLEDGEMENTJTLS CAPABILITIES
- User Friendliness
- Flexibility
- Operational and Strategic Utility
- Cost Effectiveness
- All encompassing
16CHALLENGES FACED
- Terrain-Data base interface in High mountains
- Artillery Fire (hex to hex), high trajectory not
addressed - Artillery Deployment challenges cannot be
realistically modeled. - Rail-road Movement
- Inherent limitation
- Value of Prepared defences(modelling parameters)
- Strategic and Operational summary (at least every
24hrs) - Indigenization of data base (specially logistics)
- New weapon systems