John Miall Risk Manager City of Asheville, NC - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

John Miall Risk Manager City of Asheville, NC

Description:

2 4 times greater risk of heart disease. 60 65% have hypertension. 2 ... 47 billion in productivity forgone due to disability, absence, and premature mortality ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 13
Provided by: carolyn98
Learn more at: https://archive.ahrq.gov
Category:

less

Transcript and Presenter's Notes

Title: John Miall Risk Manager City of Asheville, NC


1
John MiallRisk ManagerCity of Asheville, NC

Asheville Diabetes Disease Management Project
2
The Asheville Project
3
Diabetes-Related Comorbidities
  • 24 times greater risk of heart disease
  • 6065 have hypertension
  • 24 times greater risk of stroke
  • 6070 have some degree of nervoussystem damage
  • Leading cause of adult blindness
  • Leading cause of ESRD (40 new cases)
  • gt50 lower limb amputations

End-Stage Renal Disease
4
Diabetes-Related Indirect Costs
  • 8.3 sick-leave days annually
  • 1.7 sick-leave days for employees without
    diabetes
  • 47 billion in productivity forgone due to
    disability, absence, and premature mortality

5
Patient Incentives and Care Model
  • Patient selection / recruitment
  • Patient education Mission St. Josephs
    Diabetes Center
  • Matching patients to pharmacists
  • Incentives
  • PBM co-pay waivers
  • Labs without co-pays
  • Glucose meters
  • The operative word in pharmaceutical care is
    care (Madge testimonial)

Pharmacy Benefit Manager
6
How They Do It
  • Patient making better food choice. Blood
    glucosemuch improved. 2 x 1.5c cm wound RLE.
    Referredto physician for evaluation and therapy.

7
Clinical OutcomesAvg. Glycosylated Hemoglobin
HbA1c
8
City of Asheville Medical Costs
Average annual aggregate medical claims
including prescription drugs for diabetes
9
City of Asheville Diabetes
Sick-Leave Usage
Sick leave days
10
Sick Leave Usage By Time In Program
Sick leave days
11
QUALITY OF LIFE
  • Baseline
  • At 14 Months into program

Source SF-36 Form
12
Frequency/Severity Matrix
Severity
High FrequencyLow Severity
High FrequencyHigh Severity
Frequency
Low FrequencyLow Severity
Low FrequencyHigh Severity
Write a Comment
User Comments (0)
About PowerShow.com