A National Prioritized Project Pipeline and
Environmental Operational Program



Republic of Turkey Ministry of Environment and
Forestry
2
Background
  • Environmental Heavy Cost Investments Planning
    (EHCIP) Project (Nov. 2003 Nov. 2005)
  • Investment Packages Component of the project
  • Long list of the projects collected through
    questionnaires
  • 2 widely participated workshops (April 2004 and
    June 2005) from all the relevant stakeholders
    including governmental organizations, NGOs,
    universities, municipalities
  • "Project Ranking Methodology and "Project
    Prioritization Manual were identified.
  • Screening and ranking of the projects
  • Selection of the 6 demonstrative investment
    projects (solid waste, waste water, air quality)
    under EHCIP Project

Republic of Turkey Ministry of Environment and
Forestry
3
Background EHCIP Project
Selection of 6 Demonstrative Project
Request for projects for pipeline
Response rate 50gt250 project ideas
ScreeningEU relevanceCommenced?
Project rankingmethodology
Stakeholderworkshop
Revise methodRanked list
12 projectssuitable
6 out of 12selected
Pre-appraisalof16 projects
Republic of Turkey Ministry of Environment and
Forestry
4
Background EHCIP Project
Assessment of Prioritization under EHCIP Project
  • The process
  • Systematic
  • Rational
  • Stakeholder involvement
  • Free from political interference
  • Results The six highest ranked projects
  • Air (1)
  • Karabük AQ management project
  • (No investment component)
  • Water (2)
  • Nevsehir WWTP project (2006 Program)
  • Tokat WWTP project (2006 Program)
  • Waste (2)
  • Çanakkale SWM Project (2005 Program)
  • Kusadasi SWM Project (2005 Program)
  • Industrial Pollution Control (1)
  • Dilovasi OID Pollution Control Project
  • (under tendering through external credit)

Republic of Turkey Ministry of Environment and
Forestry
5
Background
  • New Prioritization Study (2006-2007)
  • Questionnaires were sent to 450 municipalities
    over 50.000 populations (census 2000) and about
    300 applications were received.
  • Complementary data from Iller Bank, TurkStat,
    SPO, DSI, Treasury.
  • The same screening and ranking criteria as
    defined by EHCIP Project

Figure 1 Distribution of the project proposals
Republic of Turkey Ministry of Environment and
Forestry
6
Screening and Ranking Criteria
1) National Project Prioritization List
  • A. Screening Criteria

B. Ranking Criteria
7
RESULTS - Prioritized Pipeline
  • After the screening, the national prioritized
    pipeline is composed of totally 131 projects
  • 61 wastewater projects
  • 52 solid waste projects
  • 18 drinking water projects
  • Finally, 3 separate sectoral pipelines for
  • - wastewater,
  • - drinking water,
  • - solid waste.

Figure 2 Distribution of the ranked projects
The final pipeline is published as sectoral
ranking lists in the website of the MoEF
(www.did-cevreorman.gov.tr). Also, a Final Report
on the prioritization study is published on the
website.
8
RESULTS Indicative List of Major Projects
  • An indicative shortlist of the prioritized major
    projects (gt10 M) is annexed to Environmental
    Operational Program (OP-Env) for 2007-2009 period
    with the relevant financing tables
  • Technical Assistance Projects are being
    undertaken to prepare IPA investment packages for
    the projects in the indicative list of OP-Env.

9
ENVIRONMENT OPERATIONAL PROGRAM
  • State of Play with EOP
  • EOP sets the Program Strategy and Financial Plan
    for environment sector under IPA Program for
    2007-2009 Period.
  • Final Draft of Environment OP was submitted to
    the European Commission in October 2007.
  • Approval of EOP is expected by the end of 2007.

10
EOP PROGRAM STRATEGY
Priority Axes
Priority Axis 1 Improvement of water supply,
sewerage system and wastewater treatment
Measure 1.1 Imrpovement of water supply quality
Measure 1.2 Improvement of recieving body
quality
Priority Axis 2 Development of integrated solid
waste management
Measure 2 Increasing of waste recycling and
improvement of sanitary landfill systems
11
EOP PROGRAM STRATEGY
Priority Axes
Priority 3 Technical Assistance
Measure 3.1 Enhancing the management of
Environment Operational Program
Measure 3.2 Enhancing the planning capacities of
the Final Beneficiaries
12
EOP FINANCIAL TABLE FOR 2007-2009
13
EOP INDICATIVE LIST OF MAJOR PROJECTS
14
INDICATIVE MAJOR PROJECTS
  • Priority 1
  • 12 Wastewater Projects
  • 4 Drinking Water Projects
  • Priority 2
  • - 10 Solid Waste Projects

15



Republic of Turkey Ministry of Environment and
Forestry
Thank you for your attention