Title: Pre-Inspection Briefing


1
Pre-Inspection Briefing
  • Company Name
  • Location
  • Date of Presentation

2
Introductions
  • Host team
  • Inspection team
  • Plant/Plant Site personnel
  • Plant or Plant Site manager
  • Records
  • Administrative and logistics arrangements
  • Security, legal, other

3
Management, History Organization
  • History of the parent company
  • History of the company and basic information
  • Management, organization, operations, environment

4
Business Manufacturing Operations
  • Overview of products/business
  • Description of general plant site manufacturing
    to include operations that should not be
    interrupted

5
Absence of Schedule 1 Chemicals
  • If Schedule 1 chemicals are present on-site,
    include explanation
  • If no Schedule 1 chemicals are present
  • Point out the absence of Schedule 1 indicators
    during site tour and inspection
  • lack of precursors of Schedule 1 chemicals
  • proximity of plant site to residential areas
  • routine personal protective equipment used
    on-site
  • materials of construction
  • medical facilities not prepared to respond to
    Schedule 1 exposures.
  • etc.

6
Declaration
  • Declaration figures (as submitted)
  • Changes or amendments to the declaration

7
Physical Layout
  • List production units, buildings, roads, fences,
    obstacles, GPS reading point, etc.

8
Definition of Plant Site(s) to be Inspected
  • Define declared plant(s) plant site
  • Use maps, charts, diagrams, as appropriate
  • Outline common infrastructure (warehouse,
    utilities, waste disposal, etc.)
  • Identify PSF production plant(s)

9
Declared Activity Overview
  • Emphasize products and not feedstock chemicals
    (keep generic)
  • List all Scheduled chemicals on the plant site
    even if under threshold levels

10
General Safety
  • Personal protection equipment requirements
  • Safety hazards and safety procedures
  • Location of alarms and response procedures
  • Location of medical facilities

11
Declared Operation Safety
  • Safety requirements/restrictions specific to the
    declared operation(s) or declared area(s)
  • Hazards specific to declared operation(s)

12
Logistics Administrative Information
  • Working hours (Administration area and Plant)
  • Working spaces
  • Inspectors and host team work spaces, and
    briefing areas
  • Communications
  • Transportation
  • Lodging and meals
  • Security and badging procedures
  • Other

13
Proposed Inspection Plan
  • Tuesday, Date
  • 500 PM Start of inspection
  • Wednesday, Date
  • 800 AM - Arrival, sign in, and badging
  • AM - Plant Safety Refresher
  • AM - Walking Tour of UDOC Plants
  • 1200 PM Lunch
  • PM Plant(s) Inspection, Declaration review
  • 500 PM End of Inspection
  • 600 PM - Leave Site
  • Thursday, Date
  • 800 AM - Arrival, sign in, and badging
  • AM - IT Preliminary Findings (PF) writing
    review
  • 1200 PM- Lunch
  • PM IT PF writing, PF review, sign PF
  • PM Leave Site, return to point of entry
    (Dulles, VA)