Title: IFR GPS Installation Certification


1
IFR GPS InstallationCertification
  • Mike Palmer

2
Outline
  • Topics discussed at GPS Workshop in May 2002
  • TCCA position on some topics
  • Discussion of each topic

3
Approved Model List STC
  • The AML STC will address the issue of a common,
    streamlined approach to certification for a large
    number of IFR GPS installations.
  • This presentation looks at the other IFR GPS
    installations.

4
Use of Specified Data
  • Specified data has been used for installation of
    radios and VORs. Some IFR GPS installations may
    be installed in the same way and some can not.
  • TCCA is investigating the criteria and process
    for the installation of IFR GPS.

5
Potential Criteria for Application of IFR GPS
Streamlined Process
  • Normal or VLA category airplane
  • TSO C129a Class A1, A2 C146a Gamma Class 1
  • GPS drives a dedicated course deviation indicator
    (CDI) in the primary field of view
  • GPS can not drive a cross-side display
  • GPS provides guidance to an autopilot only when
    enroute and only for lateral deviation

6
Potential Criteria for Application of IFR GPS
Streamlined Process (continued)
  • No installation-specific instructions are
    required in a Flight Manual Supplement
  • No change is required to the Instructions for
    Continued Airworthiness

7
Part 27 IFR Installations
  • TCCA Position The criteria for acceptable human
    factors and autopilot interactions are
    sufficiently different between fixed- and
    rotary-wing that the recommendations of the GPS
    Working Group can not be applied to Part 27 IFR
    GPS installations. The Policy Letter will not
    include helicopters.

8
TSO C146a IFR Installations
  • TSO C146a equipment can support three types of
    approaches LNAV, LNAV/VNAV (APV) and APV II.
  • TCCA Position The installation requirements for
    C129a equipment are appropriate for C146a Gamma
    Class 1 equipment and existing guidance supports
    certification of Gamma Class 1.

9
Criteria for IFR GPS Annunciators
  • The Policy Letter will define
  • Criteria for the location of annunciators
  • Criteria when annunciators are not required
  • Criteria will presume the GPS control and display
    unit is mounted in the radio stack immediately
    adjacent to the pilots position.

10
Principles for Specified Data
  • Data provided by the equipment manufacturer must
    address the elements of the installation
    necessary to maintain compliance to the basis of
    certification or it can not be used as specified
    data.
  • TCCA position The Policy Letter will include
    criteria to be satisfied by equipment
    installation instructions to be used as specified
    data.

11
Flight Test for IFR GPS Installed to Specified
Data
  • The criteria for using specified data is such
    that a simple flight test plan is sufficient.
  • TCCA position Every IFR GPS must be flown to
    demonstrate proper function when installed.

12
Persons Qualified to Witness Flight Test
  • TCCA position The current provisions of ACPL 17
    4.10.2 will be retained. The designation of the
    individual to witness IFR evaluation flights will
    be by letter from the RMAC.

13
The Size of the Box
  • Balancing
  • Modest steps and well-defined scope with a known
    publication date
  • and
  • Practical process with wide applicability but
    unknown publication date

14
Discussion
  • Introduce the authors of the Policy Letter
  • Respond to questions about the positions taken by
    TCCA
  • Work through a list of topics that we think will
    help us continue writing the Policy Letter

15
List for Discussion
  • Combination of Approved and Specified Data
  • Compliance with Operating Regulations
  • Removal of Not for IFR Limitation Data
  • Oversight of AMOs Using Specified Data
  • Multi-Function GPS Equipment